Guarantee of Payment of Retrospective Premiums
ML18108A059
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/18/2018
From: Wink R
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18108A058 List:
References
ULNRC06432
Download: ML18108A059 (3)


Text

Ameren MISSOURI Callaa Plant SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)

April 18. 2018 ULNRCO6432 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washinaton. DC 20555-0001 Ladies and Gentlemen: 10 Cf R 140.21 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 GUARANTEE OF PAYMENT OF RETROSPECTIVE PREMIUMS Pursuant to the requirements of 10 Cf R 140.21, Ameren Missouri hereby transmits the attached cash flow projection and certification to satisft the guarantee of payment of retrospective premiums as required by this regulation. This statement covers 2017 (actual) and 2018 (projected) and shows that.

if necessary. our cash flow would adequately cover payment of retrospective premiums within three months after submission of a statement.

It is Ameren Missouris intent to continue to make this report on an annual calendar year basis. A follow-up report covering actual data for 2018 and projecting cash flows for calendar year 2019 will be submitted by April 30, 2019.

This letter does not contain new commitments.

If there are any questions, please contact Roger Wink at (573) 676-8719.

Sincerely,

,-/ LJ 4Roger Wink Manager, Regulatory Affairs DRB Enclosure Enclosure to this letter contains sensitive infonnation.

Withhold from public disclosure under 10 CFR 2.390(a)(4).

Upon removal of Enclosure, this letter is uncontrolled.

SENSITIVE INFORMATION WITHHOLD UNDER 10 CfR 2.390(a)(4)

P.O. Box 620 FuIton, MO 65251 ArnerenMissoLcom

ULNRCO643 2 April 18. 2018 Page 2 of 3 cc: Mi. Kriss M. Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington. TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Klos Project Manager. Cal laway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 08H4 Washington. DC 20555-000 1

ULNRCO6432 April 18.2018 Page3of3 Index and send hardcopy to QA FiLe A160.0761 Hardcopy:

Certrec Corporation 6100 Western Place. Suite 1050 Fort Worth. TX 76107 (w!o enctosure)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distcil)ution:

F. M. Diya T. E. Herrmann B. L. Cox R. C. Wink T. B. Elwood B. A. Steinke

]. Covie Corporate Communications w/o enclosure NSRB Secretary w/o enclosure Mrs. Collette Limier, REP Manager (SEMA) w/o enclosure STARS Regulatory Affairs w/o enclosure Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP) w/o enclosure Mr. Steve Feeler (DNR) wlo enclosure Mr. Dru Buntin (DNR) w/o enclosure