Docket Nos. 50-272
50-311
50-354
. Mr. Steven E. Miltenberger
Vice President and Chief Nuclear Officer
Public Service Electric and Gas Company
P. 0. Box 236
Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
Subject: Inspection Report Nos. 50-272/91-30, 50-311/91-30 and 50-354/91-23
This letter transmits the report of an announced inspection conducted by Mr. C. H~ Woodard
and other NRC personnel from December 2 to December i3, 1991, at the Salem Units 1 and*
2 and Hope Creek Generating Stations in Hancocks Bridge, New Jersey. Mr. Woodard
discussed the findings of the inspection with senior members of your staff during the exit
meeting at the generating stations on December 13, 1991.
The purpose of this inspection was to assess the adequacy of engineering and technical
support provided for the operation of the Salem and Hope Creek plants. These activities are
important to assure the health and safety of the public. This inspection included a review of
corporate commitments to engineering,* the engineering organization and staffing, training,
self assessments, and engineering performance.
The inspection revealed* a strong corporate commitment to quality engineering; a well staffed,
trained, stable engineering organization; adequate engineering procedures that were properly
implemented; and good coordination between the operations and engineering organizations.
The engineering organization was found to be responsive to operations needs.
Three non-cited violations were identified by your staff which will not be subject to
enforcement action because of your efforts in identifying and correcting the violations, and
because the other criteria set forth in Section V. G. of 04r Enforcement Policy were met. *
Similarly, a fourth violation identified by the NRC will not be subject to enforcement
because the violation was classified* as a Severity Level V, was isolated, and corrective
actions were taken promptly.
9202280040 920214
ADOCK 05000272
G
FEB 14 1992
Mr. Steven E. Miltenberger
2
Our overall conclusion was that engineering and* technical support provided to. the Salem and
Hope Creek plants is adequate to support plant operations is good.
Your cooperation with us in this matter is appreciated.
Sincerely,
~%GINAL SIGNED !3Y
-
YNE D. LAi\\INiI*..;G
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure: NRC Inspection Report Nos. 50-272/91-30; 50-311/91-30 and 50-354/91-23.
cc w/encl:
S. LaBruna, Vice President, Nuclear Operations
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.*
C. Vondra, General Manager - Salem Operations
F. Thomson, Manager, Licensing and Regulation
L. Reiter, General Manager - Nuclear Safety Review
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator
R. Fryling, Jr., Esquire
M. Wetterhahn, Esquire
J. Isabella, Director, Generation Projects Department,
Atlantic Electric Company
D. Wersan, Assistant Consumer Advocate, Office of Consumer Advocate
Lower* Alloways Creek Township
Scott B. Ungerer, Manager, Joint Generation Projects Department,
Atlantic Electric Company
J. J. Hagan, General Manager - Hope Creek Operations
J. Lipoti, State of New Jersey
K. Abraham, PAO (2) All Inspection Reports
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
OFFICIAL RECORD COPY
C:SALHC.CW
FEB 14 1992
Mr. Steven E. Miltenberger
3
bee w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
R. Blough, DRP
l White, DRP
B. Norris, DRP
J. Stone, NRR
R. Lobel, EDO
s. Dembek, NRR
RI:DRS
Woodard
C!jfW
2/3/92
ru:.£s<-
. Cheung
2!}192
cla
ru!nRs
Anderson
21'f 192
OFFICIAL RECORD COPY
C:SALHC.CW
RI:D~
Durr