OPERATING DATA REPORT Completed by Pell White

_9perating Status

1.

Unit Name Salem No. 2

2.

Reporting Period December 1988

3.

Licensed Thermal Power (MWt) 3411

4.

Nameplate Rating (Gross MWe)

IT70

5.

Design Electrical Rating (Net MWe) 1115

6.

Maximum Dependable Capacity(Gross MWe)1149

7.

Maximum Dependable Capacity (Net MWe) 1106

8.

If Changes Occur in Capacity Ratings (items Report, Give Reason Docket No.

Date Telephone Extension Notes 3 through CORRECTED COPY 50-311 1-10-89 935-6000 4451

7) since Last N/A
9.

Power Level to Which Restricted, if any (Net MWe)

N/A

10. Reasons for Restrictions, if any N/A
11. Hours in Reporting Period
12. No. of Hrs. Reactor was Critical
13. Reactor Reserve Shutdown Hrs.
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Elec. Energy Generated (MWH)
18. Net Elec. Energy Generated (MWH)
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (using MDC Net)
22. Unit Capacity Factor (using DER Net)
23. Unit Forced Outage Rate This Month 744 213. 3 0

207.1

--r--

539083 169810 155508 27.8 27.8 18.9 Year to Date 8784 5992.9 0

58 40. 8 0

19014576 6254830 5955927 66.5 66.5

61. 3 Cumulative 63289 38355.8 0

37122.6 0

64665097 37884300 35975305 58.7 58.7

51. 4 18.7 60.8 50.9 71.9 12.1 28.6
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup: