Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations OCT 2 8 1992 NLR-N92155 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
FOLLOWUP RESPONSE TO GENERIC LETTER 91-11 SAL~M GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 By letter dated August 14, 1992 (NLR-N92086), PSE&G described controls on the D vital instrument inverter in response to Generic Letter 91-11.
Although not in the Technical Specifications, operating procedures have been revised to require surveillance testing for the*D inverter, and require issuance of a priority A (immediate action) work order to repair an inoperable D inverter.
Based on our discussions with Mr. J. c. stone (NRR Licensing Project Manager for Salem), NRC's position is that the A priority work order is not an acceptable time limit for D inverter inoperability because it does not require plant shutdown after a specified time period.
By December 1992, PSE&G will issue more restrictive procedural controls via the Technical Specification Interpretation (TSI) process.
The TSI will require the D inverter to be operable in operational modes 1 through 4 (power operation through hot shutdown), and will require plant shutdown if the time limit is exceeded.
The time limit will be addressed in the evaluation TSI, and will initially be no more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
B, or C vital instrument busses, loss of the D bus affect the ability to automatically start and load Diesel Generator.
O(jo1t?'n J
.00 921 io4cfis4 921028
~DR ADOCK 05000272 PDR supporting the Unlike the A, would not an Emergency
./
~-;
e
'-?; i_; - __-*
Document Control Desk NLR-N92155 OCT 2 8 1992 The TSI will remain in effect until an evaluation of the type recommended by the Generic Letter justifies an increase or removal of the time limit, or until the D inverter is included in the Salem Technical Specifications.
Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625
.'I REF: NLR-N92155 STATE OF NEW JERSEY SS.
COUNTY OF SALEM
- s. LaBruna, being duly sworn according to law deposes and says:
I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning the Salem Generating Station, Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.
Subscribed and Sworn to before me this -~g~ day of {l,b-6-vJ 1992
- .. ?frn*~O.~
Notary Public of New Jersey
,,I My Commission expires on KIMBERLY A. HILL NOTARY PUBLIC OF NEW JERSEY My Commission Expires March 9, 1997
',_,----J*---\\