Text
e PS~G Public Service Electric and Gas Company P.0. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 May 17, 1989 TECHNICAL SPECIFICATION SURVEILLANCE NOTIFICATION REQUIREMENT 4.4.5.5.a On May 6, 1989, Steam Generator {S/G} tube plugging was completed.
All Row 1 tubes in all four S/Gs were plugged due to indications of tangential cracking in a few of the Row 1 tubes.
The Row 1 inspection was performed as per a commitment made in Unit 2 LER 311/88-019-00.
In addition to the Row 1 tube plugging, 10 tubes were plugged due to imperfection depths greater than or equal to 40% and 19 tubes were plugged due to imperfection depths between 30 and 40%.
Attached is a list of the plugged tube locations completed this outage, not including the Row 1 tubes, for each S/G.
This notification is being made, within fifteen days after tube plugging, as required by Technical Specification Surveillance 4.4.5.5.a.
MJP:pc The Energy People Sincerely yours,
/fJi::d.,
L. K. Miller General Manager -
Salem Operations 95-2189 (11 M) 12-84
ATTACHMENT Steam Generator Tubes Plugged 3th Refueling Outage S/G Row/Column
% Depth SIG Row/Column
% Depth 11 28/16 80 13 30/14 40 44/62 30 -
40 36/56 30*- 40 33/78 30 -
40 30/83 30 -
40 20/89 30 -
40 12 43/30 49 14 19/5 30 --40 27/61 30 -
40 25/10 30 -
40 32/33 30 -
40 30/15 30 -
40 39/49 30 -
40 31/15 30 -
40 29/28 30 -
40 45/50 30 -
40 37/54 30 -
40 43/58 30 -
40 43/61 30 -
40 39/70 30 -
40 39/71 30 -
40 29/11 40 18/12 41 34/16 41 34/17 41 37/20 40 34/57 57 39/71 40