NUCLEAR BUSINESS UNIT EMERGENCY PLAN ENC IMPLEMENTING PROCEDURES TABLE OF CONTENTS January 31, 1997 P:U:BLIC INFQRMATIQN PRQCED:U:RES Revision EMERGENCY NEWS CENTER:
Number EPIP 801 Company Spokesperson/Response....
9 EPIP 802 Emergency News Center Manager..........................
8 EPIP 803 Lead Technical Advisor Response-ENC.....................
7 EPIP 804 Emergency News Center Communications Supv. Response....
5 EPIP 805 Emergency News Center Operations Supv. Response -
ENC.............
7 EPIP 806 Emergency News Center Evacuation/
Activation of Back-up News Center (ENC).....................
4 EPIP 807 Emergency News Center Telephone Directory........................
9 NBU-EPIP EPIP T.O.C.
ENC Pg. 1 of 1 Number Effective Pages
~
5 05/24/96 8
02/02/96 10 02/02/96 32 04/29/94 12 02/02/96 15 07/26/95 7
01/31/97 Rev. 19
NUCLEAR BUSINESS UNIT EMERGENCY PLAN ENC PROCEDURE COMPANY SPOKESPERSON RESPONSE -
- 1.
Action Level Upon declaration of an Alert or higher for Emergency News Center (ENC) staffing or activation.
- 2.
Individual(s) Who Will Implement This Procedure Company Spokesperson
- 3.
Action Statements THE COMPANY SPOKESPERSON (CS) SHALL:
NOTE The Company Spokesperson shall have overall responsibility for relations with the media.
Initials 3.1 Prior to Activation of Facility:
3.1.1 cs 3.1.2 cs 3.1.3 cs 3.1.4 cs 3.1.5 cs NBU-EPIP Establish and maintain a chronological log of key events/actions.
Inform Emergency Response Manager (ERM) and Public Information Liaison (PIL) of arrival at Emergency Operations Facility (EOF) or Emergency News Center.
Get briefing of the event from the ERM and/or the Site Support Manager (SSM).
If not at ENC, Contact Emergency News Center (ENC)
Manager (NETS X5300) about status of ENC activation.
Prior to activation of the ENC, report to the Salem Community Center and assume Company Spokesperson duties.
Rev. 9
L Initials EPIP 801 Pg. 2 of 5 3.2 Post Activation of Facility:
3.2.1 cs 3.2.2 cs 3.2.3 cs 3.2.4 cs 3.2.5 cs Conduct at least one media briefing an hour following briefing guidelines in Attachment 1.
Approve and initial all press releases before they are issued.
If you are not available, instruct ENC Manager to approve press releases.
Update Emergency Response Manager (ERM) at the EOF and PSE&G Chief Executive Officer (CEO) in Newark on the status of media briefings and ENC operations (see EPIP 807 for phone numbers).
Periodically brief ENC staff on plant status.
Discuss with ENC Manager the need for continued operation of the ENC.
3.3 Event Termination/Closeout:
3.3.1 cs 3.3.2 cs Ensure restoration of facility to its original state.
Forward all completed EPIPs/Forms/Attachments to the Communications Department.
- 4.
Nuclear Business Unit Emergency Plan
- 5.
Attachments
- 1.
Company Spokesperson Briefing Checklist
- 6.
Signature Page NBU-EPIP Rev. 9
ATTACHMENT 1 COMPANY SPOKESPERSON BRIEFING GUIDELINES EPIP 801 Pg. 3 of 5
- 1.
Media briefings should be held at least once an hour and within 15 minutes of an event classification or other major event at the plant.
- 2.
Company Spokesperson should meet with ENC Manager, ENC Communications Supervisor, Lead Technical Advisor, Technical Advisors and Communications Supervisor to prepare responses to anticipated press questions, including an outline of normal plant operations and the current variance from the norm.
- 3.
The State and Federal Public Information Officers and the Health Physics (HP) Spokesperson should be briefed about the latest plant information before it is announced to the media.
- 4.
Visual aids needed for briefings should be identified and available before briefings begin.
The ENC A/V Support Coordinator should be consulted about the aesthetics of the visuals to use for each briefing.
Technical Advisors should be consulted for technical accuracy of the visuals for each briefing.
- 5.
Each briefing should begin with an introduction of the Company Spokesperson by the ENC Manager.
The ENC Manager should outline the following briefing rules before reading the latest information:
- a.
The Company Spokesperson shall lead off by reading the latest news bulletins and shall follow with a brief description of normal plant operation and the current variance from the norm.
- b.
Following the prepared statement the Company Spokesperson shall open the floor for questions for a specified amount of time.
Each reporter should identify him/herself and his/her**
news organization before asking any questions and is limited to one follow-up questions.
- 6.
Each briefing should end with an announced time for the next briefing and the following information:
NBU-EPIP Rev. 9
ATTACHMENT 1 (cont)
EPIP 801 Pg. 4 of 5
- a.
After each briefing, a Technical Advisor and the HP Spokes-person should be on the briefing floor to answer any general questions the media might have.
The Technical Advisors and the HP Spokesperson are NOT available for ONE-ON-ONE inter-views.
But they can give information on the plant, photos, video clips, and graphics of the affected unit.
The HP Spokesperson is also available for general questions about the health effects of radiation.
- 7.
In the event of a severe accident, when Protective Actions (PA's) are made by the State(s), the briefing should lead off with a very brief synopsis (1 minute) of plant information.
Then the podium should be turned over to the Spokesperson(s) from the State(s) so they can brief the media on the PA's.
- 8.
Questions that can't be answered by the Company Spokesperson should be noted by the Media Technical Advisor assigned that responsibility by the ENC Manager and should be answered before the next question and answer period.
- 9.
Each briefing should be video taped for company records.
- 10.
When onsite workers are injured during an emergency, do not release their name(s) until their families have been notified.
If injured personnel have been taken to a local hospital, you may name the facility.
- 11.
When a radiation release occurs at the affected unit, give projected doses in millirem or rem units and equate the levels to radiation information statistics quoted in the press kits.
The HP Spokesperson may provide more information on the health effects of radiation.
- 12.
Never speculate on consequences of the accident; just give the facts of the accident.
DO NOT compare this accident to Three Mile Island or to Chernobyl.
- 13.
If misleading information is picked up by the Media Monitor, Rumor Control Coordinator, or Media Information Line Operators, correct the information during the next briefing if possible.
If the misleading information is being reported by several media outlets, call a special briefing to correct it.
NBU-EPIP Rev. 9
SIGNATURE PAGE Prepared By: ~
o /;
~
t?c/ra_.1.-. k
!?... e v. "
(If Editorial Revisions Only, Last Approved Revision)
Reviewed By:
Reviewed By:
Reviewed By:
Reviewed By:
Director-N/,4 Radiological Safety QA/Nu6lear Safety Review (If Applicable)
SORC Review and Station.Approvals EPIP 801 Pq. S of S Date Date r--25~
Date Date NIA Hope'Creek Chairman Mtg. No.
Mtg. No.
Date Date NL-4 General Manager -
Hope Creek Date Date Effective Date of this Revision NBU-EPIP Rev. 9
- 1.
EPIP 802 Pg. 1 of 8 u=~-~---C -~.*=~*.:-=_.~~-~.=*----*-~--
NUCLEAR BUSINESS UNIT EMERGENCY PLANi cn~,ffi~'f';i l':':*-; :'
_]_/_
EMERGENCY NEWS :::E::::ER (ENCM) -l'/~Cu 1
' "~? ~f /.1 EPIP 802 L_
7~*-*-...
- Action Level Upon declaration of an Alert or higher for Emergency News Center (ENC) staffing, activation, or evacuation to back-up ENC.
- 2.
Individual(s) Who Will Implement This Procedure Emergency News Center Manager
- 3.
Action Statements THE EMERGENCY NEWS CENTER MANAGER (ENCM) SHALL:
NOTE The ENC Manager shall have overall managerial responsibility for operation of the ENC.
Initials 3.1 Prior to Activation of Facility:
3.1.1 ENCM 3.1. 2 ENCM 3.1. 3 ENCM 3.1.4 ENCM NBU-EPIP Establish and maintain a chronolog~cal log of key events/actions.
If necessary, implement EPIP 204S/EPIP 204H (Salem or Hope Creek Emergency Response Callout) upon notification of activation.
Contact Corporate Communications person on call and brief on status of emergency (see EPIP 807 for phone numbers).
Corporate Communications person shall institute its emergency callout to the appropriate company officials.
Call Corporate Investor Relations in Newark to brief them on status of emergency.
Rev. 8
- Initials ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM NBU-EPIP 3.1.5 EPIP 802 Pg. 2 of 8 Call Health Physics (HP) Spokesperson and request them to report to the ENC to provide information on the health effects of radiation.
3.1.6 Report to the ENC in the Salem Community Center.
3.1.7 Direct Lead Technical Advisor to implement EPIP 803.
3.1.8 Direct ENC Communications Supervisor to implement EPIP 804.
3.1.9 Direct ENC Operations Supervisor to implement EPIP 805.
3.1.10 Review all prior media communication and brief staff.
3.1.11 Assist ENC Operations Supervis0r with setup of the ENC.
3.1.12 Instruct ENC Operations Supervisor to assign a clerical staff member to the Company Spokesperson upon his arrival to keep a chronological log of activities/events and provide support services.
3.1.13 Meet with ENC lead supervisors and ensure ENC staff is prepared to assume emergency response functions.
ENC Operations Supervisor ENC Communications Supervisor Lead Technical Advisor 3.1.14 Contact the Company Spokesperson and the ERM at the EOF and give them an estimate when the ENC will be activated.
3.1.15 Brief ENC staff on status of event and time of ENC activation.
3.1.16 Approve news bulletins after consultation with Nuclear Communications Department.
Rev. 8
Initials EPIP 802 Pg. 3 of 8 3.2 Post Activation of Facility:
ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM NBU-EPIP 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 Inform the ERM/EDO/SNSS of the time of ENC activation.
Set up media briefing timetable with Company Spokesperson; Federal, State and County Public Information Officers; and HP Spokesperson.
Keep media informed of press briefings schedule.
Conduct at least one briefing an hour following briefing guidelines in Attachment 1.
Help prepare Company Spokesperson for press briefings.
Approve news bulletins when so directed by the Company Spokesperson.
Ensure that a Media Technical Advisor is always available to the press.
Act as liaison among Company Spokesperson, ENC Communications Supervisor and ENC Operations Supervisor.
3.2.9 Act as primary liaison with government agencies and the media.
3.2.10 Visit media room periodically to ascertain reporters' level of satisfaction with flow of information.
3.2.11 Confer periodically with Media Technical Advisor working Help Desk to ascertain reporters' level of satisfaction with technical information being supplied.
3.2.12 Supervise and direct activities of the ENC Communications Supervisor and ENC Operations Supervisor.
Rev. 8
EPIP 802 Pg. 4 of 8 Initials ENCM ENCM ENCM ENCM ENCM ENCM ENCM ENCM 3.2.13 Arrange ONE-ON-ONE interviews for the Company Spokesperson, if feasible.
3.2.14 Keep ENC staff informed of briefing content and status of event.
3.2.15 Check media visitor list at front desk to determine extent of media interest.
3.2.16 Confer with ENC Communications Supervisor to assess need for special media attention, such as media tours of affected unit.
3.2.17 Determine need for continued operation of ENC.
3.3 Evacuation of ENC/Activation of Back-up Emergency News Center:
3.3.1 The ENC Manager shall brief the following staff members using EPIP 806 for evacuation of the ENC and activation of the Backup ENC.
Company Spokesperson Public Information Liaison ENC Operations Supervisor ENC Communications Supervisor Lead Technical Advisor 3.4 Shift Change:
3.4.1 3.4.2 Coordinate shift relief callout with the Administrative Support Manager in the EOF.
When a shift change is required, the ENC Manager shall hold a meeting with both the outgoing and the incoming ENC Communications Supervisor and ENC Operations Supervisor.
Each outgoing Supervisor will meet with his/her shift replacement and review the significant events of the emergency as recorded in the log books.
