Submits Update to Exemption Request for Fire Protection Re App R for Units 1 & 2.Util Implemented Mod to CR Complex for Units 1 & 2 Which Impacts Description of Control Room Complex Contained in 880715 Exemption Request
ML18102B378
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/04/1997
From: Eric Simpson
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LR-N97354, NUDOCS 9706110065
Download: ML18102B378 (2)


Text

Public Service Electric and Gas Company E. C. Simpson Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1700 Senior Vice President - Nuclear Engineering JUN 4 1997 LR-N97354 U. S. Nuclear Regulatory Corrunission Document Control Desk Washington, DC 20555 UPDATE TO EXEMPTION REQUEST FIRE PROTECTION - APPENDIX R SALEM GENERA.TING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Gentlemen:

On July 15, 1988, Public Service Electric and Gas (PSE&G) submitted exemption requests to 10CFR50, Appendix R via letter NLR-N88070. Exemption 2 contained in this submittal was associated with the Control Room Complex (Area 12FA-AB-122A).

The NRC issued the safety* evaluation granting the exemption from 10CFR50, Appendix R for the Control Room Complex on July 20, 1989. PSE&G submitted in letter NLR-N92092, dated July 14, 1992, corrections regarding the description of the control room complex that was contained in the July 20, 1989 NRC Safety Evaluation Report. On June 17, 1994, the NRC reviewed its previous evaluation against the description of the Control Room Complex contained in the July 15, 1988, and concluded that its previous evaluation and conclusions remained valid despite the new understanding of the physical description of the control room complex..

PSE&G has implemented a modification to the control room complex for both Salem Units 1 and 2 which impacts the description of the control room complex that was contained in the July 15, 1988 exemption request. The modification combined the separate Unit 1 and 2 control rooms into a corrunon control room area. The Control Room Complex as a result of the modification will consist of the corrunon Control Room Area, Computer Rooms, Control Equipment I Rooms, Control Area Air Conditioning Rooms, a Shift \

Superintendent's office, File Room, Operational Support J~O C)J V 9706110065 970604 PDR ADOCK 05000272 F PDR 11\1\1\\\\\\\\ll~\\\~~

~ Printedon

\:f Recycled Paper

  • JUN 4 1997
  • Document Control Desk 2 LR-N97354 Center/Conference Room, Operators Ready Room, Work Control Center, a rest* room, and a Janitor Equipment Room.

The above changes to the control room complex do not change the basis for the original exemption submitted on July 15, 1988. The modification to the control room described above only affects the description of the control room complex stated in the July 15, 1988 PSE&G exemption request and the NRC Safety Evaluations dated July 20, 1989, and June 17, 1994 for Exemption 2.

If you should have any questions regarding this submittal please do not hesitate to contact us.

C Mr. H. J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. Olshan, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. C. Marschall (X24)

USNRC Senior Resideni Inspector Hope Creek Generating Station Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625 95-4933