Public Service Electric and Gas Comp~ny Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1100 Vice President and Chief Nuclear Officer
~.....
APR ~ * "'"'"
NLR-N92055 United States Nuclear Regulat9ry Commission Document Control Desk Washington, DC 20555 Gentlemen:
WRITTEN RESPONSE TO INITIAL SALP REPORT REPORT NOS. 50-272/90-99, 50-311/90-99, 50-354/90-99 SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS. 50-272, 50-311, AND 50-354 The initial systematic appraisal of licensee performance (SALP) report for the Salem and Hope Creek Generating Stations, dated March 25, 1992, requested that we provide written comments, including any correction of factual information, within 20 days following discussions to be conducted at a meeting scheduled for April 15, 1992.
The discussions occurred, as scheduled, during.
the April 15 SALP meeting.
This letter provides the requested written response.
.PSE&G is in agreement with the technical content of the report with only minor exceptions as noted in the attachment to this letter.
As discussed at the April 15 SALP meeting, we have ongoing act'i vi ties and corrective actions in place to *address identified weaknesses.
We,.1,b 1~lieve that these actions are yielding positive results and will continue to bring improved performance.
As we continue to strive for excellence in all areas of plant operations and support, we will closely monitor our progress to ensure that improving trends are established and maintained in all areas.
Should you have any questions or comments 9n this transmittal, do not hesitate to contact us.
Attachment
- ("\\ ('-
f"'-*_.' :-1
\\J l...: v' \\....,:.= ! '<d 9205040311 920429 PDR ADOCK 05000272 G
PDR Sincerely,
Document Control Desk NLR-N92055 2
C Mr. T. T. Martin, Administrator - Region I U. s. Nuclear Regulatory Commisston 475 Allendale Road King of Prussia, PA 19406 Mr. J. C. Stone, Licensing Project Manager -
Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 (,,
Mr. s. Dembek, Licensing Project Manager U. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T. P. Johnson (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 APR Z 9 1~rl
-~
RESRESE 'ID 'lHE INITIAL SAIP REfORI'
'NIR.-N92055
~
NOO. 50-272/9D-99, 50-311/9D-99, 50-354/9Q-99 SAUM AND IDPE U<EEK GENERATING STATIONS rxx::KEl' NOO. 50-272, 50-311, AND 50-354 As noted in the cover letter, PSE&G is in agreement with the technical content of the report with only minor exceptions as noted below:
- 1.
'!he second paragraph on Page 18 of the Salem assessment would be more accurate if the fifth sentence were changed to read as follows:
"A poorly worded emergency action level in the event classification guide, did, *** " Exercise weaknesses involved a specific emei:gency action level in the emergency classification guide (ECG), not the entire EOO.
- 2.
'!he last paragraph on Page 28 of the Salem assessment would be more accurate if the third sentence were changed to read as follows:
"'!he licensee initiated this hideout recovery evolution because of a licensee calculation that *** " '!he referenced calculations were perfonned by the PSE&G Chemistry Services Deparbnent.