NBU-EPIP Rev. 8
Initials ENCM 3.4.3 EPIP 802 Pg. 5 of 8 Each outgoing staff member should return ENC badges to the file and sign out at the badging area, leaving a telephone number or pager number where he/she can be reached during the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.5 Event Termination/Closeout:
3.5.1 ENCM 3.5.2 ENCM 3.5.3 ENCM 4.
References Assist with restoration of facility to its original state.
Re-arm electronic security system before leaving the building.
Forward all completed EPIPs/Forms/Attachments to the Communication Department.
Nuclear Business Unit Emergency Plan
- 5.
Attachments
- 1.
Guidelines for Media Briefings
- 6.
Signature Page NBU-EPIP Rev. 8
ATTACHMENT 1 GUIDELINES FOR MEDIA BRIEFINGS EPIP 802 Pg. 6 of 8
- 1.
Media briefings should be held at least once an hour and within 15 minutes of an event classification or other major event at the plant.
- 2.
Company Spokesperson should meet with ENC Manager, ENC Communications Supervisor, Lead Technical Advisor, Technical Advisors and Staff Writers to prepare response to anticipated press questions, including an outline of normal plant *operation and the current variance from the norm.
- 3.
The State and Federal Public Information Officers and the Health Physics (HP) Spokesperson should be briefed about the latest plant information before it is announced to the media.
- 4.
Visual aids needed for briefings should be in place before briefings begin.
The ENC A/V Support Coordinator should be consulted about the aesthetics of the visuals to use for each briefing.
Technical Advisors should be consulted for technical accuracy of visuals before each briefing.
- 5.
Each briefing should begin with an introduction of all the Spokes-person(s) by the ENC Manager.
The ENC Manager should outline the following briefing rules before reading the latest information:
- a.
The Company Spokesperson shall lead off by reading the latest news bulletin and shall follow with a brief description of normal plant operation and the current variance from the norm.
- b.
Following the prepared statement the Company Spokesperson shall open the floor for questions for a specified amount of time.
Each reporter should identify him/herself and his/her news organization before asking any questions and is limited to one follow-up questions.
- 6.
Each briefing should end with an announced time for the next briefing and the following information:
NBU-EPIP Rev. 8
ATTACHMENT 1 (cont)
EPIP 802 Pg. 7 of 8
- a.
After each briefing, Technical Advisors and the HP Spokesperson should be on the Briefing Room floor to answer any general questions the media might have.
The Technical Advisors are NOT available for ONE-ON-ONE interviews, but they can give information on the plant, photos, video clips, and graphics of the affected unit.
The HP Spokesperson is also available for general questions about the health effects of radiation.
- 7.
In the event of a severe accident, when Protective Actions (PA's) are made by the State(s), briefings should lead off with a very brief synopsis (1 minute) of plant information.
Then the podium should be turned over to the Spokesperson(s) from the State(s) so they can brief the media on their PA's.
- 8.
Questions that can't be answered by the Spokesperson(s) should be noted by the Media Technical Advisor assigned that responsibility by the ENC Manager and should be answered before the next question and answer period.
9.
Each briefing should be video taped for company records.
- 10. When onsite workers are injured during an emergency, do not release their names until their families have been notified.
if injured personnel have been taken to a local hospital, you may tell the press the name of the hospital.
- 11. When a radiation release occurs at the affected unit, give projected doses in millirem or rem units and equate the levels to radiation information statistics quoted in the press kits.
The HP Spokesperson may provide more information on the health effects of radiation.
- 12. Never speculate on consequences of the accident:
just give the facts of the accident.
DO NOT compare this accident to Three Mile Island or to Chernobyl.
- 13. If misleading information is picked up by the Media Monitor, correct the information during the next briefing if possible.
If the misleading information is being reported by several media outlets, call a special briefing to correct it.
NBU-EPIP Rev. 8
S:IGHA'l'URB PAGB EP:IP 802 Pq. 8 of 8 Prepared By:
~.
~\\
.. H~>Qn.J
~"°'"°".La
,(;q/<:Ji4 (If Editorial Revisions Only, Last Approved Revision) ~
Reviewed By:
Station Qualil/kd Reviewer Date Reviewed By:
Departm~ Manager Date Reviewed By:
Manager -
R~iol6ical Safety.
Reviewed By:
Director -
QAWu11ear Safety Review Date (If Applicable)
SORC Review and Station Approvals
,JJ/11.
~
Mtg. No.
lSalem Chairman Mtg. No.
ope Creek Chairman Date Date General Maltl:er -
Salem General µfA.
Mef nager -
Hope Creek Date Date Effective Date of this Revision:
NBU-EPIP Rev. 8
EPIP 803 Pg. 1 of 10 r;*-- ---'-...: - :....-:.-::._~-~==----..-.=~=--"'*-:;::-.,;:-;-_.:;__.. -
N NUCLEAR BUSINESS UNIT EMERGENCY PLANI u1 ENC PROCEDURE
~
LEAD TECHNICAL ADVISOR RESPONSE -
ENC~
,--,.--*c;-**-~1 I
Uu' J.
J*
f..t~ ;.,. i *i "*""'*I #
I
- i i '.J,_ 'uV j i
os-EPIP 803 L~... L t I.
- --:::::::+:v::a~w::**-~*11 --px:r""".....,..:coe ~~
- 1.
Action Level Upon declaration of an Alert or higher for Emergency News Center (ENC) staffing or activation.
- 2.
Individual(s) Who Will Implement This Procedure Lead Technical Advisor/Media Technical Advisor/Communications Technical Advisor/Health Physics Spokesperson
- 3.
Action Statements LTA LTA LTA LTA LTA LTA THE LEAD TECHNICAL ADVISOR (LTA) SHALL:
NOTE The Lead Technical Advisor shall work under the direction of the Company Spokesperson.
3.1 Prior to Activation of Facility:
3.1.1 3.1. 2 3.1. 3 3.1. 4 3.1. 5 3.1.6 Inform ENC Manager of arrival.
Initiate and maintain a chronological log of key events/actions.
Direct Media Technical Advisor to implement Attachment 1 of this procedure.
Direct Communications Technical Advl.sors to implement of this procedure.
Review all available information about the emergency with the Communications Technical Advisors and the Media Technical Advisor.
Direct the Communications Technical Advisors to contact Public Information Liaison at the EOF to establish communication.
NBU-EPIP Rev. 7 I
Initials 3.1.7 LTA 3.1.8 LTA 3.1.9 LTA EPIP 803 Pg. 2 of 10 Direct the Communications Technical Advisors to gather information about the event from the Emergency Duty Officer (TSC), or Site Support Manager (EOF) as requested by the Company Spokesperson before his arrival at the ENC.
Give technical briefings to any other essential ENC personnel as directed by Company Spokesperson/ENC Manager.
Review all prior media releases for accurate tech-nical content.
If any inaccuracies exist, have a correction issued.
3.2 Post Activation of Facility:
3.2.1 LTA 3.2.2 LTA 3.2.3 LTA 3.2.4 LTA 3.2.5 LTA NBU-EPIP Assign one Communications Technical Advisor to maintain contact with the Public Information Liaison (PIL) or Site Support Manager/Staff at the EOF.
Items of particular interest to the ENC and media include:
- a.
All details of event escalation
- b.
Site evacuation/accountability
- c.
Status of major plant equipment and safety systems
- d.
Onsite actions emergency worker teams are taking to mitigate the accident
- e.
Normal and abnormal radiation releases/levels/
plume
- f.
Personnel related activities (e.g.- injuries)
Assign a Media Technical Advisor to the Help Desk on the press briefing floor.
Assign a Second Communications Technical Advisor to assist the Company Spokesperson on the floor during all press briefings.
Monitor Emergency Response Manager Meetings at the EOF via speaker phone.
Keep notes in log book.
Keep Company Spokesperson, Communications Technical Advisors and Communications Supervisor informed of event.
Assist Company Spokesperson in preparing for briefings.
Rev. 7
Initials 3.3 Event Termination/Closeout:
EPIP 803 Pg. 3 of 10 3.3.1 LTA Assist in restoration of facility to its original state.
3.3.2 LTA Forward all completed EPIPs/forms/Attachments to the Communications Department.
- 4.
References Nuclear Business Unit Emergency Plan
- 5.
Attachments
- 1.
Media Technical Advisor Checklist
- 2.
Communications Technical Advisors Checklist
- 3.
Health Physics Spokesperson Checklist
- 6.
Signature Page NBU-EPIP Rev. 7
ATTACHMENT 1 MEDIA TECHNICAL ADVISOR (MTA) CHECKLIST NOTE EPIP 803 Pg. 4 of 10 The Media Technical Advisor shall work under the direction of the Lead Technical Advisor.
Initials Prior to activation of facility:
- 1.
Inform Lead Technical Advisor of arrival.
MTA
- 2.
Assist in set-up of the ENC per direction of the ENC MTA Operations Supervisor.
- 3.
Set up Help Desk so information for media is readily MTA available.
MTA
- 4.
Check file cabinets to insure adequate supplies of photos, press kits, video tapes and graphics of plants.
Let ENC Operations Supervisor know when supplies are low so additional materials can be produced.
- 5.
Check availability of show and tell" materials such as MTA fuel bundles, fuel pellets, pipes, etc..
- 6.
After set-up, report to the Lead Technical Advisor MTA and initiate/maintain a chronological log of key events/activities.
- 7.
Check visuals to insure they are easily accessible MTA for use during press briefings.
Post activation of facility:
- 1.
Staff Help Desk on press briefing floor.
If you MTA have to leave the desk for any reason, find a qualified substitute to cover it for you.
- 2.
Provide press kits, photos, videotapes and graphics MTA
~f the plants upon request by the media.
NBU-EPIP Rev. 7
/,;
Initials ATTACHMENT 1 (cont)
EPIP 803 Pg. 5 of 10
- 3.
Use "show and tell" materials, if available, to explain MTA plant operations.
- 4.
Respond to media inquiries about the accident with the MTA following precautions:
- a.
Answer general media questions about the status of the plant/accident.
If asked, explain how the systems that are affected by the accident normally function.
DO NOT speculate about what might happen.
DO NOT compare this event to Three Mile Island or to Chernobyl.
- b.
DO NOT provide ONE-ON-ONE on camera or radio inter-views.
If a request is made for an interview, let the ENC Manager know so he/she can schedule it with the Company Spokesperson when time*allows.
- c.
DO NOT talk about Protective Action Recommendations (PARs) made to the State(s) by PSE&G.
- d.
Follow the guidelines for Media Briefings in EPIP 802,.
- 5.
Go to each press briefing to answer general questions MTA from press after the briefing.
- 6.
Monitor all media briefings for unanswered questions.
MTA Prepare answers for next briefing session.
- 7.
Update event classification definitions after they have MTA been announced to the media.
Event Termination/Closeout:
- 1.
Assist with restoration of facility to its original MTA state.
- 2.
Forward a11-completed EPIP's/Forms/Attachments MTA to the Communications Department.
NBU-EPIP Rev. 7
ATTACHMENT 2 EPIP 803 Pg. 6 of 10 COMMUNICATIONS TECHNICAL ADVISORS (CTA) CHECKLIST NOTE The Communications Technical Advisors shall work under the direction of the Lead Technical Advisor and the Communications Supervisor.
Initials CTA1/CTA2 CTA1/CTA2 CTA1/CTA2 CTA1/CTA2 CTA1/CTA2 Prior to Activation of Facility:
- 1.
- 2.
3.
- 4.
- 5.
Inform Lead Technical Advisor and Communications Super-visor of arrival.
Initiate and maintain a chronological log of key events/
actions.
Contact Public Information Liaison (PIL) at the EOF to establish communication.
Gather information about the event from the PIL as requested by the Communications Supervisor.
Give technical briefings to communications personnel at the ENC as directed by the Communications Supervisor.
Post Activation of Facility:
- 1.
One Communications Technical Advisor should maintain CTA1/CTA2 contact with the PIL or the Site Support Manager (SSM)/Staff to track the status of the event.
Items of particular interest to the ENC and media include:
NBU-EPIP
- a.
All details of event escalation
- b.
Site evacuation/accountability
- c.
Status of major plant equipment and safety systems
- d.
On-site actions emergency worker teams are taking to mitigate the accident
- e.
Normal and abnormal radiation releases/levels/plume
- f.
Personnel related activities (e.g., injuries)
Rev. 7
Initials ATTACHMENT 2 {cont)
EPIP 803 Pg. 7 of 10
- 2.
