ML18096A536

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Rept of Fitness for Duty Performance Data for Period Ending 911231
ML18096A536
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 02/21/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLR-N92020, NUDOCS 9202280042
Download: ML18096A536 (19)


Text

\\

Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations F~B 2 1 1992 NLR-N92020 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Gentlemen:

SEMI-ANNUAL REPORT OF FITNESS FOR DUTY (FFD) PERFORMANCE DATA SALEM AND HOPE CREEK GENERATING STATIONS DOCKET NOS.

50-272, 50-311 AND 50-354 In accordance with the requirements of 10CFR26.71d, Public Service Electric and Gas Company (PSE&G) forwards th~ attached FFD Performance Data Report, for the six month period ending December 31, 1991.

This report includes the following information categories: testing results, random testing program results, confirmed positive tests for specific substances, and a summary of management actions anq telephone reported events per 10CFR26.73.

Should you have any questions concerning this transmittal, please contact us.

Attachment

__r-. r"t. _......

9202280042 920221 PDR ADOCK 05000272 R

PDR Sincerely,

Document Control Desk NLR-N92020 2

C Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J. c. Stone, Licensing Project Manager -

Salem

u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. s. Dembek, Licensing Project Manager U. s. Nuclear Regulatory Commission MS 14 E-21 Washington, DC 20555 Mr. T. P. Johnson (S09)

USNRC Senior Resident Inspector Mr. K. Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 FEB 2 1 1992

'li!lmllililM=@f&--11'Sl!WWt\\!?ii!ill/\\ ------~!lllal*NKl!lllii!ISl:liOA ____

_,_ __ 9_. ___

,Jm"!lll9':.i.. ::!iill!!!'W!!i--lSS!ll--"HHm-1111'.miii<<~-U'V::St:SllmSM-llm!I w:;;a;, -

FITNESS FOR DUTY PROGRAM Perlormance Data Personnel Subject to 10CFR 26 Public ServiGe Electric & Gas Co.

12/31/91 COMPANY 6 MONTHS ENDING Hancock's Bridge. New Jersey 08038 LOCATION Mary Samuels, FFD Administrator 609-339-5600 CONTACT NAME PHONE (INCLUDE AREA CODE)

CUTOFFS: SCREEN/CONFIRMATION (ng/ml) D APPENDIX A TO 10CFR 26 MARIJUANA 50/ 15 AMPHETAMINES 1000

/

500 I

COCAINE 300 ; 150 PHENCYCLIDINE 25 I

25 I

OPIATES 300 ; 300 ALCOHOL (% BAC)

  • 04% BAC I

Includes LONG-TERM SHORT-TERM Contractors CONTRACTOR CONTRACTOR TESTING RESULTS LICENSEE EMPLOYEES PERSONNEL PERSONNEL AVERAGE NUMBER WITH UNESCORTED 3,479 N/A N/A N/A N/A N/A ACCESS REFERRED ACCESS CATEGORIES TESTED POSITIVE TO EAP RESTORED TESTED POSITIVE TESTED POSITIVE PRE-EMPLOYMENT 72 1

~1 L:

0 0

0 0

0 PRE-BADGING 100 1

.1.

0 91 0

1,324 12 PERIODIC N/A N/A NIA N/A N/A N/A N/A N/A FOR CAUSE 4

1 1

0 0

0 2

2 POST ACCIDENT N/A N/A N/A N/A N/A N/A N/A N/A RANDOM 1,271 2

.2 1

285 1

302 2

FOLLOW-UP 19 0

0 0

5 0

1 0

OTHER 0

0 0

0 0

0 0

0 TOTAL 1.466 5

5 1

381 1

1,629 16 7/21/89

Rando1n Testing Program Uesults Individuals Tested*

1989 1990 1991 1992 1993

~

eel I/

I~ I)!

5 i)!s 1/. I/. I/I/

    • ---~v

/

1/

% Positive 0.00 0.58 0.32 0.37

o. 27 Graph of 5

+-

% Positive 4

3 2

1

-1~

I-'

~

IA r

IA l"

¥

\\..,I/

u A

l,... ~ !'\\

- _.__ __ _LJ

~

Confirmed Positive Tests for Specific Substances Marijuana > lOOng/ml 0

12 3

10 1

Cocaine 0

19 9

10 11 Opiates 0

0 0

0 0

Amphetamines 0

3 2

0 0

Phencyclidine 0

1 0

1 0

. -----f----------- ---- *--*--------*-*

Alcohol >

  • 04% BAC 0

9 2

4 4

Marijuana (50-lOOng/ml 0

5 5

5 3

Alcohol <.04% BAC 0

1 4

6 4


r----***--* ----*--*-* --- *-

~------------'------'------ '--------'---- _, ____

SUMMARY

OF MANAGEMENT ACTIONS

1.

