Responds to 941219 Request Re GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Control Assemblies, 10CFR50.54(f)
ML18101A520
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/27/1995
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-93-04, GL-93-4, LR-N95010, NUDOCS 9502020294
Download: ML18101A520 (2)


Text

Stanley LaBruna Vice President - Nuclear Engineering Public Service Electric and Gas Company I

Public Service Electric and Gas/Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1700 JAN 2 71995 LR-N95010 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 Gentlemen:

RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ROD CONTROL SYSTEM FAILURE AND WITHDRAWAL OF ROD CONTROL CLUSTER ASSEMBLIES SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 This letter is to provide Public Service Electric & Gas's (PSE&G' s) response to your Request for Additional Informat,ion (RAI) dated December 19, 1994 regarding Generic Letter 93-04, "Rod Control System Failure and Withdrawal of Rod Cluster Control Assemblies, 10CFR50.54(f)."

Pursuant to the reference letter, the staff requested that the Salem Generating Station commit to the following:

A)

Implementation of the Westinghouse Owners Group (WOG) recommended current order timing modification prior to startup from the next refueling outage that begins later than 3 months from 12/19/94 or provide an alternative long-term plan and schedule, B)

Implementation of the WOG recommended new current order surveillance test(s) to be performed each refueling outage beginning with the next refueling outage that starts later than 3 months from 12/19/94 or provide an alternative long-term plan and schedule, and C)

Inform the staff in writing after "A" and "B" above have been implemented.

As delineated in our initial response to the Generic Letter dated September 21, 1993, PSE&G has been actively working with the WOG on the recommended long term resolution.

For Salem Unit 2, a design change was implemented to incorporate the recommended current order timing change during the eighth refueling outage, (which began in October 1994).

The WOG recommended preventive maintenance tests were also put in.place for Salem Unit 2 at that

,---------- --- - ----~---------

9502020294 950127

'1 PDR ADOCK 05000272 1

P PDR D

9,.,__

'*r.,.

JAN 2 7 1995 Docume"I1t Control Desk LR-N95010 2 -

time.

These same changes are scheduled for Salem Unit 1 during the twelfth refueling outage to begin in April, 1995.

This letter therefore serves as written notification of the implementation of the recommended changes for Salem Unit 2.

A separate letter will be sent to the staff upon implementation for Salem Unit 1.

Please contact us should there be a need for any additional information.

Sincerely, c

Mr. T. Martin Regional Administrator/Region 1 U. s. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. N. Olshan, Licensing Project Manager -

Salem U. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. c. s. Marschall (S09)

USNRC Senior Resident Inspector Mr. Kent Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 95-4933