ML18108A582
| ML18108A582 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/02/1976 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Parr O Office of Nuclear Reactor Regulation |
| References | |
| L-76-80 | |
| Download: ML18108A582 (3) | |
Text
NRC FARM 196 (2~76 I U.Se NUCLEAR REGULATORY IMISSION NRC DISTRIBuTION FDR PART 50 DOCKET MATERIAL DOCKET NUMBERS 5o-S>P FILE NUMBER TO:
MR OLAN D PARR ETTER ORIGINAL COPY DESCRIPTION ClNOTORIZED UNC LASS IF I ED PROP R E UHRIG INPUT FORM ENCLOSURE FROM: FLORIDA POWER & LIGHT CO MIAMI, FLA DATE OF DOCUMENT R->- ll DATE RECEIVED 3-5-74 NUMBER OF COPIES RECEIVED LTR CONFIRMING FPL'S COMMITMENT THAT THE DESIGN FOR ST LUCIE PLANT'2 WILL ACCEPTABLEY ACOIIMODATE NEUTRON STREAMING PHENOMENON.......
4 C
PLANT NAME: QY ~g~,~%~
SAFETY ASSXGNED AD:
OVA FOR ACTION/INFORMATION ASSIGNED AD :
ENVXRO
-lh-4 uRAN<ci CriIEF
~
PROJECT MANAGER;
- LXC, ST ~.
IIuL epk BRANCH CHIEF
~
PROJECT MANAGER :
LIC~ ASST REG FILE NRC PDR I & E GOSSICK & STAFF EN v NEER KNIGHT SIHIKXL PAVLICKI INTERNALDISTR I BUTION BENAROYA IPPOLITO
'PERATINGREACTORS STELLO E NST ALLARD SPANGLER SITE TECH GAMMILL STEPP HULMAN PROJECT MANAGEMENT BOYD P,
COLLINS HOUSTON PETERSON MELTZ REACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK OPERATING TECH EISENHUT SHAO BARR SCHWENCER GRIMES SITE ANALYSIS VOLIkIER BUNCH COLLINS KREGER HELTEMES SKOVHOLT LPD TIC NS ASLB AT & I SALTZMAN RUTBERG EXTERNALDISTRIBUTION L i NATL LAB REG, V-IE LA PDR CONSULTANTS SITE SAFETY & ENV R ANALYSIS DENTON & MULLER BROOKHAVEN NATL LAB ULRIKSON(ORNL)
CONTROL NUMBER NRC FORM 196 I2 76l
P. O. BOX 013100, MIAMI, FLORIDA 33101 0
FLORIDA POWER 5 LIGHT COMPANY March 2, 1976 L-76-80 Director of Nuclear Reactor Regulation ATTN:
Mr. Olan D. Parr, Chief Light Water Reactors Project Branch l-3 Division of Project Management U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Parr:
Re:
Neutron Streaming, St. Lucie Unit No.
2 (Docket No. 50-389)
This letter serves to document PPL's commitment that the design for St. Lucie Plant Unit No.2 will acceptably accommodate neutron streaming phenomenon, if any, within containment.
Yours very truly, Robert E. Uhrig Vice President REU: nch cc:
Jack R.
- Newman, Esq.
lu'*
ll'>
HELPING BUILD FLORIDA
0 li ff l