Requests Application of ASME Section Xi,Code Case N389 to Unit 1 Re Bolting Removal & Exam If Leakage Identified at Bolted Connection During Sys Pressure Test to Permit Alignment of Unit 2 to Same Schedule as Unit 1
ML18096A675
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/24/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLR-N92046, NUDOCS 9205060213
Download: ML18096A675 (2)


Text

  • J Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations N>R 2 4 1992 NLR-N92046 United States Nuclear Regulatory Commission Document Control Desk Washington~ DC 20555 Gentlemen:

ASME CODE SECTION XI REPAIR, REPLACEMENT AND MODIFICATION PROGRAM SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric & Gas Company (PSE&G) hereby submits two requests for use in its Repair, Replacement and Modification Program.

The first request is application of ASME Code Case N389 to Salem Unit No. 1.

The second submittal is a relief request for Salem Unit Nos. 1 and 2 affecting paragraph IWA 5250 (a) (2).

PSE&G requests the application of ASME Section XI Code Case N389 to Salem Unit 1..

Use of this Code Case will permit Salem Unit No. 1 to adopt the 1986 Edition of ASME Code,Section XI for Repairs, Replacements and Modifications.

This will allow alignment with Salem Unit No. 2 which will adopt the 1986 Edition of ASME Code,Section XI upon completion of the sixth refueling outage, currently scheduled to end April 10, 1992.

Code Case N389 which permits the use of later Editions and Addenda of Section XI, either in their entirety or portions thereof, has been incorporated into the 1986 Edition of ASME Code,Section XI.

Regulatory Guide i*.14 7, Revision 8, "Inservice Inspection Code Case Acceptability, ASME Section XI, Div;i.sion 1 11 approves the use of Code Case N389, but requires the licensee to submit for approval, the appropriate edition of the Code that is to be used before the start of the work.

To support implementation of the 1986 ASME Code at the end of the tenth refueling outage for Salem Unit No. 1, currently scheduled to end in mid-June, 1992, your expediency in the consideration of this request would be appreciated.

~-.;,

Ci_Q_["l_i_J) Q

(

9~05060213 92042'4~~~

i

~DR ADOCK 05000272

---_l PDR 1

. (,.

-- Document -control Desk NLR-N92046 2

APR 2 4 1992 Additionally, PSE&G hereby submits a relief request to ASME Code Section XI, Paragraph 5250 (a) (2).

PSE&G requests the use of the referenced paragraph from the ASME Code Section XI, 1989 Edition, 1990 Addenda in lieu of the 1986 wording.

This paragraph provides direction for bolting removal and examination if leakage is identified at a bolted connection during conduct of a system pressure test.

The 1989 Edition of the referenced paragraph states the the bolt closest to the leakage source shall be removed, VT-3 examined and evaluated.

This relief request is being submitted for Salem Unit No. 2 and for Salem Unit No. 1 following approval of ASME Code Case N389.

Should there be any questions with regard to this submittal, please do not hesitate to contact us.

c Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Sincerely, Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625