Forwards Insp Repts 50-272/93-21,50-311/93-21 & & 50-354/93-21 on 930905-1016 & Notice of Violation
ML18100A694
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 11/03/1993
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18100A695 List:
References
NUDOCS 9311150129
Download: ML18100A694 (3)


See also: IR 05000272/1993021

Text

. . '

Docket Nos. 50-272

50-311

50-354

Mr.* Steven E. Miltenberger

NOV

3 1993

Vice President and Chief Nuclear Officer

Public Service Electric and Gas Company

P.O. Box 236

Hancocks Bridge, NJ 08038

Dear Mr. Miltenberger:

SUBJECT:

SALEM AND HOPE CREEK RESIDENT INSPECTION NOS. 50-272/93-21;

50-311/93-21; 50-354/93-21

The enclosed report documents an inspection to assure public health and safety, conducted by

Mr. C. Marschall, Senior Resident Inspector, and other members of the NRC resident and

regional staff at the Salem and Hope Creek Nuclear Generating Stations for the period

between September 5, 1993 and October 16, 1993. The inspectors discussed the findings of

this inspection with Messrs. C. Vondra and R. Hovey of your staff.

Within the scope of this inspection, the inspectors noted one violation, involving an example

of Technical Specification non-compliance. The details of this issue, which concerned the

failure to initiate a timely shutdown of Salem Unit 1 following the unsatisfactory completion

of a solid state protection system surveillance test, were documented in NRC Inspection

Report 50-272, 311 and 354/93-20. We recognize that your staff identified this violation and

took appropriate corrective actions; however, we remain concerned that this was an

additional example of your staffs untimely response to indications of potentially safety-

significant events at Salem. Accordingly, you are requested to reply within 30 days of

receipt of this letter, indicating the corrective actions taken in response to this event and all

actions taken to prevent similar recurrences. In accordance with 10 CFR 2.790 of the

NRC's "Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC

Public Document Room.

Your cooperation with us is appreciated.

9311150129 931103

PDR

ADOCK 05000272

0

PDR

Sincerely,

O r:i'"W~L S'G"'"D B

hh.J * .. ~n

I

rwL.

Y

  • EDWARD C. WENZINGER

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

fto(

I { I

NOV

3 1993

Public Service Electric and Gas Company

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Inspection Report Nos. 50-272/93-21; 50-311/93-21; 50-354/93-21

cc w/encl:

J. Hagan, Vice President - Nuclear Operations

C. Vondra, General Manager, Salem Operations

R. Hovey, General Manager, Hope Creek Operations

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

F. Thomson, Manager, Licensing and Regulation

J. Robb, Director, Joint Owner Affairs

A. Tapert, Program Administrator

R. Swanson, General Manager, Quality Assurance and Nuclear Safety Review

M. Wetterhahn, Esquire

R. Fryling, Jr., Esquire

P. Curham, Manager, Joint Generation Department, Atlantic Electric Company

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

. '

NOV

3 1993

Public Service Electric and Gas Company

3

bee w/encls:

Region I Docket Room (with concurrences)

bee w/encls via E-Mail:

J. Stone, NRR

S. Dembek, NRR

V. McCree, OEDO

L. Nicholson, Acting PDI-2, NRR

DRP:RI

C. S. Marschall

I 193

'

,.-

I

D.~:ip1

E.Lq~/Wenzinger

\\_,'.

'.' ! /.'.: /93

~

..

/

OFFICIAL RECORD COPY