The second Communications Technical Advisor should assist CTA1/CTA2 the Company Spokesperson (on the floor) during all press briefings.
- 3.
Keep Communications Supervisor and Staff Writers informed CTA1/CTA2 of event.
Assist Staff Writers in preparing news bulletins.
- 4.
Maintain contact with EOF through PIL or SSM Staff while
[
CTA1/CTA2 Company Spokesperson conducts press briefings.
If the accident should escalate during the briefing, get a message via an administrative support person to the ENC Manager.
- 5.
Place all plant status reports in a binder on the desk of CTA1/CTA2 the Lead Technical Advisor.
Ensure Industry Co-owner Coordinator has a copy of all plant status reports for reference.
Event Termination/Closeout:
- 1.
Assist in restoration of facility to its original state.
CTA1/CTA2
- 2.
Forward all completed EPIPs/Forms/Attachments to the CTA1/CTA2 Communications Department.
NBU-EPIP Rev. 7
- J ATTACHMENT 3 EPIP 803 Pg. 8 of 10 HEALTH PHYSICS (HP) SPOKESPERSON CHECKLIST NOTE The Health Physics (HP) Spokesperson shall work under the direction of the ENC Manager/ Lead Technical Advisor.
Initials Prior to Activation of Facility:
- 1.
Inform ENC Manager of arrival.
- 2.
Initiate and maintain a chronological log of key events/
HP actions.
- 3.
Get briefing from ENC Manager or Company Spokesperson on status of incident.
Post Activation of Facility:
- 1.
Go to pre-press briefing meetings with Company Spokesperson and state agency representatives to get updates on plant status and state's protective actions.
- 2.
Attend press briefings.
The Company Spokesperson shall determine when the HP Spokesperson should participate in the press briefings.
- 3.
The HP Spokesperson will address only the health effects of radiation following these guidelines (for additional help, ask the Lead Technical Advisor for a copy of EPIP 802 Attachment 1).
- a.
Compare dose rates to everyday items (Example: A chest x-ray provides a dose of 5-20 millirem).
- b.
Discuss health effects of radiation when asked.
- c.
DO NOT speculate on any aspect of the incident or the way PSE&G or the states are handling it.
- d.
DO NOT comment on the states' protective actions: Only the states can discuss the protective actions for the general public.
Rev. 7
Initials HP HP HP NBU-EPIP ATTACHMENT 3 (cont)
EPIP 803 Pg. 9 of 10
- 4.
After the press briefings have concluded, stay at the help desk with the Communications Technical Advisors to answer any radiological health effects questions.
Follow the same guidelines as above.
Event Termination/Closeout:
- 1.
Assist with restoration of facility to its original state.
- 2.
Forward all completed EPIPs/Forms/Attachments to the Communications Department.
Rev. 7
EPIP 803 Pg. 10 of 10 SIGNATURE PAGE Prepared By:
~
31..1Q..1,o,-r-J
~". S:
(If Editorial Revisions Only, Last Approved Revision)
Reviewed By:
Station Qualified Reviewer Date Reviewed By:
Department~1uager Date Reviewed By:
Safety 1/;9faC
' Date Reviewed By:
Qualit~1ssurance/Safety Review Date Director -
(If Applicable)
SORC Review and Station Approvals Mtg. No.
~ Salem Chairman Mtg. No.
~e Creek Chairman Date Date General Man~1 - Hope Creek Date Date
- Effective date of this Revision:
r r NBU-EPIP Rev. 7
SIGNATURE PAGE Prepared By:
_c~**--f.:__:_~~-"'--'-....,.,..~'_.....,..J.l:...':.V\\.~/\\A-"-.1.>-=-~~(--L:.~e~v"--'--'*-~~~:.____~~~~~~
(If Editori Revisions Only, Last Approved Revision)
Reviewed By:
Reviewed By:
Reviewed By:
Reviewed By:
1v Station Qualified Reviewer Manager Director -
QA & Nuclear Safety Review (If Applicable)
SORC Review and station Approvals EPIP 803 Pg. 2 of 2
~ -J..7-q7 Date Date Date 3--J..74 J Date Date Mtg. No.
Mtg. No.
Hope Creek
,0 Date
-~
r General Man er -
Salem Hope Creek Date Date Effective date of this Revision: ; -*~l ~ '-l J Date NBU-EPIP Rev. 8
ARTIFICIAL ISLAND EMERGENCY PLAN ENC PROCEDURE EPIP 804 Pg. 1 of 33 EMERGENCY NEWS CENTER COMMUNICATIONS SUPERVISOR RESPONSE EPIP 804
- 1.
Action Level Upon declaration of an Alert or higher for Emergency News Center (ENC) staffing or Activation.
- 2.
Individual Cs) Who Will Implement This Procedure Emergency News Center communications Supervisor/Industry Coordinator/Government Affairs Coordinator/Rumor Control Coordinator/Southern Inquiry Supervisor/Southern Inquiry Center Operators/Northern Inquiry Center Supervisor/Staff Writers/Media Information Supervisor/Media Information Line Operators/ Northern Inquiry Center Operators
- 3.
Action Statement THE EMERGENCY NEWS CENTER COMMUNICATIONS SUPERVISOR (ENCCS) S!{ALL:
NOTE The Emergency News Center Communications Supervisor shall work under the direction of the ENC Manager.
Initials 3.1 Prior to Activation of Facility:
3.1.1 ENNCS 3.1. 2 ENCCS 3.1. 3 ENC CS 3.1. 4 ENCCS 3.1.5 ENCCS AIEPIP Inform ENC Manager of arrival.
Initiate and maintain a chronological log of key activities and events.
Direct Industry Coordinator to implement Attachment 1 of this procedure.
Direct Government Affairs Coordinator to implement of this procedure.
Direct Rumor Control Coordinator to implement Attachmen.t 3 of this procedure.
Rev. 5
ENC CS ENC CS ENC CS ENCCS ENC CS
- AIEPIP 3.1. 6 3.1. 7 3.1. 8 3.1.9
- EPIP 804 Pg. 2 of 33 Direct Media Monitors to implement Attachment 6 of this procedure.
Direct Staff Writers to implement Attachment 7 of this procedure.
Direct Media Information Line Supervisor to implement of this procedure.
Establish and equip work area.
3.1.10 Meet with and ensure ENC Communications Supervisor/
staff are prepared to assume Emergency Response functions.
~~Industry Coordinator Government Affairs Coordinator Rumor Control Coordinator Media Monitors Staff Writers Media Information Line Supervisor 3.1.11 Verify telecopier communication between ENC and Corp-orate Communications Department, Southern Inquiry center, and Public Information Liaison at the EOF.
3.1.12 Assist ENC Operations Supervisor in set-up of ENC workrooms.
3.1.13 Inform ENC Manager when ready to assume Emergency Response functions
- NOTE If News Bulletins are issued before the ENC is activated, the Nuclear Information Department approves them and copies shall be provided to the ENC staff.
The Emergency Coordinator, whether the Senior Nuclear Shift supervisor or the Emergency Duty Officer, SHALL be notified that a News Bulletin is being issued.
Rev. 5
Initials EP:IP 804 i?g. 3 of 33 3.2 Post Activation of Facility:
3.2.l ENC CS 3.2.2 ENC CS 3.2.3 ENC CS 3.2.4 ENCCS 3.2.5 ENC CS 3.2.6 ENCCS ENCCS 3.2.7 3.2.8 ENC CS 3.2.9 ENCCS
- AIEPIP Maintain contact with Public Information Liaison at the EOF through the Communications Technical Advisor to ensure receipt of timely plant status updates.
Direct Staff Writers in preparing news bulletins, determining content, and overseeing writing.
Ensure Lead Technical Advisor reviews all news bull-etins for technical accuracy.
Ensure that all news bulletins are reviewed and approved by the Company Spokesperson or the ENC Manager and signed.
Provide approved news bulletin to appropriate company officials and to ENC Operations supervisor for distribution to ENC staff, Federal, State, and County
--Agencies, and the Media.
Ensure that approved press bulletins are faxed to SNSS/EDO/ERM and Corporate Communications.
Direct Industry Coordinator to FAX approved plant status/press bulletins to:
- a. "PECO Public Information
- b.
Atlantic Electric Public Information
- c.
Delmarva Power Public Information
- d.
- e.
INPO Supe~vise preparation of supplemental media inf or-mation at the request of the Company Spokesperson/ENC Ma_nager.
Discuss with the ENC Manager the need for continued operation of the ENC.
Rev. 5
1 Initials 3.3 Event Termination/Closeout:
EPJ:P 804 Pq. *4 of 33 3.3.1 Assist with restoration of facility to its original ENC CS state.
ENC CS 3.3.2 Forward all completed EPIPs/Forms/Attachments to the Manager communications Nuclear.
- 4.
References Artificial Island Emergency Plan 5.
Attachments
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
AIEPIP Industry Coordinator Checklist Government Affairs Coordinator Checklist Rumor control Coordinator Checklist Southern Inquiry Center Supervisor Checklist Southern Inquiry Center Operator Checklist Media Monitors Checklist Staff Writers Checklist Media Information Advisor Checklist Media Information Line Operators Checklist Rumor Control Concern Form Rev. 5
Initials IC EP:IP 804 Pg.* 5 of 33 _
ATTACHMENT 1 INDUSTRY COORDINATOR (IC) CHECKLIST NOTE The Industry Coordinator.shall work under the direction of the ENC Communications Supervisor.
Prior to Activation of Facility:
- 1.
Notify the ENC Communications Supervisor of your arrival.
- 2.
Initiate and maintain a chronological log of key act-IC ivities/events.
- 3.
Check any equipment that you use, including computers and telephones to make sure they are working.
Report.any problems to the ENC Operations Supervisor.
Post Activation of Facility:
- 1.
Call the Institute of Nuclear Power Operations (INPO) Duty IC Officer and inform him/her that an emergency is in progress at Salem or Hope Creek Generating station and that approved plant status updates will be transmitted from the Emergency News Center (see EPIP 807 for phone numbers).
Provide the INPO Duty Officer with a callback phone number.
- 2.
Contact the United states Council for Energy Awareness IC (USCEA) Public Information Officer on duty and advise him/her that an emergency has been declared and you will be transmitting news bulletins to them for the AIF INFOPHONE via the FAX machine.
Confirm FAX number.
AIEPIP Rev. 5
Initials ATTACHMENT 1 (cont)
EPJ:P 804 Pg. 6 of.33
- 3.
Establish Contacts and FAX copies of approved News IC Bulletins to Philadelphia Electric Company (PECO),
Delmarva Power and Atlantic Electric Public Information Departments as directed by the ENC Communications Supervisor (see EPIP 807 for phone and fax numbers).
- 4.
Keep ENC Communications Supervisor informed of industry IC contact and direction of inquiries about the event.
- 5.
Discuss with the ENC Communications Supervisor the need IC for continued operation of the industry communication function and/or need for special supplemental industry information materials such as video tapes, brochures, etc.
Event Termination/Closeout:
- 1.
Assist with restoration of facility to its original state.
- 2.
Forward all completed EPIPs/Forms/Attachments to the IC Manager Communications Nuclear.
AIEPIP Rev.. 5
L. __
Initials GAC ATTACHMENT 2 EPIP 804 Pg. 7 Of 33 GOVERNMENT AFFAIRS COORDINATOR (GAC) CHECKLIST NOTE The Government Relations Coordinator shall work under the direction of the Communications Supervisor.
Prior to activation of facility:
- 1.
Inform ENC Communications Manager of arrival.
- 2.
Initiate and maintain a chronological log of key GAC activities/events.
GAC GAC
- 3.
Establish and equip work area.
- 4.
Contact General Manager -
Federal Affairs or his designee and provide him/her with a briefing on the emergency (see EPIP 807 for phone numbers).
Start at the top of the list, calling each number until you connect with a representative of this group.
Provide your contact with a telephone number where he/she can call you.
General Manager - Federal Affairs Newark Off ice or Washington Off ice or Manager - Federal Affairs, Washington Office or Federal Legislative Analyst, Newark Office or Legislative Staff Assistant, Newark Office
- 5.
Fax all approved press bulletins about the incident to G~C Federal Affairs in Newark and Washington, DC.
