ML18113A645

From kanterella
Jump to navigation Jump to search
Forwards LER#78-038/03L-0
Date released: 12/10/2018 Download: ML18113A645


LER#78-038/03L-0 on 781030:boric Acid Flow from Boric Acid Tanks to Blender Was Interrupted Due to Crystallized Boron Blockage at Elbow in Line 1-CH-356-152.Obstruction Was Removed & Pipe Flow Returned to Normal
ML18113A646
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/17/1978
From: Baucom T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18113A646 (2)
Forwards LER#78-038/03L-0
ML18113A644
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/20/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A644 (1)