None taken during this period.

SUMMARY

OF EVENTS REPORTED BY TELEPHONE

1.

None reported during this period.

1/17/92 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD:

07/01/91 THRU 12/31/91


PERMANENT EMPLOYEES------


SHORT-TERM CONTRACTORS----

SCH ED TEST POS % TEST

% POS SCH ED TEST POS % TEST

% POS 72 72 100.00

1. 38 0

0 0

0.00 0.00 100 100 1 100.00 1.00 1325 1324 12 99.92 0.90 0

0 0

0.00 0.00 0

0 0

0.00 0.00 4

4 1 100.00 25.00 2

2 2 100.00 100.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 2250 1271 2

56.48

0. 15 782 302 2

38.61 0.66 25 19 0

76.00 0.00 3

0 33.33 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 2451 1466 5

59.81 0.34 2112 1629 16

77. 13 0.98 PAGE

LONG-TERM CONTRACTORS-----

SCH ED TEST POS % TEST

% POS 0

0 0

0.00 0.00 91 91 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 579 2B5 49.22 0.35 6

5 0

83.33 0.00 0

0 0

0.00 0.00 676 381 56.36 0.26

1/17/92 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST

SUMMARY

BY SUBSTANCE FOR PERIOD:

07/01/91 THRU 12/31/91 SUBSTANCE OCCURANCES ALCOHOL: BAC

~.04 4

COCAINE 11 MARIJUANA 50-100 NG 3

ALCOHOL: BAC >.04

4.

MARIJUANA >100 NG

      • TOTAL ***

23 PAGE

1~17 /92 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD:

07/01/91 THRU 07/31/91


PERMANENT EMPLOYEES------


SHORT-TERM CONTRACTORS----

SCH ED TEST POS % TEST

% POS SCHED TEST POS % TEST

% POS 8

8 0 100.00 0.00 0

0 0

0.00 0.00 18 18 0 100.00 0.00 63 63 2 100.00

3. 17 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 319 219 0

68.65 0.00 77 36 0

46.75 0.00 8

5 0

62.50 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 354 251 0

70.90 0.00 140 99 2

70.71 2.02 PAGE


LONG-TERM CONTRACTORS-----

SCH ED TEST POS % TEST

% POS 0

0 0

0.00 0.00 9

9 0 100.00 0.00 0

0 0

0.00 0.00 e

0 0

0 0.00 0.00 0

0 0

0.00 0.00 89 47 0

52.80 0.00 0 100.00 0.00 0

0 0

0.00 0.00 99 57 0

57.57 0.00

i,-,7 /92 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST

SUMMARY

BY SUBSTANCE FOR PERIOD:

07/01/91 THRU 07/31/91 SUBSTANCE OCCURANCES ALCOHOL: BAC <.04 COCAINE

      • TOTAL ***

2 PAGE

  • 1/17/92 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD:

08/01/91 THRU 08/31/91


PERMANENT EMPLOYEES------


SHORT-TERM CONTRACTORS----

SCH ED TEST POS % TEST

% POS SCH ED TEST POS % TEST

% POS 11 11 0 100.00 0.00 0

0 0

0.00 0.00 18 18 0 100.00 0.00 76 76 2 100.00 2.63 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 356 220 0

61. 79 0.00 107 43 0
40. 18 0.00 2

2 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 387 251 0

64.85 0.00 183 119 2

65.02 1.68 PAGE


LONG-TERM CONTRACTORS-----

SCH ED TEST POS % TEST

% POS 0

0 0

0.00 0.00 2

2 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 92 43 0

46.73 0.00 0 100.00 0.00 0

0 0

0.00 0.00 95 46 0

48.42 0.00

.~ ~

1/17/92 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST

SUMMARY

BY SUBSTANCE FOR PERIOD:

08/01/91 THRU 08/31/91 SUBSTANCE OCCURANCES COCAINE 2

      • TOTAL ***

2 PAGE

~1/l~/92 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD:

09/01/91 THRU 09/30/91


PERMANENT EMPLOYEES------


SHORT-TERM CONTRACTORS----

SCH ED TEST POS % TEST

% POS SCHED TEST POS % TEST

% POS 0 100.00 0.00 0

0 0

0.00 0.00 12 12 0 100.00 0.00 75 75 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 551 200 0

36.29 0.00 188 37 0

19.68 0.00 6

4 0

66.66 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 571 218 0

38. 17 0.00 263 112 0

42.58 0.00 PAGE


LONG-TERM CONTRACTORS-----

SCH ED TEST POS % TEST

% POS 0

0 0

0.00 0.00 11 11 0 100.00 0.00 0

0 0

0.00 0.00 e

0 0

0 0.00 0.00 0

0 0

0.00 0.00 134 42

31. 34 2.38 0 100.00 0.00 0

0 0

0.00 0.00 146 54 36.98 1.85

,.*1rtv192 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST

SUMMARY

BY SUBSTANCE FOR PERIOD:

