Forwards List of SG Tube Plugging Locations in Support of Eleventh Refueling Outage
ML18100A720
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/22/1993
From: Vondra C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9312020413
Download: ML18100A720 (2)


Text

..

e PS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 November 22, 1993 TECHNICAL SPECIFICATION SURVEILLANCE 4.4.5.5.a NOTIFICATION On November 10, 1993, Steam Generator (S/G) tube plugging, in support of the eleventh refueling outage, was completed.

Attached is a list of the plugged tube locations. In all, twenty-six (26} tubes were plugged due to imperfection depths greater than or equal to 40% and two (2) were plugged due to imperfection depths between 30% and 40%.

This notification is being made, within fifteen (15) days after tube plugging, as required by Technical Specification Surveillance 4.4.5.5.a MJPJ:dpc r-------- -

~g~2020413 -93ii~~-- --~,

p ADDCK 05000272 PDR The power is in your hands.

  • General Manager-Salem Operations 95-2189 REV 7-92

Steam Generator Tubes Plugged Eleventh Refueling Outage ATTACHMENT S/G Row/Column

% Depth S/G Row/Column

% Depth Top of Tube Sheet - Rotating Pancake Coil CRPC} Program 11 2/53

>40 13 3/59

>40 7/75

>40 6/6

>40 17/52

>40 12/48 50 17/59

>40 13/49 46 18/58 53 13/50

>40 18/60 51 14/39

>40 19/59

>40 20/55

>40 14 17/83

>40 20/61

>40 31/52

>40 NOTE:

All above RPC identified indication depths were inspected via the Bobbin Coil Inspection {BCI) Program to quantify the percent depth of indication due to the relative nature of the degradation.

11 13 39/52 40/56 30/42 31/15 38/59 38/63 Bobbin Coil Inspection CBCI} Program 37 40

>40

>40 44 51 12 14 5/42 8/4 28/85 33/43

.44/35

>40

>40

>40

>40 39 NOTE:

All distorted bobbin coil signals were inspected via RPC probes to further evaluate potential indications.. In those cases where the RPC inspection confirmed a defect, through-wall depth was determined to be greater than 40%.