AIEPIP
-~ev. 5
Initials ATTACHMENT 2 (cont)
EPIP 804 Pg. 8 of 33
- 6.
Contact the General Manager - State Governmental Affairs GAC or his/her designee and provide him with a briefing on the emergency.
Start at the top of the list, calling each number until you connect with a repr~sentative of this group.
Provide your contact with a telephone number where he/she can call you.
General Manager - State Government Affairs, Newark Off ice or Manager - State Government Affairs, Newark Office or Manager - state Government Affairs, Trenton Office or Manager - Legislative Relations, Newark Office
- 7.
FAX all approved news bulletins about the emergency to the GAC State Governmental Affairs Off ice in Newark and to the Trenton Off ice.
GAC GAC
- 8.
Contact Lower Alloways Creek (LAC) Township's liaison to PSE&G or his designee and provide him/her with a briefing on the emergency.
start at the top of the list, dialing each number until you connect with a representative of the group.
Provide your contact with a number where he/she can call you.
Emergency Management Coordinator (EMC) or LAC Police Chief if he is not available, ask the dispatcher to page Police Chief and return your call. Leave your telephone number with the dispatcher.
- 9.
FAX approved news bulletins to LAC Township.
Post Activation of Facility:
.1.
Maintain contact with Federal Affairs, State Governmental GAC Affairs and LAC Township.
Provide them with information as it becomes available.
AIEPIP Rev. 5
Initials ATTACHMENT 2 (cont)
EPIP 804 Pg. 9 of.33
- 2.
Attend all ENC staff briefings to stay up-to-date on the GAC status of the emergency.
- 3.
Monitor all press briefings via the TV monitor in the work GAC areas.
- 4.
Keep ENC Communications Supervisor informed of political GAC reaction as reported to you by Federal Affairs and State Governmental Affairs.
GAC GAC AIEPIP Event Termination/Closeout:
- 1.
Assist in restoration of facility to its original state.
- 2.
Complete log and forward all completed EPIPs/Forms/
Attachments to the Manager Communication Nuclear.
Rev. 5
Initials
- AIEPIP EPIP 804 Pg. 10 of 33 ATTACHMENT 3 RUMOR CONTROL COORDINATOR (RCC) CHECKLIST NOTE The Rumor Control Coordinator shall work under the direction of the ENC communications supervisor.
Prior to Activation of Facility:
- 1.
Upon notification, update the Muskrat Information Line either from an internal or external telephone.
To update the Muskrat Information Line, follow the posted instructions that are located in the Rumor Control Coordinator's file or Communications Supervisor's Desk.
After you have deleted the current Muskrat Information Line Message, Press 2 to record the new message as follows:
A/An (Emergency Classification) was declared at the Nuclear Generating Station of Artificial Island at a.m./p.m. today due
~~~~~~-
PS E & G has activated emergency facilities to deal with the matter.
NOTE Only use the first section below if accountability and evacuation have occurred.
Otherwise, start with the second sentence.
Rev. 5
- AIEPIP EPIP 804 Pg. 11 of 33 ATTACHMENT 3 (cont)
All PSE&G nuclear department employees who are not involved in handling the emergency have been sent home from Artificial Island*.
All PSE&G nuclear department employees who do not have specific emergency duties should listen to one of the following radio stations for reporting instructions:
WSTW WBSS WJIC KYW
- 93. 7FM
- 97. 3FM 1510AM 1060AM Wilmington Atlantic City Salem Philadelphia You can get the latest update about plant status by calling the PSE&G Rumor Control Center at 1-800-443-7392.
This information line will be updated as information becomes available.
At the end of message, press # sign.
To listen to message you have just recorded, press 1.
If message is okay, press #,
then enter mailbox number 1463 and press # a final time for immediate delivery.
- 2.
Notify the Southern Inquiry center (Sicr to activate the Rumor Control lines (see EPIP 807 for phone numbers).
- 3.
Call SIC to inform the SIC-supervisor you are sending a message.
- 4.
FAX the _following message to SIC:
A/An was declared at the
~~~~~~~--~N~u-c---lear Generating station on Artificial Island at a.m./p.m.
~~--~~----~
today due to P SE&G has ac.,...t.... 1_v_a.... t_e_d..-e_m_e_r_g_e_n __
c_y__,,f..... a_c_1_l __ 1_t
.......... 1_e_s-....t_o __ d __ e_a_l_w_,....1.... t.... h__,...t*he problem.
This message is used only for the recorded message that SIC will play during set up of the Rumor Control operation. It is not given out to-the SIC.Operators.
The SIC Operators use the news bulletins and summaries to provide callers with information on the plant status.
The SIC Supervisor will let you know when he/she is ready to activate the Rumor Control Center.
- 5.
Report to the ENC.
Rev. 5
EPIP 804 Pg. 12 of 33 ATTACHMENT 3 (cont)
Initials
- 6.
Inform the Communications Supervisor you have arrived.
- 7.
Initiate and maintain a chronological log of key RCC activities/events.
Post Activation of Facility:
- 1.
FAX previously approved news bulletins and summaries to RCC SIC for Rumor Control.
Telephone the SIC supervisor to alert him/her each time a new message is sent.
RCC RCC RCC RCC RCC RCC AIEPIP 2.
3 *
- 4.
- 5.
Update Muskrat Information Line by recording each news bulletin released.
At the end of the emergency, record the last message stating that the line will not be updated until normal business hours.
FAX previously approved news bulletins and summaries_ for the PSE&G Energy Line to Corporate Communications Department and corporate Investor Relations.
At the direction of the Administrative Support Manager at the EOF, provide the News Director at predesignated radio stations (see below) with employee emergency reporting instructions.
NOTE Call and ask for the News Director and provide him/her with the reporting instructions.
Predesignated radio stations:
WSTW, WBSS, WJIC, KYW, WILM Event Termination/Closeout:
- 1. Assist in restoration of facility to its original state.
- 2.
Forward Manager all completed EPIPs/Forms/Attachments to the Communications Nuclear.
Rev. 5
Initials SICS SICS SICS SICS SICS SICS SICS SICS
- AIEPIP EPIP 804 Pg. 13 of 33 ATTACHMENT 4 SOUTHERN INQUIRY CENTER SUPERVISOR (SICS) CHECKLIST NOTE The Rumor Control Supervisor Bordentown shall work under the direction of the Rumor Control Coordinator.
Prior to Activation:
- 1.
Upon notification, notify alternate Southern Inquiry Center Supervisor to implement Rumor Control callout (i.e., Southern Inquiry Center (SIC} callout).
- 2.
Report to Rumor Control Center (i.e., SIC).
- 3.
Initiate and maintain a chronological log of key activities/events.
- 4.
Contact Northern Inquiry Center (NIC) in Newark and inform NIC Supervisor that all SIC Bordentown normal. service calls will be transferred to them.
- 5.
Direct NIC Supervisor to implement Appendix 1 of this Attachment.
- 6.
Inform staff that all news bulletins will be forwarded to them as soon as.the Rumor Control Center is activated.
- 7.
Contact ENC Communications Supervisor about activation status.
Post Activation o~ Facility:
-1.
Obtain from the Rumor Control Coordinator ENC a briefing on plant conditions to update SIC "BOO" rumor control number and rumor control operators.
Rev. 5
Initials SICS SICS SICS SICS SICS SICS
- AIEPIP EPIP 804 Pg. 14 of 33 ATTACHMENT 4 (cont)
- 2.
Update SIC 11 800 11 rumor control recording with the following message:
"You have reached the PSE&G Rumor Control Center.
(insert message on plant status sent to SIC - Bordentown via FAX machine).
The PSE&G Rumor Control Center will open for calls at (time).
Please call back then."
- 3.
Assign southern Inquiry Centers (SIC) Operator(s) duties (see Attachment 5 of this procedure).
- 4.
Check to make sure state's numbers are activated.
If you have a problem verifying the state's activations, ask the ENC Communications Supervisor to verify it and inform you of the status.
- 5.
When Rumor Control Center is fully staffed, switch phone system from taped message to Southern Inquiry Center Operator(s) active phones.
When calls are delayed because of busy lines, direct rumor control operators to insert the following recorded message:
NUCLEAR DELAY MESSAGE (SOUTHERN INQUIRY CENTER ONLY)
Use this recorded message when calls are delayed because of busy lines:
HELLO.
This is the PSE&G Rumor control center.
we expect to answer you call within one to two minutes.
Upon **answering, we will give you the latest update on the plant.
6.-
After your operations are activated, contact Supervisor at the Northern Inquiry Center to provide him with a status report on the incident at the nuclear_ power plant.
- 7.
FAX NIC Supervisor the press rele~ses that the ENC has sent to you so the NIC can remain informed about the incident in case their customer service representatives need to answer calls about it.
Rev. 5
Initials SICS SICS SICS SICS
- AIEPIP
[ __
EPIP 804 Pg. 15 of 33 ATTACHMENT 4 (cont)
- 8.
Keep ENC Rumor Control Coordinator advised on content and volume of calls and problems.
- 9.
Determine need for continued operation of Rumor Control Center.
Event Termination/Closeout:
- 1.
Assist in restoration of facility to its original condition.
- 2.
Forward all completed EPIPs/Forms/Attachments to the Manager communications Nuclear.
Rev. 5
Initials NICS NICS NICS NICS NICS NICS NICS NICS
- NICS NICS AIEPIP
.. EPJ:P 804 Pq. 16 of 33 APPENDJ:X 1 (TO ATTACHMENT 4)
NORTHERN J:NQUJ:RY CENTER SUPERVJ:SOR (NJ:CS) CHECKLJ:ST Prior to activation of facility:
- 1.
Upon notification from the Southern Inquiry Center (SIC) that its calls will be transferred to the Newark Office, alert the staff that an emergency has occurred at the nuclear plants and provide a briefing on the incident.
- 2.
Inform staff that the southern Inquiry Center's normal service calls will be transferred to Newark.
- 3.
Call in extra staff, if required, using normal callout procedures.
Post Activation of Facility:
- 1.
- 2.
- 3.
- 4.
Begin monitoring customer calls to determine level of interest in the incident at the nuclear plant.
When you begin receiving calls from the public about the incident at the nuclear plant, brief your staff about the incident and distribute the news bulletins you have received from the Supervisor at the.southern Inquiry Center to Customer Service Representatives so they have the appropriate information to give to the callers.
Inform NIC Operators to implement Appendix 2 of this attachment.
Keep the Supervisor at the Southern Inquiry Center advised of the content and volume of calls and problems so he/she can keep the Emergency News Center Staff informed.
- 5.
Determine the need for continued operation of the Rumor Control activities for the incident at the nuclear power plant.
Event Termi~at~on/Closeout:
- 1. Assist in restoration of facility to its original condition if necessary.
- 2.
Forward all completed EPIPs/Forms/Attachments to the Manager Conimunications Nuclear.
Rev. 5
Initials NICO NICO NICO NICO
- NICO NICO
- AIEPIP EP:IP 804 Pg. 17 of 33 APPEND:IX 2 (TO ATTACHMENT 4)
NORTHERN INQUIRY ~ENTER OPERATORS (NICO) CHECKLIST Prior to activation of facility:
- 1.
Upon notification of an event at the nuclear plant, attend the briefing your Supervisor will give on the facts of the incident.
Post Activation of Facility:
- 1.
Read the news bulletins from the Emergency News Center that your Supervisor will give you so that you are familiar with the information about the incident and are able to communicate it to customers.
- 2.
Answer the phone following your normal procedures.
- 3.
Provide the caller with the information from the News Bulletin.
You can release any information that has been included in any of the News Bulletins you have received.
DO NOT speculate about anything.
Give out only the facts that you have.
- 4.
Direct all questions about evacuation, sheltering or other protective actions to either the New Jersey or Delaware Rumor Control Hotlines (see EPIP 807 for phone numbers).
Find out where the caller lives and give them the number for the state from which they are calling.
If they are calling from a state other than New Jersey or Delaware, tell them to stay tuned to their local radio stations for details.
NOTE The Supervisor in the Southern Inquiry Center will call the New Jersey and Delaware numbers before referring inquiries to make sure.they are activated.
- 5.
If you receive any calls fro~ the press, direct them to the Emergency News Center Media Information Lines, (see EPIP 807 for p~one numbers).