09/01/91 THRU 09/30/91 SUBSTANCE OCCURANCES ALCOHOL: BAC <.04

      • TOTAL ***

PAGE

CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD:

10/01/91 THRU 10/31/91


PERMANENT EMPLOYEES------


SHORT-TERM CONTRACTORS----

SCH ED TEST POS % TEST

% POS SCH ED TEST POS % TEST

% POS 6

6 0 100.00 0.00 0

0 0

0.00 0.00 17 17 0 100.00 0.00 99 99 100.00

1. 01 0

0 0

0.00 0.00 0

0 0

0.00 0.00 100.00 100.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 381 226 59.31 0.44 91 36 0

39.56 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 405 250 2

61.72 0.80 190 135

71. 05 0.74 PAGE

LONG-TERM CONTRACTORS-----

SCH ED TEST POS % TEST

% POS 0

0 0

0.00 0.00 17 17 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

  • O. DO 0.00 0

0 0

0.00 0.00 86 51 0

59.30 0.00 0 100.00 0.00 0

0 0

0.00 0.00 104 69 0

66.34 0.00

---1I1 ?..[92 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST

SUMMARY

BY SUBSTANCE FOR PERIOD:

10/01/91 THRU 10/31/91 SUBSTANCE OCCURANCES COCAINE 2

ALCOHOL: BAC <.04

      • TOTAL ***

3 PAGE

1/17/92 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDIC~L FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD:

11/01/91 THRU 11/30/91


PERMANENT EMPLOYEES------


SHORT-TERM CONTRACTORS----

SCH ED TEST POS % TEST

% POS SCH ED TEST POS % TEST

% POS 32 32 1 100.00

3. 12 0

0 0

0.00 0.00 21 21 0 100.00 0.00 468 468 4 100.00 0.85 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 2

2 2 100.00 100.00 0

'O 0

0.00 0.00 0

0 0

0.00 0.00 303 197 65.01 0.50 111 52 46.84 1.92 3

3 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 359 253 2

70.47 0.79 581 522 7

89.84 1.34 PAGE


LONG-TERM CONTRACTORS-----

SCH ED TEST POS % TEST

% POS 0

0 0

0.00 0.00 29 29 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 77 48 0

62.33 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 106 77 0

72.64 0.00

1/17/92 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST

SUMMARY

BY SUBSTANCE FOR PERIOD:

11/01/91 THRU 11/30/91 SUBSTANCE OCCURANCES MARIJUANA 50-100 NG 3

COCAINE 3

ALCOHOL: BAC >.04 2

ALCOHOL: SAC <.04 MARIJUANA >100 NG

      • TOTAL ***

10 PAGE

1 /17 /92 CTGRY PRE-EMPLOYMENT PRE-BADGING PERIODIC FOR CAUSE POST ACCIDENT RANDOM FOLLOW-UP OTHER TOTAL PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT FOR PERIOD:

12/01/91 THRU 12/31/91


PERMANENT EMPLOYEES------


SHORT-TERM CONTRACTORS----

SCH ED TEST POS % TEST

% POS SCH ED TEST POS % TEST

% POS 14 14 0 100.00 0.00 0

0 0

0.00 0.00 14 14 100.00

7. 14 544 543 3

99.B1 0.55 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 341 210 0

61. 58 0.00 207 97 46.85
1. 03 6

5 0

83.33 0.00 3

0 33.33 0.00 0

0 0

0.00 0.00 0

0 0

0.00 0.00 376 244 64.89 0.40 754 641 4

85.01 0.62 PAGE


LONG-TERM CONTRACTORS-----

SCH ED TEST POS % TEST

% POS 0

0 0

0.00 0.00 23 23 0 100.00 0.00 0

0 0

0.00 0.00 0

0 0

0. 00.

0.00 0

0 0

0.00 0.00 101 54 0

53.46 0.00 2

0 50.00 0.00 0

0 0

0.00 0.00 126 78 0

61.90 0.00

1/17/92 PUBLIC SERVICE ELECTRIC & GAS COMPANY NUCLEAR DEPARTMENT I MEDICAL FITNESS-FOR-DUTY STATISTICS REPORT POSITIVE TEST

SUMMARY

BY SUBSTANCE FOR PERIOD:

12/01/91 THRU 12/31/91 SUBSTANCE OCCURANCES COCAINE 3

ALCOHOL: SAC >.04 2

      • TOTAL ***

5 PAGE