NL-18-0153, Withdrawal of Alternatives FNP-ISI-ALT-05-02 and VEGP-ISI-ALT-04-02

From kanterella
(Redirected from ML18113A447)
Jump to navigation Jump to search

Withdrawal of Alternatives FNP-ISI-ALT-05-02 and VEGP-ISI-ALT-04-02
ML18113A447
Person / Time
Site: Vogtle, Farley  Southern Nuclear icon.png
Issue date: 04/23/2018
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-18-0153
Download: ML18113A447 (2)


Text

4 Southern Nuclear Regulatory Affairs 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 205 992 5000 tel APR 2 3 2018 205 992 7601 fax Docket Nos.: 50-348 50-424 NL-18-0153 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Withdrawal of Alternatives FNP-ISI-ALT-05-02 and VEGP-ISI-ALT-04-02 Ladies and Gentlemen:

In letter dated October 6, 2017 Southern Nuclear Operating Company (SNC) submitted for Nuclear Regulatory Commission (NRC) review and approval, proposed Alternatives FNP-ISI-ALT-05-02 and VEGP-ISI-ALT-04-02 for use of Alternative Requirements for American Society of Mechanical Engineers (ASME)

Class 1 Upper Level Instrumentation Lines on the Pressurizer for Farley Nuclear Plant Units 1 and 2 and Vogtle Electric Generating Plant Units 1 and 2, respectively.

Subsequent to the submittal of the proposed alternatives, on December 1, 2017, a teleconference was held between SNC and NRC personnel to discuss the proposed alternatives. During this meeting, it was determined that the proposed alternatives are not required to be submitted due to NRC previous approval of this issue as a construction code approval. Therefore, SNC is withdrawing FNP-ISI-ALT-05-02 and VEGP-ISI-ALT-04-02 from NRC review and approval.

This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at 205.992.6611.

Respectfully submitted, Cheryl A. G y art Regulate Affairs Director