Rev. 5
Initials NICO NICO NICO NICO NICO
- NICO NICO
- AIEPIP EPIP 804 Pg.*1s o~ 33 APPENDIX 2 (cont)
- 6.
If a caller has a special concern that you cannot address from the information the Emergency News Center has provided to you, tell the caller you will make a note of it and give it to your Supervisor.
DO NOT say you will get back to the caller.
- 7.
Fill out a concern form from Attachment 10 of this procedure.
Provide your Supervisor with these forms so that he can update the ENC Manager.
- 8.
If callers indicate they are hearing information that you know is incorrect based on the facts you have been given, report the false statements and where the callers are saying they are hearing them to your Supervisor.
- 9.
End all calls with "thank you for calling."
- 10. Keep Supervisors advised of any problems.
Event Termination/Closeout:
- 1. Assist in restoration of facility to its original condition.if necessary.
- 2.
Forward all completed EPIPs/Forms/Attachments to the Northern Inquiry Center Supervisor.
- _Rev. 5
EPIP 804 Pg. 19 of 33-ATTACllMENT 5 SOUTHERN INQUIRY CENTER OPERATORS (SICO) CHECKLIST NOTE The Southern Inquiry Center Operators Bordentown shall work under the direction of the Southern Inquiry Supervisor.
Initials SICO SICO SICO SICO SICO AIEPIP Prior to Activation:
- 1.
Upon notification, report to your work station (i.e.,
Bordentown Southern Inquiry Center {SIC).
- 2.
Assist the Supervisor in activating the Center.
- 3.
The Supervisor will tell the Operators when the Center is activated.
The tape recorded message will be removed from the phone system and the Operators will begin answering the telephone inquiries after reviewing the materials the Emergency News Center (ENC) has provided.
The Supervisor will receive the ENC materials and provide a copy of the message to the Operators.
Post Activation of the Facility:
- 1.
Answer phone inquiries as follows:
"This is the PSE&G Rumor Control Center.
Would you like the latest update
?"
~---..,N~a-m_e __
o-...f--,.,,P~l-a_n_t.---a-n~a~u~n-i-t..----~
- 2.
Provide the caller with the information from the ENC.
You can release any information that has been included in any of the.News Bulletins you have received.
DO-NOT speculate about anything.
Give out only the facts that you have
- Rev. 5
Initials SICO SICO SICO SICO SICO SICO SICO SICQ_
SICO
- AIEPIP EP:IP 804 Pg. 20 of 33 ATTACHMENT 5 (cont)
NOTE Have your Supervisor call the New Jersey and Delaware numbers before referring inquiries to make sure they are activated.
- 3.
Direct all questions about evacuation, sheltering or other protective actions to either the New Jersey or Delaware Rumor Control Hotlines (see EPIP 807 for phone numbers).
- 4.
Direct media calls to ENC Media Information Lines.
- 5.
If a caller has a special concern that you cannot address from the information the ENC has provided, tell the caller you will make note of it and give it to your Supervisor.
DO NOT say you will get back to the caller.
- 6.
Fill out the Concern Form from Attachment 10 of this procedure.
Periodically provide the supervisor with these forms so that he/she can update the ENC Communications Supervisor.
- 7.
If callers indicate they are hearing information that you know is incorrect based on the facts you have been given, report the false statements and where they originated to your Supervisor immediately.
- 8.
End all calls with "thank you for calling."
- 9.
Keep Supervisor advised of any problems.
Event Termination/Closeout
- 1.
Assist Supervisor in restoring center to its original state.
- 2.
Forward all completed EPIPs/Forms/Attachments to the
_ Manager Communications Nuclear.
Rev.* 5
EPIP 804 Pg.* 21 of 33 ATTACHMENT 6 MEDIA MONITOR (MM) CHECKLIST NOTE The Media Monitor shall work under the direction of the ENC Communications Supervisor.
Initials Prior to Activation of Facility:
L Inform ENC Communications Supervisor of arrival.
MM
- 2.
Assist in set-up of the ENC per direction of the ENC MM Operations Supervisor.
- 3.
Initiate and maintain a chronological log of key MM activities and events *
- 4.
Inform ENC Communications Supervisor when ready to MM assume emergency response functions.
Post Activation of Facility:
- 1.
Tune TV monitors to th.e following Philadelphia stations MM and record their broadcasts at the news hours during activation of ENC.
- a.
Channel 3 -
KYW
- b.
Channel 6 -
WPVI
- c.
Channel 10 -
WCAU
- d.
Channel 12 -
WHYY
- 2.
Scan radio stations listed below and *tape radio stations MM at the news hour during activation of ENC.
MM AIEPIP
- a.
KYW 1060 AM
- b.
NJIC 1510 AM
- c.
WSTW 9 3
- 7 FM
- d.
WILM 1450 AM
- 3.
Read news bulletins and monitor media briefings given by the company Spokesperson.
. ~ev. 5
EPIP 804 Pg. 22 of 33 ATTACHMENT 6 (cont)
Initials
- 4.
Monitor media reports for accuracy.
Alert ENC MM Communications Supervisor of any discrepancies or misleading information carried on TV or radio stations listed above using Attachment 10 of.this procedure.
- 5.
If directed to contact the station reporting the MM discrepancy, call the assignment editor at the TV stations or the news desk at the radio stations (see EPIP 807 for phone numbers).
- 6.
Alert Communications Supervisor of any equipment problems MM or needs.
MM MM AIEPIP Event Termination/Closeout:
- 1.
Assist with restoration of facility to its original state~
- 2.
Forward all completed EPIPs/Forms/Attachments to the Manager Communications Nuclear.
Rev. 5
EPIP 804 Pg. 23 of 33 ATTACHMENT 7 EMERGENCY NEWS CENTER STAFF WRITER(S)
(ENCSW) CHECKLIST NOTE The Emergency News Center staff writer shall work under the direction of the ENC communication Supervisor.
Initials Prior to Activation of Facility:
- 1.
Inform ENC Communications Supervisor of your arrival.
- 2.
Assist in set up of ENC Communications Room.
- 3.
Check all equipment to make sure it works.
Report any SW problems to the ENC Operations Supervisor.
- 4.
Inform ENC Communications Supervisor when ready to assume Emergency Response functions.
Post Activation of Facility:
- 1.
Summarize plant conditions and emergency response SW activities based on information from Communications Technical Advisor and Communications Supervisor.
- 2.
Write or review News Bulletins.
Use guidelines from SW Appendix_l of this attachment.
- 3.
Give News Bulletins to the ENC Communications Supervisor.
SW Event Termination/Closeout:
- 1. Assist with restoration of facility to its original state.
- 2.
Forward all completed EPIPs/Forms/Attachments to the SW Manager Communications Nuclear.
AIEPIP Rev. 5
Appendix 1 ( FOR ATTACHMENT 7)
NEWS BULLETIN CHECKLIST NOTE EPIP.804 Pg. 24 of 33 Do checklist for each News Bulletin and attach it to the bulletin.
Initial each item when completed.
AIEPIP Double space all News Bulletins.
At the top of each Bulletin, put the following information:
Last name of writer Date Time: (a.m./p.m. - this is the last item you type in)
News Bulletin No.
Slug the copy Bulletin or Summary of Events Use a dateline:
Lower Alloways creek, NJ Issue a straight bulletins describing the latest event or change in emergency status.
DO NOT rehash prior News Bulletins.
Use a new lead.
Use a simple language.
Avoid all industry jargon.
Capitalize Unusual Event, Alert, site Area Emergency, General Emergency.
If verified and if appropriate, the second or third paragraph should include the statement:
"There has been no release of radiation.
Appropriate federal, state, and county authorities have been notified".
-*no NOT say "No action is* required on the part of the Public. "
Only the states can make that determination.
The last statement on the News Bulletin.should read "More details will follow as they become available."
Rev. 5
EPIP 804 Pg. 25 of 33 APPENDIX 1 (cont)
Initial each item when completed.
AIEPIP Check that the bottom of each News bulletin to ensure the following is included:
NOTE TO EDITORS:
Public Service Electric
& Gas Co., owner-operators of the Salem/Hope Creek Nuclear Generating Stations, has opened an Emergency News Center at the Salem Community Center, 118 Walnut Street (Corner of Grieves Parkway) Salem, New Jersey.
A company Spokesperson will hold periodic briefings and state and county spokesperson also will be available.
Reporters also can get information by calling 609-273-0188' 0282' 0386' 04 79' 0586.
DO NOT use the phrase "non essential personnel."
Use "All Personnel on Artificial Island not involved in dealing with the emergency have been sent home.
Back-up emergency personnel have been called in."
Another key phrase to use when appropriate:
"The public is advised to stay tuned to local Emergency Broadcast System (EBS) radio station for the latest information and official instructions."
Explain each change in event classification, using the following descriptions.
NOTE DO NOT rank classifications according to severity.
For example:
DO NOT say "the third highest level of a nuclear accident.
ALERT
- Event in progress which could affect plant safety.
- Some offsite response may be needed.
- PSE&G emergency response teams activated.
- No uncontrolled release of radiation outside of the plant.
Rev. 5
I,
- AIEPIP EPIP 804 Pg. 26 of 33 APPENDIX 1 (cont)
SITE AREA EMERGENCY Level of safety has degraded or could degrade (choose appropriate word) to the point of losing a plant function needed to protect the public.
Potential for small release of radiation near the plant.
(If there has been no release of radiation, it is not necessary to make this statement.)
Does not involve a core meltdown.
All PSE&G and state emergency response centers are activated.
Protective action might be required of the public in a limited area beyond plant site.
Plant area has been evacuated except for personnel handling the emergency.
GENERAL EMERGENCY Level of safety has degraded or could degrade to a point of:
Substantial core damage with loss or possible loss of primary containment (use appropriate phrase).
Large amount of radioactive material has or could be released (use appropriate phrase).
All PSE&G and state emergency centers are activated.
Protective actions might be required out to 10 mil.es.
Names of any onsite workers injured during.an emergency will not be released until their families have been notified.
(You can name the hospital, if appropriate, where the injured workers have been taken).
Use a.m./p.m. clock time, not military time.
Rev. 5
EPIP 804 Pg. 27 of 33 APPENDIX 1 (cont)
Initial each item when completed.
AIEPIP Make NO reference to public evacuation or other Protective Actions.
The states do that.
If a radiation release occurs at the affected unit, give projected doses in millirem or rem units and equate the levels to radiation health effects statistics quoted in the press kits.
(Example:
the average chest X-ray results in an exposure of 5-20 millirems).
A Loss of Coolant Accident (LOCA) can involve either a small break or a large break in the pipes that supply water to and from the reactor.
Find out which one.
Also, DO NOT use the term LOCA.
Issue Summaries and Backgrounders periodically, as time permits.
A chronology of events should be issued at least every four hours.
DO NOT include information in the chronology that has not been released previously in a news bulletin or press briefing.
Rev. 5
1.,
.EPIP 804 Pg. 28 Of 33 ATTACHMENT 8 MEDIA INFORMATION*SUPERVISOR (MIS) CHECKLIST NOTE The Media Information Supervisor shall work under the direction of the ENC Communications Supervisor.
Initials Prior to Activation of Facility:
MIS MIS MIS MIS MIS MIS MIS MIS MIS
- 1.
Inform ENC communications Supervisor of your arrival.
- 2.
As~ist in set-up of ENC.
- 3.
Initiate and maintain a chronological log of key activities/events and media inquiries.
- 4.
Direct Media Information Line.Operators to implement of this procedure.
- 5.
Check all telephone lines to make sure they work.
Report any problems to ENC Operations Supervisor.
- 6.
Ensure that all reference material is available for each opera:tor.
- 7.
Determine what other emergency facilities are operational.
- 8.
Test FAX machine to see if it works. -.Report any problems to ENC Operations Supervisor.
- 9.
Inform ENC Communications Supervisor when ready to assume emergency response functions.
Post Activation of Facility:
- 1.
Supervise media information phone bank in the ENC MIS ensuring media inquiries are answered with the latest news bulletin "Facts on File" background information.
AIEPIP Rev. 5
1,.
EP:IP 804 Pg. 29 of 33 ATTACHMENT 8 (cont)
Initials
- 2.
Find and/or clarify information for media as requested by MIS Media Operators.
- 3.
