Responds to 781003 NRC Ltr Re Violations Noted in Inspec Repts 50-280/78-22 & 50-281/78-22.Corrective Actions: Special Requal Training Course Re Startup Procedures & Theory.Emphasis on SRO & RO Retraining
ML18113A613
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/26/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18113A612 List:
References
NUDOCS 7811130238
Download: ML18113A613 (3)


Text

RESPONSE TO VIOLATIO~S LISTED IN IE INSPECTION REPORT NOS. 50-280/78-22 AND _50-281/78-22 A. NRC CO~*[MENT:

Technicnl Specification 6.4.D requires that detailed written procedures provided for normal unit startup, operation, and shutdown shall be fo]lowed.

Contrary to the above, Surry 2 facility procedures were not followed on A?ril 8, 1978, in that:

1.

The initial reactor startup on Control Bank 'C' below the Technical Specifications 3.12.A minimum insertion limits, was r.ot logged nor was the reason for the event and corrective actions ta~en entered in the operator's or Shift Supervisor's log as

-::-2cai.::::-ed by Section 29.1 of Administrative Procedure 29.

2.

A c~:culation of the estimated critical position and documen-tatic~ of the actual critical condition was not completed on 0?-lC for one of the three reactor startups made on April 8, 1978 cs required by Operating Procedure 1.4.

~

~

T':-.= it=~ ~s correct as stated.

Although an ECP (OP-lC) had been cal-c~~a:~~ ~o:- the initial approach to criticality of Surry 2 on April 8th, t~e ~:? ~as never completed and the event was never logged in-the Control

?.::-::,:J.,>:,-:::-~:o-::-'s or the Shift Supervisor's logs.

It should be noted t~2: es~i=ated critical condition calculations were made for the subsequent a??:-~ac~es to criticality, however, a separate OP-lC was not filled ot1t as :-e~ui.:-ed.

Instead, corrections were made by line out on the earlier 0?-~C.

1.

Correction steps which have been taken and results achieved:

2.
3.

The F:CP procedure, OP-lC, w;:is changed on Aug. 23rd to provide a step for review and signatures immediately after calculo.tion nnd prior to completion of the procedure.

The Reactor Oper~tor ~nd Senior Reactor Operator involved in the startup h;i.ve suc-cPssfully comp1eted a special requalification training course Pmnhasi zing rP,1ctor start.up procedures ;1nJ tlll'ory.

Corrective steps which w.ill lw ti1kl*n to.1void further non-compli:1ncc.

Tlw :1l1ove stPps will avoid furthE)r non-compliance.

In ;1ddi.ti.on, inc*re:u;(*c.l cmph:1sis will bP ;iprl iC'd in SRO :1nd RO retraining st'ssinns on ;1cllwrence to procedures, propl*r cloc11mentation, usC' of 1/~t plots during startup ;md usP of nomp-graphs.

Tlw d:tt(' when full compl ianc-l' wi11 he achiC'VC'd.

Ful] compl i ~nee h.-1s lH*<'n,1(']1 i 1*\\*c*d.