ML18113A621

From kanterella
Jump to navigation Jump to search
Forwards LER#78-034/01T-0
Date released: 12/10/2018 Download: ML18113A621


LER#78-034/01T-0 on 781101:during Routine Inspec on 781027 It Was Noted That 17 Spare Process Piping Containment Penetrations on Unit 1 & 23 on Unit 2 Were Not Capped,But Inside Ends Sealed in Auxiliary Bldg,Due to Constr Error
ML18113A622
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/14/1978
From: Baucom T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18113A622 (2)
Forwards LER#78-034/01T-0
ML18113A620
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/14/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A620 (1)