Keep ENC communications Supervisor informed on number and MIS direction of media inquiries.
- 4.
Direct Media Operators to channel calls about New Jersey MIS or Delaware to appropriate numbers (see EPIP 807 for phone numbers).
- 5.
When PSE&G issues a News Bulletin, call the following MIS wire services, tell them you have a news bulletin about a nuclear incident at PSE&G verify FAX number and then FAX it to:
- a.
Business Wire
- b.
Media Wire
- c. Associated Press (AP)
- d.
United Press International (UPI)
Event Termination/Closeout:
- 1. Assist with restoration of facility to its original state.
MIS
- 2.
Forward all completed EPIPs/Forms/Attachments to the MIS Manager Communications Nuclear.
AIEPIP Rev. 5
- EPIP 804
- Pg. 30 of 33 -
ATTACHMENT 9 MEDIA INFORMATION OPERATORS (MIO) CHECKLIST NOTE The Media Information Operators shall report to the Media Info Supervisor.
Initials Prior to Activation of Facility:
- 1.
Inform ENC Communications Supervisor of your arrival.
MIO
- 2.
Assist in set-up of ENC.
MIO
- 3.
Initiate and maintain a chronological log of key MIO events/activities and media inquiries.
MIO
- 4.
Inform Media Information Supervisor when ready to assume Emergency Response function.
Post Activation of Facility:
- 1.
Respond to media inquiries about the event using MIO information provided on news bulletins release or "Facts on File" book.
- 2.
Invite media to ENC for press briefings.
MIO
- 3.
Refer press calls about New Jersey and Delaware to MIO appropriate numbers (see EPIP 807 for phone numbers).
- 4.
Refer general public calls on plant status to the-Rumor MIO Control Center.
- 5.
Refer general public inquiries about evacuation to New MIO Jersey Emergency Preparedness authorities.
AIEPIP Rev. 5
EPIP 804 Pq. 31 Of 33 ATTACHMENT 9 (cont)
Initials
- 6.
Give callers from the State, County, and Federal MIO (Nuclear Regulatory Commission (NRC) and the Federal Emergency Management Agency (FEMA) agencies the information you have from the News Bulletins from PSE&G and the state agencies.
If these callers request additional information, you can do any of the followin~,
depending on ~he nature of the call:
MIO
- a.
Refer the caller to the Delaware line or the New Jersey line.
- b.
Take a message for the Delaware or New Jersey Public Information Officer at the ENC and then deliver that message to the appropriate person.
- c.
If the caller wants to speak with the ERM, tell him/her you will take a message and attempt to get it to the ERM.
Then FAX the message from the ENC to the EOF (Does Not apply to Media calls).
- 7.
Inform Media Information Line Supervisor of staffing problems.
Event Termination/Closeout
- 1. Assist with restoration of facility to its original MIO stata.
- 2.
Forward all completed EPIPs/Forms/Attachments to the MIO Manager Communications Nuclear.
AIEPIP Rev. 5
J
',f r
I DATE:
TIME:
OPERATOR/
MONITOR:
CONCERN:
ATTACHMENT 10 CONCERN FORM -
RUMOR CONTROL CENTER GIVE COMPLETED FORM TO SUPERVISOR AIEPIP EPIP 804 Pg.* 32 of 33
. Bev. 5
-EPIP 804 Pq. 33 of 33 SIGNATURE PAGE Prepared By:
(If Editorial Reviewed By:
Station Qualified Reviewer Reviewed By:
~mer Reviewed By:
~IA General Manager - Quality Assurance/Safety Review (If Applicable)
SORC Review and Station Approvals Date Date Mtg. No.
Hope~eek Chairman
/i/B- -
Mtg. No.
Salem Chairman Date Date General Manager -
Salem General Manager -
Hope Creek Date*
Date AIEPIP Rev. 5
- 1.
NUCLEAR BUSINESS UNIT EMERGENCY PLAN ENC PROCEDURE EMERGENCY NEWS CENTER OPERATIONS SUPERVISOR (OS)
EPIP 805 Action Level EPIP 805 Pg. 1 of 12 Upon declaration of an Alert or higher for Emergency News Center (ENC) staffing or activation.
- 2.
Individual(s) Who Will Implement this Procedure Emergency News Center (ENC) Operations Supervisor/Security Force Members/Audio/Visual Services Coordinator/Computer Analyst
- 3.
Action Statement THE EMERGENCY NEWS CENTER (ENC) OPERATIONS SUPERVISOR (OS) SHALL:
NOTE The Emergency News Center Operations Supervisor shall work under the direction of the ENC Manager.
Initials 3.1 Prior to Activation of Facility:
3.1.1 OS 3.1.2 OS 3.1.3 OS 3.1. 4 OS 3.1. 5 OS 3.1_. 6 OS NBU-EPIP Notify ENC Manager of your arrival.
Initiate and maintain a chronological log of key activities/events.
As ENC team members arrive, give them their name tags, desk keys and procedures and compile an ENC roster for the ENC Manager (See Att. 1 for roster)
Advise EOF Administrative Support Manager (ASM) if additional personnel/resources are needed.
Direct setup of ENC using Attachment 2.
Direct Audio/Visual Service Coordinator to setup the gym for news briefings per Attachment 3 checklist.
Provide setup assistance as required/requested.
Rev. 7
EPIP 805 Pg. 2 of 12 Initials OS OS OS OS OS OS OS 3.1.7 Direct Security Force Member (SFM) to establish se-curity posts in accordance with Attachment 4.
Pro-vide each SFM with a briefing on his responsibilities and with a copy of Attachment 4.
3.1.8 Direct Computer Analyst to implement Attachment 6 of this procedure.
3.1.9 Assign job duties to ENC Administrative Support staff using Attachment 5.
3.1.10 Inform ENC Manager when ready to assume emergency response functions.
3.2 Post Activation of Facility 3.3 3.2.1 Direct administrative operations of the ENC including badging, security, computer support, clerical sup-port, procurement, meals, maintenance and first aid.
Event Termination/Closeout:
3.3.1 3.3.2 Assist with restoration of facility to its original state.
Ensure all completed EPIPs/Forms/Attachments are forwarded to the Communications Department.
- 4.
References Nuclear Business Unit Emergency Plan
- 5.
Attachments
- 1.
Emergency News Center (ENC) Roster
- 2.
ENC Operations Supervisor - Activation Checklist
- 3.
Audio/Visual Services Coordinator Checklist
- 4.
Security Force Members Assignments
- 5.
Administrative Support Staff Assignments
- 6.
Computer Analyst Assignments
- 6.
Signature Page NBU-EPIP Rev. 7
Title Company Spokesperson ENC Manager ENC Communications Supervisor ATTACHMENT 1 EMERGENCY NEWS CENTER ROSTER INITIAL STAFFING Public Info Liaison (At EOF)
Lead Tech Advisor (HC)
Lead Tech Advisor (Salem)
Communications Tech Advisor 1 (HC or Salem)
Communications Tech Advisor 2 Media Tech Advisors (HC or Salem)
Media Monitor Supervisor Media Monitor 1 Media Monitor 2 Staff Writer Staff Writer Industry Coordinator Rumor Control Coordinator Media Info Supervisor Media Info Line Operator Media Info Line Operator Media Info Line Operator Government Affairs Coordinator Computer Analyst Health Physics Spokesperson Admin Support Admin Support Audio/Visual Services Coordinator NBU-EPIP EPIP 805 Pg. 3 of 12 RELIEF STAFFING Rev. 7
ATTACHMENT 2 EPIP 805 Pg. 4 of 12 EMERGENCY NEWS CENTER OPERATIONS SUPERVISOR (OS)
ACTIVATION CHECKLIST Work Area Set-up:
Initials Post a Security Force Member (SFM) at the entrance to OS the Community Center to keep all non-ENC personnel out of the Community Center until it is activated.
Only allow persons with PSE&G identification or press credentials into the ENC.
Use Attachment 4 to make SFM assignments.
Assign remaining SFM's to walk through the building to OS check for unauthorized persons. Use Attachment 4 of this procedure to make SFM assignments (See Attachment 4).
Unlock doors to work areas.
Turn on lights.
OS Check phones in PSE&G and media work areas.
OS Check phones in State, NRC, and County work areas.
OS Turn on FAX and copy machines and test them.
OS If the Nuclear Business Unit issued a news bulletin prior OS to ENC activation, make sure copies are distributed to all ENC personnel and to the media in press briefing area and the work area.
Briefing Room (Gymnasium) Set-up:
Make sure the following items are in the gymnasium.
If OS they are not, they can be found in the storage room.
OS NBU-EPIP
- a.
Table skirt
- b.
Help desk boxes
- c.
Tables
- d.
Flip charts and markers
- e.
Flip chart with "Next Briefing At" lettering
- f.
Place name cards on table.
If name cards are not available for all speakers, make them.
(Remember to
_ change name cards when required).
Set-up of facility completed at Time/Date Rev. 7
Initials AVSC AVSC CHECK NBU-EPIP ATTACHMENT 3 EPIP 805 Pg. 5 of 12 AUDIO/VISUAL SERVICES COORDINATOR (AVSC) CHECKLIST Prior to Activation of Facility:
- 1.
Inform ENC Operations Supervisor of your arrival.
- 2.
Move any necessary A/V equipment to the gym, including the following items:
NOTE Some of this equipment may be permanently set up in the gym.
Dividers Projection screen Slide projector Overhead projector Stands #1 and #2 VHS tape deck and two tapes Video camera and cables Microphones, cables and stands Audio mult-boxes and audio snake box Gaff er tape Extra slide and overhead projector bulbs Extension cords/power strips All easels Flip charts and markers Flip chart with "Next briefing at 11 lettering Graphics/pictures as requested by A/V Support Coordinator Put folding screens on either side of stage Set up table #1 on stage Put skirt on table Place microphones on table Place name cards on table (Remember to change or add cards when required)
Put podium on stage Hang backdrop curtains Set up table #2 for video camera Place VHS tape deck, tapes on cables on table Rev. 7
CHECK AVSC AVSC AVSC AVSC AVSC AVSC AVSC ATTACHMENT 3 {cont)
Set up two easels near the stage Place other easels as indicated in gym Set up table #3 for press releases Place "next briefing at next to table #3 EPIP 805 Pg. 6 of 12 Set up table #4 and put help desk boxes on top Set up chairs for media Set up TV camera risers
- 3.
Test all equipment to make sure it works and report any problems to ENC Operations Supervisor.
- 4.
Make sure poster cards are correctly placed for maximum visual effect.
- 5.
Inform ENC Operations Supervisor when ready to assume Emergency Response Functions.
Post Activation of Facility:
- 1.
Make A/V tapes of every press briefing in its entirety.
- 2.
Change visuals when necessary.
Event Termination/Closeout
- 1.
Assist with restoration of facility to its original state.
- 2.
Ensure all completed EPIPs/Forms/Attachments/Tapes are forwarded to the Communications Department.
NBU-EPIP Rev. 7
ATTACHMENT 4 SECURITY FORCE MEMBERS ASSIGNMENTS EPIP 805 Pg. 7 of 12 (Attchment 4 to be implemented by ENC Operations Supervisor (OS))
Initials Assign Security Force Member (SFM) to walk through the building OS to check for unauthorized persons.
OS Assign SFM Post #1 and brief SFM on responsibilities as follows:
- a.
- b.
- c.
- d.
- e.
- f.
- g.
Maintain Post #1 in reception area opposite badging table.
Make sure locker room doors opening into hallway are locked.
Instruct media representatives to have identification ready to show badging personnel.
Direct media reps to the work/badging/briefing area and to the media room.
Keep media from PSE&G/Government Agency work areas.
Keep media from corridor leading past locker rooms.
Remove disorderly person(s) from the ENC as directed.
Assign SFM Post #2 and brief SFM on responsibilities as follows:
OS follows:
- a.
Maintain Post #2 outside media room and make sure no media representatives exit through back doorway.
- b.
Prevent media representatives from accessing PSE&G/Agency work areas.
Assign SFM Post #3 and brief SFM on responsibilities as follows:
OS follows:
- a.
Maintain Post #3 as a floating position between the press briefing floor and the media work area.
- b.
Prevent media representatives from approaching spokespersons as they go between the podium and the work area.
