ML18102A524

From kanterella
Jump to navigation Jump to search
Suppl to 961001 Application for Amends to Licenses DPR-70 & DPR-75,revising SR to Exclude Provisions of Spec 4.0.4 & Addressing Actions Taken Should MSIV Be Inoperable While Operating in Modes 1-3
ML18102A524
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/31/1996
From: Sotrz L
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18102A525 List:
References
LR-N96336, NUDOCS 9611130209
Download: ML18102A524 (3)


Text

J *

  • Public Service Electric and Gas Company Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President - Nuclear Operations OCT 311996 LR-N96336 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SUPPLEMENT TO REQUEST FOR CHANGE TO TECHNICAL SPECIFICATIONS MAIN STEAMLINE ISOLATION VALVE TESTING LCR S96-12 SALEM GENERATI~G STATION NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 Gentlemen:

By letter LR-N96285, dated October 1, 1996, Public Service Electric & Gas Company (PSE&G) submitted a request to amend Technical Specification (TS) 3/4.7.1.5 pertaining to Salem Generating Station's Main Steamline Isolation Valves (MSIVs)

This letter provides a supplement to that request.

The requested change to the MSIV TS revises the surveillance requirement to exclude the provisions of Specification 4.0.4 and addresses actions taken should a MSIV be inoperable while operating in Modes 1-3. In the submittal, PSE&G requested that the TS actions for operation in Mode 1 be revised to allow the plant to proceed to Mode 2 within six hours if an inoperable MSIV cannot be restored to operable within four hours. This would allow sufficient time for operators to place the plant in a safe condition to close the valve. If the valve is unable to be closed while in Mode 2, the plant shutdown would continue to Mode 4 within twelve hours as required by the current TS.

PSE&G has amended the proposed TS wording, (refer to the attached TS pages), to include an additional action to perform a weekly check of the closed valve(s) and also to separate the twelve hours for achieving Hot Shutdown into two intervals: six hours to transition to Mode 3, Hot Standby, and an additional six hours to transition to Mode 4. These changes are proposed to provide \

greater consistency with the requirements of NUREG-1431, ~ D "Standard Technical Specifications - Westinghouse Plants," (~

Revision 1. All other proposed changes to the TSs detailed in letter LR-N96285 remain as submitted .

...&-~-"' ------

9611130209 961031 PDR ADOCK 05000272 P PDR

/:1,\. Printed on W Recycled Paper

  • OCT 311996 Document Control Desk 2 LR-N96336 A review of the previously submitted evaluation in accordance
  • with the three standards set forth in 10CFR50.92 has been performed and concluded that no change is necessary as a result of the revised pages and the conclusion of no significant hazards consideration remains valid.

Should you have any questions regarding this supplement, we will be pleased to discuss them with you.

Attachment C Mr. H. J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Alleridale Road King of Prussia, PA 19406 Mr. L. Olshan, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. C. Marschall (X24)

USNRC Senior Resident Inspector Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625 95-4933

COUNTY OF SALEM L. F. Storz, being duly sworn according to law deposes and says:

I am Senior Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning Salem Generating Station, Units 1 and 2, are true to the best of my knowledge, information and belief.

Subscribed and Sworn1'Jo before me this J /~ day of (J}r!Jv/JlL, 1996

~~~Mnw11L Notary Public ~New Jersey l(IMBERLYJO BROWN NOTARY PUBLIC OF NEW JERSEY My Commission expires on My Commission Expires April 21 1998