IR 05000336/2018501
| ML18108A030 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/17/2018 |
| From: | Raymond Mckinley Plant Support Branch 1 |
| To: | Stoddard D Dominion Energy |
| McKinley R | |
| References | |
| IR 2018501 | |
| Download: ML18108A030 (6) | |
Text
April 17, 2018
SUBJECT:
MILLSTONE POWER STATION - EVALUATED EMERGENCY PREPAREDNESS EXERCISE INSPECTION REPORT 05000336/2018501 AND 05000423/2018501
Dear Mr. Stoddard:
On March 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Millstone Power Station (Millstone), Units 2 and 3. The NRC inspectors discussed the results of this inspection with Mr. John Daugherty, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Raymond R. McKinley, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49
Enclosure:
Inspection Report 05000336/2018501 and 05000423/2018501
Inspection Report
Docket Numbers:
50-336 and 50-423
License Numbers:
Report Numbers:
05000336/2018501 and 05000423/2018501
Enterprise Identifier: I-2018-501-0033
Licensee:
Dominion Energy Nuclear Connecticut, Inc. (Dominion)
Facility:
Millstone Power Station (Millstone), Units 2 and 3
Location:
Route 156, Rope Ferry Road
Waterford, CT
Inspection Dates:
March 19 - 23, 2018
Inspectors:
J. Ambrosini, Senior Emergency Preparedness Inspector, Division of Reactor
Safety (DRS)
J. DeBoer, Emergency Preparedness Inspector, DRS
J. Lilliendahl, Senior Emergency Response Coordinator, DRS
P. Presby, Senior Operations Engineer, DRS
Approved By:
Raymond R. McKinley, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Dominions performance at Millstone Units 2 and 3 by conducting an evaluated emergency preparedness exercise inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. No findings or more-than-minor violations were identified.
INSPECTION SCOPE
The inspectors conducted the inspection using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. The inspectors determined the following samples were complete when the inspection procedure requirements were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
REACTOR SAFETY
71114.01 - Exercise Evaluation
The inspectors evaluated the adequacy of Dominions conduct of the exercise and its capability to assess staff performance via a formal critique process, as required by 10 CFR 50.47(b)(14).
71114.08 - Exercise Evaluation - Scenario Review
The inspectors reviewed and evaluated the proposed scenario for a biennial emergency plan exercise on February 15.
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicator submittals listed below for the period from July 2017 through December 2017.
- (1) Drill and Exercise Performance
- (2) Emergency Response Organization Drill Participation
- (3) Alert and Notification System
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On March 23, the inspectors presented the inspection results to Mr. John Daugherty, Site Vice President, and other members of the Dominion Energy staff.
DOCUMENTS REVIEWED
Section 1EP1: Exercise Evaluation
Millstone Power Station Emergency Preparedness Plan, Revision 55
Millstone Power Station Emergency Preparedness Plan Implementing Procedures
Millstone Unit 3 NRC/FEMA Evaluated Exercise MMAR18BE Scenario Package
Condition Reports
1045034
1056406
1065939
1072590
1077183
1085737
1087085
1091254
1091255
Section 1EP8: Exercise Evaluation - Scenario Review
Millstone Power Station Emergency Preparedness Plan, Revision 55
Millstone Unit 3 NRC/FEMA Evaluated Exercise MMAR18BE Scenario Package
EP-AA-400, Attachment 3, Drill/Exercise Objectives
Section 4OA1: Performance Indicator (PI) Verification
DEP PI data, July 2017 - December 2017