NBU-EPIP Rev. 7
EPIP 805 Pg. 8 of 12 ATTACHMENT 4 (cont)
- c.
Maintain a safe environment in crowds of reporters.
- d.
Make sure outside doorway adjacent to media room is locked and prevent entrance and exit through it.
- e.
Make sure both doors leading from locker rooms to gym floor are locked.
- f.
Make sure stanchions and rope used to separate spokespersons from reporters are in place.
- g.
Prevent reporters from approaching spokespersons as they enter and leave gymnasium.
NBU-EPIP Rev. 7
ATTACHMENT 4 PSE&G -
EMERGENCY NEWS CENTER MAIN ENTRANCE KITCHEN MAIN ACCESS CARD SCANNER
~o~~
"-...._,~
ENC OPERATIONS ROOM
~ SFM 1--~~~~
......... ~~~......-~~---.
DINING ROOM A.V. ROOM
_J__;-----:;_
PADLOCKS POST
- 1 STAFF ENC I
ENTRA~E\\@
ENC ACCESS CARD SCANNER DIRECTOR Key 77
_/ __ __
MEN WOMEN
=
RESTROOMS
~ENC ALARM CONTROLLER ENC CONFERENCE ROOM I
SFM
/
No Key/
/"-...._,
Key 77 SFM POST
- 2
/
EPIP 805 Pg. 9 OF 12 MEDIA INFO.
LINE ROOM ENC STAFF WRITERS RM MEDIA MONITOR ROOM NRC/FEMA ROOM NEW JERSEY ROOM DE. RM DE. COUNTY RM POST Key 76 *
- \\
- 3 -*"'.--___
\\ __ / "-...._, --- / "-...._, ---------1l!I Key 76 Key 76 NBU-EPIP Key 78
@ /Key 76
\\
TC\\
- = CLOSED AND UNLOCKED
- - CLOSED AND LOCKED
@ = UNLOCKED, OPEN AND LEFT OPEN WALNUT ST. SIDE REV. 7
EPIP 805 Pg. 10 of 12 ATTACHMENT 5 ADMINISTRATIVE SUPPORT ASSIGNMENTS (Attachment 5 to be implemented by ENC Operations Supervisor (OC))
Initials Assign clerical staff to the ENC Manager and the Company OS Spokesperson to provide typing, copying, and telecopier support as directed.
Assign additional clerical staff to the ENC Manager to act OS as messengers between ENC work room (PSE&G/Agency rooms and media work area).
Direct clerical staff to set up separate sign-in/badging table OS exclusively for news media representatives and other visitors in the Community Center reception area.
Assign clerical staff to meet media representatives as OS they enter.the ENC.
Follow badging instructions listed below:
- a.
Take box marked badging supplies to the sign-in table in the Community Center reception area.
- b.
Set out log book for media representatives and other visitors to sign.
- c.
Have media representatives sign in as they enter the building.
Ask to see their media or press badges when they sign in.
If they cannot produce a badge, ask them to step aside until you can confirm that they are media representative -- either by calling their home base or badged through another form of identification.
Direct badged media to the press briefing floor or to media work area.
- d.
Any non-media or non-PSE&G people who try to enter the ENC must be cleared by the ENC Operations Supervisor or the ENC Manager.
Assign clerical staff to monitor fax machine in OS communications work area and to distribute incoming status sheet to the following ENC Staff and put original sheet in binder on Lead Technical Advisor's desk.
- a.
ENC Communications Supervisor
- b.
Lead Technical Advisor
- c.
Communications Technical Advisor
- d.
Ind~stry Co-Owner Representative
- e.
Staff Writers
- f.
Government Relations Coordinator
- g.
ENC Manager NBU-EPIP Rev. 7
EPIP 805 Pg. 11 of 12 ATTACHMENT 6 COMPUTER ANALYST (CA) CHECKLIST Initials Prior to Activation of Facility:
- 1.
Notify the ENC Operations Supervisor of your arrival.
CA
- 2.
Check all computer and t~lecopier equipment to ensure CA operability.
- 3.
Inform ENC Operations Supervisor when ready to assume CA Emergency Response functions.
CA CA CA Post Activation of Facility:
- 1.
- 2.
3.
Report malfunction you can't fix to the ENC Operations Supervisor who can call for help from,the Emergency Operations Facility.
Monitor equipment during use to ensure efficient operation.
Assist other team members with computer problems.
Event Termination/Closeout:
- 1.
Assist with restoration of facility to its original CA state.
- 2.
Ensure all completed EPIPs/Forms/Attachments are CA forwarded to the Communications Department.
NBU-EPIP Rev. 7D
EPIP 805 Pg. 12 of 12 SIGNATURE PAGE Prepared By:
=-::>. 6u~eo, y:...j
'\\2_,~--1. "S' (If Editorial Revisions Only, ~ast Approved Revision)
Reviewed By:
Reviewed By:
Reviewed By:
Reviewed By:
Station Qualff ied Reviewer Departm~Manager Manager - ~i()~cal Safety Director - Qualit Assurance/Safety Review (If Applicable)
SORC Review and Station Approvals Date Date Date Mtg. No.
Hpe Creek Chairman Date General M~er - Salem Date Date Date Effective date of this revision is:
NBU-EPIP Rev. 7
NUCLEAR BUSINESS UNIT EMERGENCY PL ENC PROCEDURE ENC EVACUATION/ACTIVATION OF NEWS CENTER (ENC)
EPIP 806 EPIP 806 Pg. 1 of 15 CONTROL COPY#
5q
- 1.
Action Level Upon notification that Salem City is being evacuated or at the discretion of the Emergency Response Manager (ERM).
- 2.
Individual(s) Who Will Implement This Procedure
- 3.
ENC Manager/Company Spokesperson/ENC Operations Supervisor/ENC Communications Supervisor/Lead Technical Advisor Action Statements THE ENC MANAGER SHALL INITIATE EVACUATION OF ENC/ACTIVATION OF BACK-UP EMERGENCY NEWS CENTER:
Initials 3.1 Prior to activation of Back-up ENC:
3.1.1 ENCM 3.1. 2 ENCM 3.1.3 ENCM NBU-EPIP Initiate evacuation to and start-up of Back-up ENC based on directions from the Emergency Response Manager or New Jersey state officials.
Call PSE&G Camden Transmission and Distribution Dispatcher (1-800-552-8573 or 609-799-6843) and request that the Assembly Room be prepared for activation as Back-up ENC.
Notify all ENC personnel, federal, state, local officials, and the media of the evacuation of the ENC to the Back-up ENC and coordinate the exact time of departure, provide directions and supply maps (see of this procedure) to ENC personnel and the media.
Rev. 4
- Initials 3.1.4 ENCM 3.1.5 ENCM 3.1.6 ENCM 3.1.7 ENCM NBU-EPIP EPIP 806 Pg. 2 of 15 Instruct the ENC Operations Supervisor to ensure that directions to the Back-up ENC are communicated to in-coming phone callers and Back-up ENC directions are posted in the entrance of the ENC before evacuating the building.
Instruct the ENC Operations Supervisor to request logistical support from EOF Administrative Support Manager for transport of all materials and equipment listed in the ENC Inventory (see Attachment 2 of this procedure) to the Back-up ENC.
Request should include vehicles to transport all ENC equipment and helicopter transportation, if available, for Company Spokesperson, Lead Tech Advisor, and other key personnel.
Ensure all ENC personnel assist in packing their work station for transport to the Back-up ENC.
Individuals shall unplug and dismantle equipment as much as possible.
Notify the Public Information Liaison (PIL) in the EOF on NETS 5010, ESSX 7517 or DID 3889 that an ENC evacuation is in progress and that the Backup ENC Transfer Switch will need to be activated.
3.1.7.2 Direct the PIL to implement step 3.3 of EPIP 403, Public Information Liaison Response.
NOTE Provide the PIL with the exact time For a.m./p.m. you want the Moorestown phones to be activated.
example, if the Spokesperson is expected to arrive in Moorestown p.m., then the telephones should transferred no later than 1 p.m.
60 minutes contingency).
at 2 be (allow Rev. 4
'
- Initials ENCM NBU-EPIP 3.1.8 Brief the following personnel on their EPIP 806 Pg. 3 of 15 assigned duties for evacuation of the ENC/activation of the Back-up ENC before leaving ENC.
Company Spokesperson/Lead Technical Advisor/
Administrative Support Staff Member:
- a.
Take logs and travel together to the Back-up ENC in the Company Spokesperson's car with car phone.
- b.
Once in the car, establish contact with the EOF on the car phone and stay on the line with the PIL or his designee until arriving at the Back-up ENC.
The Administrative Support Staff Member should log car telephone conversations.
- c.
At the Back-up ENC, set up work area (see ) and establish phone contact with the EOF.
ENC Operations Supervisor:
- a.
Post directions to the Back-up ENC inside glass door at the ENC entrance before evacuating the building.
- b.
Request logistical support from the EOF Administrative Support Manager for transport of all materials and equipment listed in the ENC inventory (see Attachment 2).
Request vehicle for transporting equipment and helicopter transportation, if available, for Company Spokesperson, Lead Tech Advisor, and other key personnel.
- c.
Ensure all supplies are packed and transported to the Back-up ENC.
- d.
Notify operations Supervisor on next shift, and any other ENC personnel indicated by ENC Manager, to report to Back-up ENC.
- e.
Ensure that security of ENC is maintained during the evacuation and locked upon departure.
- f.
Evacuate to Back-up ENC and set up area upon arrival in accordance with Attachment 3.
Rev. 4
\\
- NBU-EPIP ENC Communications Supervisor:
EPIP 806 Pg. 4 of 15
- a.
Ensure portable computers, printers, and battery back-up units are transported to back-up ENC.
- b.
Notify Corporate Communications of evacuation and set up system for communication via car phone, answering machine or call forward.
- c.
Notify NJ State Police assigned to ENC and Moorestown Police Department of evacuation and request patrolman be assigned to entrance and parking area at the Camden Transmission and Distribution Center.
- d.
Assign one writer to back-up ENC and the other. to EOF.
Notify a writer from next shift to report to back-up ENC.
- e.
Evacuate to the back-up ENC.
- f.
Upon arrival at the Back-up ENC, set up work areas, IAW Attachment 3, re-establish contacts, and resume ENC duties.
(See Attachment 4, Writer
& Media Information Line Supervisor).
Lead Technical Advisor:
- a.
Direct Media/Communications Technical Advisors to pack logs and resource information for transport to the Back-up ENC.
- b.
Direct Media/Communications to evacuate to the Back-up ENC.
- c.
Notify the PIL that evacuation is necessary and that you will establish contact via car phone.
- d.
Accompany the Company Spokesperson to the Back-up ENC and maintain contact with the EOF during transport.
- e.
Upon arrival at the Back-up ENC, contact the EOF.
- f.
Set up work area IAW Attachment 3, and resume ENC duties.
Rev. 4
NBU-EPIP Communications Technical Advisor:
- a.
Evacuate ENC.
EPIP 806 Pg. 5 of 15
- b.
Upon arrival at the Back-up ENC, re-establish telephone contact with the PIL.
- c.
Set up work area IAW Attachment 3, and resume ENC duties.
Media Technical Advisors:
- a.
Pack logs and resource information, including Help Desk materials for transport to the Back-up ENC.
- b.
Evacuate ENC.
- c.
Upon arrival at Back-up ENC, set up work areas, including Help Desk, IAW Attachment 3, and resume ENC duties.
Media Monitor:
- a.
Pack for transport to the Back-up ENC only those items of equipment that are portable (small, unattached TV monitors and radio scanners).
- b.
Evacuate ENC
- c.
Upon arriving at the Back-up ENC, reconnect A/V equipment and set up work area, IAW Attachment 3, Resume ENC duties.
Rumor Control Coordinator:
- a.
Contact the Rumor Control Center Supervisor and alert him/her about the evacuation. Indicate that there will be a delay before the next news bulletin is issued.
- b.
Instruct Rumor Control Center Supervisor to inform the Southern Inquiry Center (SIC) staff and the Northern Inquiry Center Staff (NIC) staff that evacuation is in progress at the ENC and that it will cause a delay in the flow of information.
Direct SIC/NIC Staff to continue to provide the information they already have to callers.
Rev. 4
NBU-EPIP EPIP 806 Pg. 6 of 15
- c.
