ML18095A469

From kanterella
Jump to navigation Jump to search
Rev 1 to Notification of Significant Licensee Meetings 90-89 & 90-88/SALP Board Meetings on 900919 & 20,respectively,in King of Prussia,Pa
ML18095A469
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 08/23/1990
From: Swetland P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9009140242
Download: ML18095A469 (2)


Text

{{#Wiki_filter:*,.* Licensee: Facility: Docket No: Time and Date: Location:

Purpose:

NRC Attendees: AUG 2 3 1990 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Public Service Electric and Gas Company Salem Units 1 and 2 and Hope Creek 50-272; 50-311; 50-354 Nos. (See Below) REVISION 1 9:00 a.m., September 19, 1990 - Hope Creek - (90-89) 9:00 a.m., September 20, 1990 - Salem Units 1&2 - (90-88) DRP Conference Room, Reg~on I King of Prussia, PA Systematic Assessment of Licensee Performance (SALP) Board Meeting C. Hehl, Director, Division of Reactor Projects (DRP), Chairman M. Knapp, Director, Division of Radiation Safety and Safeguards (DRSS) J. Durr, Chief, Engineering Branch, Division of Reactor Safety (DRS) R. Gallo, Chief, Operations Branch, DRS R. Bellamy, Chief, Facilities Radiological Safety and Safeguards Branch, DRSS A. Blough, Chief, Projects Branch No. 2, DRP P. Swetland, Chief, Reactor Projects Section 2A, DRP W. Butler, Director, Project Directorate I-2, NRR J. Stone, Licensing Project Manager, PD I-2, NRR C. Shiraki, Licensing Project Manager, PD I-2, NRR T. Johnson, Senior Resident Inspector S. Pindale, Resident Inspector S. Barr, Resident Inspector K. Lathrop, Resident Inspector G. Tracy, Reactor Engineer, RPS 2A, DRP Note: SALP Board meetings are for NRC personnel only. Attendance at this meeting should be made known by September 10, 1990 via telephone call to P. D. Swetland, Region I, at FTS 8-346-5114 or Commercial 215-337-5114. A SALP Management meeting with the licensee will be held at a later date and will be open to the public. Prepared by: [ ORIGINAL SIGNED BY: Paul D. Swetland, Chief, RPS 2B 9009140242 6gg~g72 PDR ADOCK PNU \\ OFiICIAL BECOBll CorY 1 p

l, ./j'. _, AUG 2 31990 Distribution: J. M. Taylor, Executive Director for Operations J. H. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR) H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS) B.. K. Grimes, Acting Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation W. T. Russell, Associate Director for Inspection and Technical Assessment, NRR B. Boger, Assistant Dire~tor for Region I Reactors, NRR S. Varga, Director, Division of Reactor Projects - I/II, NRR J. Caldwell, Regional Coordinator, EDO W. -Butler, Director, Project Directorate I-2, NRR J. Stone, Project Manager, PD I-2, NRR C. Y. Shiraki, Project Manager, PD I-2, NRR W. Bateman, Chief, PQEB Section A, NRR N. Green, Jr:, Policy Development & Technical Support Branch Public Document Rbom (PDR) Local Public Document Room (LPDR) State of New Jersey bee: Regional Administrator Deputy Regional Ad~inistrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer (2 copies) M. Miller, RI Region I Receptionist DRMA Fil es DRP Files Bulletin Board M. J. DiDonato, DRP R~~A~ -{Ji~y/meo 8/23/90 \\! RI:DRP I OFFICIAL liECOllD COl'Y I}}