ML18095A263
| ML18095A263 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 04/30/1990 |
| From: | Orticelle A Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18095A262 | List: |
| References | |
| NUDOCS 9006110382 | |
| Download: ML18095A263 (1) | |
Text
"... <
, __ _.~,
CORRECTED OPERATING DATA REPORT Docket No:
Date:
Completed by:
Art Orticelle Telephone:
50-311 05-10-90 609-339-2122 Operating Status
- 1.
Unit Name Salem No. 2 Notes
- 2.
Reporting Period APRIL, 1990
- 3.
Licensed Thermal Power (MWt) 3411
- 4.
Nameplate Rating (Gross MWe) 1170
- 5.
Design Electrical Rating (Net MWe) 1115
- 6.
Maximum Dependable Capacity(Gross MWe) 1149
- 7.
Maximum Dependable Capacity (Net MWe) 1106
- 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
- 9.
Power Level to Which Restricted, if any (Net MWe)
N/A
- 10. Reasons for Restrictions, if any N/A
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor was Critical
- 13. Reactor Reserve Shutdown Hrs.
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Elec. Energy Generated (MWH).
- 18. Net Elec. Energy Generated (MWH)
- 19. Unit Service Factor
- 20. unit Availability Factor
- 21. Unit Capacity Factor (using MDC Net)
- 22. Unit Capacity Factor (using DER Net)
- 23. Unit Forced Outage Rate This Month 719 0
0 0
0 0
0
-2923 0
0 0
0 0
Year to Date 2879 1993.8 0
1974.1 0
6555801.6 2237880 2142906 68.6 68.6 67.3 66.8 7.6 Cumulative 74928 47999.7 0
46519.3 0
95607541.0 48284932 45942812 62.1 62.1 55.4 55.0 25.4
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
None
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
Estimated date for Unit 2 start-up is May 24. 1990.
8-l-7.R2 9006110382 900601 PDR ADOCK 05000311 R