Responds to IE Bulletin 79-03, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Mfg by Youngstown Welding & Engineering Co. North Anna 1 Uses No SA-312 Piping.Surry 1 & 2 Records Are Still Under Review
ML18114A537
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 04/16/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7905080164
Download: ML18114A537 (2)


Text

/.

v~

VIBOINIA ELECTBIC AND PowBR CoMPANY RICHIIOJlfD,V1:aonuA 232~1 19 ~PR \\ B A 9 : *c ~

April 16, 1979 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II Serial No.

156A 101 Marietta Street, Suite 3100

,Atlanta, Georgia 30303 PO/DLB:scj Docket No License Nos.

DPR-32 DPR-37 NPF-4

SUBJECT:

I.E.Bulletin 79-03

Dear Mr. O'Reilly:

This is in response to IE Bulletin 79-03, "Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Manufactured by Youngs-town Welding and Engineering Company".

Following is the informa.tion request-ed for Surry Unit Nos. 1 and 2 and North Anna Unit Ro. 1.

Surry Power Station Unit Ros. land 2 Vepco and Stone and Webster are currently reviewing records to determine if any of the subject type 304 or 316 SA312 piping is installed at Surry in safety related systems.

As of this writing it is known that 300 feet of Youngstown fusion welded type 304SS pipe was purchased from Albert Pipe Supply Company for modification to the Low Bead Safety Injection System in September 1975. It is expected that Items 1, 2, and 3 of IE Bulletin 79-03 will be completed by June 1, 1979. The completion date of any program for volumetric examination required by item 3 will depend on the extent of the piping application determined by items 1 and 2.

North Anna Power Station Unit No. 1 Vepco and Stone and Webster have completed a records review to determine if any of the subject piping i1 installed in North Anna Unit 1 1afety related 1ystem.e.

We have found no Youngstown pipe installed in Unit 1 1afety related 1y1tems.

\\,-/f?'!

\\

r i i

,I Jf

.. \\

7fo!,I OFJtICIAL COPY

I' VJB01NIA Eu:CTBIC AND PoWZ:B CoMPAKY TO Mr. James P. O'Reilly 2

One length of pipe was aupplied from a source traced to Youngstown.

This pipe is 20 feet in length and is 12 inch Schedule 40S, Type 304. It is in storage and is at its full "as procured" length.

This pipe length bas been placed on quality control "hold" awaiting ultimate disposit:ion.

cc:

Office of Inspection and Enforcement Very truly yours, LJl /J4.-v C. M. Stallikg~

Vice President-Power Supply and Production Operations Division of Reactor Construction Inspection

  • .'.',