ML18113A980

From kanterella
Jump to navigation Jump to search
Summarizes 790321 Telcon W/S&W.Reanalysis of Piping Sys for Plants Must Include Identification of Small Pipe Sizing & Analysis of All safety-related Piping.Reanalysis of Primary Sys Piping Not Required
ML18113A980
Person / Time
Site: Beaver Valley, Surry, Maine Yankee, FitzPatrick  Dominion icon.png
Issue date: 03/21/1979
From: Stello V
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7904090250
Download: ML18113A980 (3)


Text

e UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20566 e

MAR 2 1 1979 NOTE TO FILES:

March 21, 1979 TELECON WITH STONE AND WEBSTER X

I called Mr. Kennedy of Stone and Webster to discuss my March 20, 1979 memo regarding future action to resolve outstanding seismic questions on the five shut-down plants.

The purpose of the call was to clarify the type of reanalyses required for each plant.

Discussed were:

1. Sizes of small piping that is designed using chart or other manual methods should be identified. If the methods used for such small piping are different than the methods currently used the differences should be noted and justified.
2.

Reanalysis of primary system piping performed by NSSS is not required.

3.

All safety related piping (other than Item l and 2) and supports are to be analyzed or reanalyzed as needed using an acceptable code.

~~

Victor Stello,,----jr.,I Di rector Division of Operating Reactors

NOTE TO FI LES:

e UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MAR 2 1 1979

March 21, 1979 TELECON WITH STONE AND WEBSTER I called Mr. Kennedy of Stone and Webster to discuss my March 20, 1979 memo regarding future action to resolve outstanding seismic questions on the five shut~down plants.

The purpose of the call was to clarify the type of reanalyses required for each plant.

Discussed were:

l. Sizes of small piping that is designed using chart or other manual methods should be identified. If the methods used for such small piping are different than the methods currently used the differences should be noted and justified.
2.

Reanalysis of primary system piping performed by NSSS is not required.

3.

All safety related piping (other than Item 1 and 2) and supports are to be analyzed or reanalyzed as needed using an acceptable code.

' r:~-

d~

Victor Ste 11 o,.---,;Jr., 1 Di rector Division of Operating Reactors.