Forwards Response to Bulletin 88-004,consisting of Results of Ongoing Reviews by Ingersoll-Rand & Pacific Pumps Re Plant RHR & Safety Injection Pumps.Operating Procedures Re Initiating RHR & mid-loop Operation Will Be Revised
ML18094A343
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/11/1989
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-004, IEB-88-4, NLR-N89065, NUDOCS 8904190490
Download: ML18094A343 (3)


Text

e e

Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 Vice President - Nuclear Operations April 11, 1989 NLR-N89065 United states Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

FOLLOW-UP RESPONSE TO BULLETIN 88-04 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Public Service Electric and Gas Company (PSE&G) has received the results of the "ongoing" reviews by Ingersoll-Rand and Pacific Pumps relating to the Salem Residual Heat Removal (RHR) and Safety Injection (SI) pumps.

The results of these reviews and the actions taken by PSE&G are provided in the attachment.

Should you have any questions with regard to this transmittal, please do nQt hesitate to contact us.

c Mr. J. c. Stone Licensing Project Manager Ms. K. Halvey Gibson Senior Resident Inspector Sincerely, Mr. Wo T. Russell, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality.

Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 A904190490 8904ll -

~-

Ar,cK 05000272 PDR i..I*- -* "

F*D*C Q

REF: PSE&G Letter Number NLR-~89065 STATE OF NEW JERSEY COUNTY OF SALEM

)

)

SS.

)

Stanley LaBruna, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated, April 11, 1989

, concerning the Salem Generating Stations, Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.

My Commission expires 7

' 1989.

Jersey LAflAli~C: Y. bi:A:~i..'

Notary Public of New Jers.:;:,*

My Commission Expires May 1, 1'1'91

  • ,'. *.. ~*.

~..-.... '

ATTACHMENT FOLLOW-UP RESPONSE TO BULLETIN 88-04 SALEM GENERATING STATION DOCKET NOS. 50-272 AND 50-311 The recirculation flow rates for the RHR and SI pumps have been reviewed by the respective manufacturers.

Ingersoll-Rand has provided direction for both short and long term operation of the RHR pumps.

Recirculation flows as low as 450 to 500 gpm are acceptable; however, a maximum time limitation of three, (3) hours in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period should be established.

The minimum required flow for continued RHR operation exceeding 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> is 2000 gpm.

Operating procedures II-6.3.2 "Initiating Residual Heat Removal" and II-1.3.6 "Mid-loop Operation" shall be revised to include direction to maintain a minimum of 2000 gpm flow for continued RHR operation.

The emergency, abnormal and normal operating procedure will include a caution to avoid placing the RHR pumps on recirculation for more than three (3) hours in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period.

RHR pump operation shall be logged to provide data for an operational history review.

This shall include starts, stops*,

time on recirculation and continuous flow conditions.

This information will be used to establish a practical service limit and inspection frequency.

Pacific Pumps review of the recirculation requirements for the Safety Injection pumps confirmed that the original specified flow rates are acceptable.

The results of these reviews support the original Bulletin 88-04 response that justified the continued operation of Salem Generating Station.

Therefore, the procedural changes and the data/history review are the only additional changes that will be performed outside of the original response.

  • ~

. ~*.. :

........'. *..~ :.... *'

  • ~.. *...
    • * :