Record message on Muskrat Line:
(See "Rumor Control Coordinator" in Attachment 4).
- d.
Evacuate ENC.
- e.
On arrival at the Back-up ENC, contact the Rumor Control Center Supervisor, set up work area IAW, and resume ENC duties.
Computer Analysts:
- a.
Assist in packing computers and printers for transport to Back-up ENC.
- b.
Evacuate ENC.
- c.
Upon arrival at Back-up ENC, assist in unpacking and setting up computers and printers.
Health Physics Advisor:
- a.
Pack information resources for transportation to the Back-up ENC.
- b.
Evacuate to Back-up ENC.
- c.
Upon arrival at the Back-up ENC, set up work area IAW Attachment 3, and resume ENC duties.
Government Relations Coordinator:
- a.
Pack information resources for transportation to Back-up ENC.
- b.
Call federal affairs, state governmental affairs, and LAC Township contacts to inform them of the evacuation and to expect delays in the information flow.
- c.
Evacuate to the Back-up ENC.
- d.
Upon arrival at the Back-up ENC, re-establish phone contact with federal, state, and township officials.
Set up work area IAW Attachment 3 and resume ENC duties.
Rev. 4
EPIP 806 Pg. 7 of 15 Initials 3.2.
Post Activation Back-up ENC.
3.2.1 Notify the ERM at the EOF when the back-up ENCM ENC is ready to activate and ensure that the Public Information Liaison at the EOF has resumed communications with the Communications Technical Advisor in the Backup ENC.
Approval of news bulletins reverts from ERM back to Company Spokesperson.
ENCM ENCM ENCM ENCM 3.2.2 3.2.3 Brief the Rumor control Coordinator on assigned duties for activating the back-up ENC, including updating the Muskrat Information Line.
Conduct a press briefing as soon as possible after activation of the back-up ENC.
3.3 Event Termination/Closeout:
3.3.1 3.3.2 Ensure Restoration of Facility to its original state.
Forward all completed EPIP's/Forms/Attachments to the Manager Communications - Nuclear.
- 4.
References Nuclear Business Unit Emergency Plan
- 5.
Attachment
- 1.
Back-up ENC Directions With Evacuation Map
- 2.
ENC Evacuation Inventory
- 3.
Moorestown Building Diagram, Backup ENC Floorplan & Telephone Directory
- 4.
Writer, Media Information Line Supervisor and Rumor Control Coordinator
- 6.
Signature Page NBU-EPIP Rev. 4
ATTACHMENT 1 BACK-UP ENC DIRECTIONS EPIP 806 Pg. 8 of 15
- 1.
Exit ENC parking lot and turn right on Grieves Parkway 2.. Make first right turn onto Walnut Street and proceed to traffic light on Route 49
- 3.
- 4.
5.
- 6.
- 7.
8.
- 9.
Turn left on Route 49 (Broadway)
Proceed West on Route 49 toward Pennsville to Hook Road (veer right at light - Walmart Shopping Center) proceed to Route 295 North Take Route 295 North to exit for Route 73 North (this is after exits for Walt Whitman Bridge, Cherry Hill, etc.)
Proceed North on Route 73 to Route 38 Turn right on Route 38 Take Route 38 to intersection with Lenola Road Continue through intersection with Lenola Road and Route 38 and take first jug handle immediately after intersection onto Lenola Road
- 10. Proceed Northwest on Lenola Road to New Albany Road (will pass Haddonfield Road and Camden Av~nue before reaching New Albany)
- 11. Turn right on New Albany Road and proceed to PSE&G's Camden Transmission and Distribution Center on right side of road
- 12. See police patrol car assigned to the back-up ENC for directions on where to park and enter building NBU-EPIP Rev. 4
.~
NBU-EPIP ATT. 1 (cont.)
BACK-UP S
NCY NEW EMERGEEVACUATION CENTER MAP ROUTE MOORESTOWN Delaware g
Memorial V
Bridge CHERRY
~
HILL
~
PENNSVILLE N
DRIVING ESTIMATrwoM ENC TIME !K _UP ENC TO BAO MINUTES.
rs 9 EPIP 806 13 Pg. g of Rev.~4 __ _
.~
ATTACHMENT 2 ENC EVACUATION INVENTORY EQUIPMENT Overhead Projectors Extra Overhead Projector Bulbs 35 mm Projector Extra Bulbs Projector Stands EBS Radio AM/FM Cassette Radio Blank Audio Cassettes Blank Tapes for VCR Stick-on Media Badges Registration Log/Files Pads Pencils Pens Log Books Fax Paper First Aid Kit Flashlights Fax Machines Portable Computers Battery Operated Printers Display Boards (plant photos, system, etc. )
Help Desk Files Off ice Files Photo Copy Paper All Telephone Instruments with Jack Cords COMPLETED BY: _________ ~
NBU-EPIP MINIMUM QTY. PACKED 2
2 1
3 2
1 1
12 12 300 2
2 doz.
2 doz.
4 doz.
1 doz.
6 rolls 1
12 3
8 2
ALL ALL ALL 2 cases 50 TIME: ____ _
EPIP 806 Pg. 10 of 15 CHECKED AS DATE: ___ _
Rev. 4
N E
w A
L B
A N
y R
0 A
D ATTACHMENT 3 CAMDEN TRANSMISSION AND DISTRIBUTION CENTER MOORESTOWN, N.J.
BACK-UP EMERGENCY NEWS CENTER BUILDING DIAGRAM (OFFICES/SHOPS)
COPY
/
//~nn i __
LOBBY
'\\ L_J LJ ENTRANCE
~ T (OFFICES/SHOPS)
EMERGENCY NEWS CENTER (ASSEMBLY ROOM LIMITED PARKING BLOCK BUILDING MAIN PARKING NBU~EPIP EPIP 806 PG. II OF 16 REV. 4
NBU-EPIP ATT. 3 (CONT.)
BACKUP ENC - MOORESTOWN T&D FLOORPLAN LECTURE AREA PRESS/MEDIA BRIEFING AREA m===m
=
PARTITION WALLS PRINT STAND>D MEDIA CM SPVR
- INFO OPS SPVR
- Ii A II FAX {NETS)
TECHNICAL SPKPRSN
- ADVISORS ENC MGR.*
GOVT. RELATIONS INDUSTRIAL RELATIONS STAFF MEDIA WRITERS MONITORS RUMOR CONTROL FAX Ii B II NRC/FEMA NJBNE/OEM DELAWARE COUNTIES
<WHITEBOARD /FLIP CHART 20 NETS 20 -
COMMERCIAL OPS SPVR 1 CIRCUIT OPS 1 CIRCUIT WRITERS 4 CIRCUITS WRITERS 1 CIRCUIT EPIP 806 PG. 12 OF 16 TECH ADVISORS -
2 CIRCUITS MEDIA INFO 5 { 1 FOR FAX)
NRC/FEMA NJ 2 CIRCUITS 1 CIRCUIT DE 2 CIRCUITS NEW JERSEY 2 CIRCUITS ENC MGR.
1 CIRCUIT DELAWARE 2 CIRCUITS CM SPVR 1 CIRCUIT GOVT /IND /RUMOR 1 CIRCUIT CM TECH 1 CIRCUIT PRESS 5 CIRCUITS NRC/FEMA 4 CIRCUITS SPEAKER 1 CIRCUIT FAX 1 CIRCUIT ENC MANAGER 1 CIRCUIT SPOKESPERSON -
1 CIRCUIT REV. 4*
EPIP 806 Pg. 13 of 15 ATTACHMENT 3 (cont.)
PSE&G'S BACKUP EMERGENCY NEWS CENTER MOORESTOWN TELEPHONE DIRECTORY TELEPHONE NUMBERS LOCATED ON COLUMN "A" Company Spokesperson COMM Supervisor A-1 A-2 A-3 A-4 A-5 A-6 A-7 A-8 (609) 273-1948 (Speaker)
(609)273-1961 (ENC Mgr.)
(609)273-2261 (OPS Spvr.)
(609)273-2488 (Med.Info.)
(609)273-2539 (Med.Info.)
(609)273-2690 (Med.Info.)
(609)273-2691 (Med.Info.)
(609)273-2774 (Fax)
ENC Manager OPS Supervisor A-9 A-10 A-11 A-12 A-13 A-14 A-15 A-16 TELEPHONE NUMBERS LOCATED ON COLUMN "B" Staff Writers NRC/FEMA B-1 (609) 273-2263 (Writers)
B-2 (609) 273-2787 (NRC)
B-3 (609) 273-2873 (NJ)
B-4 (609)273-3156 (NJ)
B-5 (609) 273-3257 (DE)
B-6 (609) 273-3379 (DE)
Media Monitor DE/NJ States B-7 (609)273-3380 (Govt/Indus)
B-8 B-9 B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-19 TELEPHONE NUMBERS LOCATED ON COLUMN "C" Media Only C-1 (609)273-3689 (Media)
C-2 (609) 273-3793 (Media)
C-3 (609)273-4388 (Media)
TELEPHONE NUMBERS LOCATED ON COLUMN "D" Media Only D-1 (609)273-5895 (Media)
D-2 (609) 273-5928 (Media)
NBU-EPIP Technical Advisors Media Info Operators NETS 5300 NETS 5301 NETS 5303 NETS 5309 NETS 5313 NETS 5314 NETS 5315 NETS 5318 (ENC Mgr.)
(OPS Spvr.)
(Ld. Tech Adv)
(Tech Adv.)
(Comm Tech)
(Speaker)
(Comm Spvr. )
(Fax)
Govt/Indust. Relations Rumor Control Fax NETS 5302 (Media Monitor)
NETS 5304 (NJOEM)
NETS 5305 (NJBNE)
NETS 5306 (DEMA)
NETS 5307 (DEMA)
NETS 5308 (FEMA)
NETS 5310 (NRC)
NETS 5311 (NRC)
NETS 5312 (NRC)
NETS 5316 (Staff Writers)
NETS 5317 (Govt/Indus Rel)
NETS 5319 (Rumor Cont Fax)
Rev. 4
ATTACHMENT 4 WRITER MEDIA INFORMATION LINE SUPERVISOR AND RUMOR CONTROL COORDINATOR EPIP 806 Pg. 14 of 15 Writer:
- a.
Ensure all prior news bulletins are saved.
- b.
Pack and bring with you portable computers, printer, and battery back-up units.
- c.
If you are assigned to EOF, report directly to the ERM.
Continue to issue news bulletins at the direction of the ERM.
All news bulletins issued from the EOF must be reviewed and approved by the ERM until Back-up ENC is activated.
- d.
Issue news bulletin publicizing new media information line telephone numbers for Back-up ENC.
These are:
609-273-2488, 609-273-2539, 609-273-2690, and 609-273-2691.
Media Information Line Supervisor:
a.
Record the following message on the media information lines:
The Emergency News Center is being evacuated to a back-up facility as of a.m./
p.m.,
(month),
(day), and
--- (year).
The back-up Emergency News Center will become operational and this press information line restored in approximately two hours.
Press briefings will be resumed at that time in the backup Emergency News Center located in the PSE&G Transmission and Distribution Center on New Albany Road between Lenola Road and Church Street in Moorestown, Burlington County, New Jersey.
The Emergency News Center is being evacuated to a back-up facility as of a.m./
p.m.,
(month),
(day), and
--- (year).
The back-up Emergency News Center will become operational and the Muskrat Information Line restored and updated at that time.
Please call again when this line has been restored.
Rumor Control Coordinator:
- a.
Record the following message on the Muskrat Information Line:
The Emergency News Center is being evacuated to a back-up facility as of a.m./
p.m.
NBU-EPIP Rev. 4
EPIP 806 Pg. 15 of 15 SIGNATURE PAGE 5
Reviewed By:
c.//'~17~
Date Reviewed By: ~~+--+--~~~~~-----,,~~~-~~~ &,#axf 5 Reviewed By:
'..)
0~/J~'
Manager -
Support Date Reviewed By:
.J ~
Director - Quality Assurance Safety Review (If Applicable)
SORC Review and Station Approvals Date Mtg. No.
Salem Chairman Mtg. No.
Hope Creek Chairman I'"\\ n Date j?_j< ~
Date General Manager - Salem Thate
'Date NBU-EPIP Rev. 4