. If Public Service Electric and Gas Company Thomas M*. cr*immins, Jr...
Pub!!c Service Electric and Gas Company P.O. Box 236.
- Hancocks Bridge, NJ 08038 609-339-4700
.,,.;.<-.J G 8 1991.
NLR-N90241
- united states Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
NRC BULLETIN 88-11
~RESSURIZER SURGE LINE THERMAL STRATIFICATION SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric & Gas Company (PSE&G) hereby submits a change in schedule for responding to NRC Bulletin 88-11, Pressurizer Surge Line Thermal s~ratification.
In order to complete the required analysis, PSE&G is committing to a new submittal date of May 15, 1991.
This delay has been necessitated to complete Westinghouse Owners Group (WOG) and plant specific activities.
These activities are detailed below.
In order to address the issue of surge line thermal stratification and respond to NRC Bulletin 88-11, the WOG implemented a p*rogram to generically evaluate the effects of stratification on surge line integrity.
This bounding evaluation compares WOG plants to those for which a specific analysis had been performed.
Since this evaluation provided less than full design life verification, a Justification for Continued Operation (JCO) was developed for-use by each of the WOG plants.
This JCO was* reviewed and accepted by the NRC.
Subsequent to the bounding evaluation and generic JCO, the WOG performed a generic detailed analysis on groupings of plants based on their similarity of response to thermal stratification.
The results of this generic detailed analysis demonstrated that.the original JCO basis was still valid for Salem Units 1 and 2.
This report was reviewed by the NRC and accepted for reference by WOG plants in a review conducted by the NRC.
9101140178 910108 PDR ADOCK 05000272 Q
- r
' i
- 1
- Document Control Desk NLR-:-N90241 2
- 'I 0 3 1991 PSE&G has initiated a program to complete the plant spe-cific
- evaluation on the surge line for design life *. The WOGdetailed analysis was completed in July and the NRC review.occurred in
- November 1990.
Although the plant specific program was initiated prior to November 1990, completion could not be planned until NRC feedback on the detailed analysis was obtained.
As discussed with the NRC at the November review~ a delay in the schedule to allow for completion of on-going work, review by appropriate parties, preparation of transmittal 'and submittal of reports, a.
change in schedule is needed. As stated above, we re.quest a date of May 15, 1991.
Westinghouse is schedule to complete its analysis March 30, 1991.
The additional six weeks will allow sufficient time for PSE&G to review and approve the analysis.
Should there be any questions with regard.to this.submittal, please do not hesitate to contact us.
c
/\\
/
Sinf2e.1y,
. Q
(
/
v
\\._r w~)(,,1 ~
r-
~
Mr.* J. C. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector
.Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department_ of.Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625