ML18113A048
| ML18113A048 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/10/2018 |
| From: | Curry H South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NOC-AE-18003562, RIS-18-002 | |
| Download: ML18113A048 (3) | |
Text
South lexas Project Electric Generating Station P.O. Box 289 /MJdsworth. lexas 77483 -----------VVV\\r--
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 South Texas Project Units 1and 2 Docket Nos. STN 50-498; STN 50-499 Operator Licensing Examination Schedule
Reference:
NRC Regulatory Issue Summary (RIS) 2018-02 April 10, 2018 NOC-AE-18003562 File No. G30 10 CFR 55 r
STP Nuclear Operating Company is submitting the attached response to RIS 2018-02.
There are no commitments in this letter.
If you have any questions, please contact me at (361) 972-7327 or Mr. Adrian Culver at (361) 972-8604.
I'
Attachment:
NRC Form 536 STI: 34651969 enry T. Cur Manager, Operations Training
. ~- '
cc:
(paper copy)
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (08H04) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 NOC-AE-18003562 Page 2 of 2 (electronic copy)
Morgan, Lewis & Beckius LLP Paul Bessette U.S. Nuclear Regulatory Commission Lisa M. Regner Jennifer Bridges Kelly Clayton NRG South Texas LP Kevin Malcarney Jim von Suski!
Skip Zahn CPS Energy Kevin Pollo Cris Eugster L. D. Blaylock City of Austin William Sweeney John Wester Texas Dept. of State Health Services Robert Free
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)
- RRFoi,(, *
+~*
- lo:
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
- i.
~
OPERA TOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory
~*
C Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the EXAMINATION DATA Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of
.. +/
Management and Budge~ Washington, DC 20503. If a means used to impose an information collection
.,.,...jil<.**
does not display a currentiy valid 0MB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION I
SOUTH TEXAS PROJECT I I IV I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY CY CY CY 2020 2021 2022 2023 ESTIMATED NUMBER OF 1
1 1
1 LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF 0
0 0
0 NRG-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY CY CY CY 2020 2021 2022 2023 NUMBER OF REACTOR 8
8 10 6
OPERATORS NUMBER OF SENIOR REACTOR 13 1.1 6
6 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 3
2 2
3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 7/13/20 7/12/21 7/25/22 7/24/23 ALTERNATE DATE 8/10/20 8/9/21 8/22/22 8/21/23 NRG FORM 536 (11-2017)