Jeanne M. Fox Acting Commissioner State of New Jersey Department of Environmental Protection and Energy DMsion of Environmental Safety, Health and Analytical Programs CN415 Trenton, NJ 08625-0415 September 20, 1993 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 To Whom it May Concern:
Subject:
Salerr(' :Nuclear Generating Station, Unit 2.
Docket No. 50-311 License Change Request 93-01, Revision 1
-Gerald-P. Nicholls, Ph.D.
Director
,_" N.c> Power, Requirements During Switchyard Modifications
,_f.<N* *; *_**:';.
~->:~*~:.:*.:-.,~*
',,_y*;
.:*~~:.. ;~...
- ~.**: 0.:*::ri*::::
-::~::~:1?
- -.~~-,.*
~-*:.~*:_~-, :_*;*-*
O ~
-~*
, By -letter-dated August- "24): ':1993 'F 'Public ;*se'rviC(;Electri6,. and -
Gas Company ( PSE &G) submitted the subject ',l icerise. change request to the Nuclear Regulatory Commission _:(NRC).,. The, letter is a -revision of PSE&G's request of August 4, 1993 (NLR-N93075), in response to NRC staff comments received from the Licensing Project Manager for the Salem Generating Station, Mr. J. c. Stone.
The requested *change would extend the Allowed Outage Time (AOT) that the Salem Unit 2 may operate with one inoperable offsite power circuit, to allow fer switchyard rr1cdifications.
It would also modify the Emergency Diesel Generator (EDG) testing requirements to exempt the Unit 2 EDG from repetitive testing when an offsite power circuit is de-energized for implementation of switchyard modifications.
Per 10 CFR 50.9l(b) requirements, the New Jersey Department of Environmental Protection and Energy's (NJDEP&E) Bureau of Nuclear Engineering (BNE)' reviewed* the License Change'* Request (which included the *-revi*sed propbsed*amendment, -* '.PSE&G 1*s* re'asohed*analysis about no significant hazards consideration, and PSE&G's response to NRC's comments).
Based on this review, the BNE has no comments on the proposed:~ request...
,:- i * *
-£:.,..,..... ~
- __
9309290021*930920 PDR ADOCK 0500~~~1
. p f1JJ
~)
New jersej Is an Equal Opportunity Employer Recyded Paper I
I 0
2 -
If you have any questions, please contact Suren Singh at (609) 987-2039.
Sincerely,
~~/=;A--
Kent Tosch, Manager Bureau of Nuclear Engineering
- c.
J. Lipoti, Assistant Director Radiation Protection Programs, NJDEP&E Marie Miller, State Liaison Officer -Region I U.S. NRC J. Stone, Project Manager, NRR U.S. NRC
- s. Barr, Artificial Island Acting Senior Resident Inspector U.S. NRC F. Thomson, Manager Licensing and Regulation PSE&G