Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations Document Control Desk MAY 1 5 1992 NLR-N92017
- u. s. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
GENERIC LETTER 89-13, SERVICE WATER PROBLEMS AFFECTING SAFETY RELATED EQUIPMENT SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 Public Service Electric and Gas Co. (PSE&G) provided implementation schedules for completion of Generic Letter 89-13 testing in its letter dated January 6, 1990 (NLR-N90021).
Therein we committed to completion of initial testing of Salem Unit No. 2 heat exchangers prior to start-up from the sixth refueling outage.
We have completed all activities as committed with the exception of testing for the 21 and 22 Component Cooling Heat Exchangers.
Due to the early start of the Unit No. 2 refueling outage as a result of the November 9, 1991 Main Turbine failure and Generator fire, we were unable to conduct testing on these components as planned.
Procedures to support testing of these components were under development at the time of the Turbine failure.
The turbine failure required resources to be diverted such that completion of the test procedures could not be accomplished in time to support the available test window.
This testing would normally have been performed shortly after a controlled shutdown of the Unit, thereby assuring adequate heat load is available to provide meaningful test results.
During the present refueling outage, the 21 and 22 CCW heat exchangers were thoroughly-cleaned and inspected.
Initial testing of 21 and 22 CCW heat exchangers. to meet Generic Letter 89-13 recommendations will be completed at the next planned cooldown to Mode 4 following unit re-start.
0
~
>('
Document Control Desk
.. NLR-N92017 2
If there are any questions regarding this matter, please feel free to contact us.
Sincerely, c
Mr. T. T. Martin, Administrator - Region I
- u. s. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J. C. Stone, Licensing Project Manager -
Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T. P. Johnson (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 MAY 15 1992