ML18101B311
| ML18101B311 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 04/03/1996 |
| From: | Dawn Powell Public Service Enterprise Group |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LR-N96089, NUDOCS 9604080371 | |
| Download: ML18101B311 (2) | |
Text
.-
e PS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit APR 0 3 1996 LR-N96089 LCR S94-23 LCR S95-12 LCR H94--02 LCR H94-27 LCR H93-06 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
WITHDRAWAL OF REQUESTS FOR AMENDMENT SALEM GENERATING STATION UNITS 1 AND 2 AND HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSES DPR-70, DPR-75 AND NPF-57 DOCKET NOS. 50-272, 50-311 AND 50-354 Public Service Electric & Gas Company (PSE&G) has submitted the following requests for license amendments for Salem Generating Station Units 1 and 2 and Hope Creek Generating Station.
License Change Request (LCR) S94 Hydrogen Recombiner Surveillance Requirement Revision for Salem Generating Station Units 1 and 2 (Letter NLR-N94170 dated December 9, 1994).
License Change Request (LCR) S95 One-Time Extension of Surveillance Requirement 4.8.1.2 for Salem Generating Station Unit 1 (Letter LR-N95150 dated September 28, 1995).
Li9ense Change Request (LCR) H94 Changes to Axial Power Range Monitor Flow-Biased Scram/Control Rod Block for Hope Creek Generating Station (Letter NLR-N94029 dated November 28, 1994).
License Change Request (LCR) H94 Rod Block Monitor Setpoint Revision for Hope Creek Generati~g Station (Letter NLR-N94029 dated November 28, 1994).
License Change Request (LCR) H93 Surveillance Test Interval/Allowed Outage Time Extensions for Hope Creek Generating Station (Letter NLR-N93154 dated October 18, 1993).
1{00(
-~
,,- ------96o4oao37i-96o4o3 PDR ADOC~~ 05000272.
\\\\O 9~-2168 REV. 6/94 p
PDR i he power is m your hands.
Document Control Desk LR-N96089 APR 0 3 1996 LCR S94-23 LCR S95-12 LCR H94-02 LCR H94-27 LCR H93-06 PSE&G has determined that review and approval of these license amendment requests are not necessary at this time.
Therefore, PSE&G hereby withdraws from consideration for approval LCRs S94-23, S95-12, H94-02, H94-27 and H93-06.
Should there be any questions regarding this submittal, please do not hesitate to contact us.
Sincerely, AJ,R PU4~
D. R. Powell Manager -
Licensing and Regulation C
Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. Olshan, Licensing Project Manager -
Salem U. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. D. H Jaffe, Licensing Project Manager - Hope Creek
- u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. c. Marschall {X24)
USNRC Senior Resident Inspector Mr. R. Summers {X24)
USNRC Senior Resident Inspector Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625