ML18095A263

From kanterella
Jump to navigation Jump to search
Corrected Operating Data Rept for Apr 1990 Monthly Operating Rept
ML18095A263
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/30/1990
From: Orticelle A
Public Service Enterprise Group
To:
Shared Package
ML18095A262 List:
References
NUDOCS 9006110382
Download: ML18095A263 (1)


Text

"... <

, __ _.~,

CORRECTED OPERATING DATA REPORT Docket No:

Date:

Completed by:

Art Orticelle Telephone:

50-311 05-10-90 609-339-2122 Operating Status

1.

Unit Name Salem No. 2 Notes

2.

Reporting Period APRIL, 1990

3.

Licensed Thermal Power (MWt) 3411

4.

Nameplate Rating (Gross MWe) 1170

5.

Design Electrical Rating (Net MWe) 1115

6.

Maximum Dependable Capacity(Gross MWe) 1149

7.

Maximum Dependable Capacity (Net MWe) 1106

8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A

9.

Power Level to Which Restricted, if any (Net MWe)

N/A

10. Reasons for Restrictions, if any N/A
11. Hours in Reporting Period
12. No. of Hrs. Reactor was Critical
13. Reactor Reserve Shutdown Hrs.
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Elec. Energy Generated (MWH).
18. Net Elec. Energy Generated (MWH)
19. Unit Service Factor
20. unit Availability Factor
21. Unit Capacity Factor (using MDC Net)
22. Unit Capacity Factor (using DER Net)
23. Unit Forced Outage Rate This Month 719 0

0 0

0 0

0

-2923 0

0 0

0 0

Year to Date 2879 1993.8 0

1974.1 0

6555801.6 2237880 2142906 68.6 68.6 67.3 66.8 7.6 Cumulative 74928 47999.7 0

46519.3 0

95607541.0 48284932 45942812 62.1 62.1 55.4 55.0 25.4

24. Shutdowns scheduled over next 6 months (type, date and duration of each)

None

25. If shutdown at end of Report Period, Estimated Date of Startup:

Estimated date for Unit 2 start-up is May 24. 1990.

8-l-7.R2 9006110382 900601 PDR ADOCK 05000311 R

PDC