Responds to NRC Bulletin 88-010 Re Potentially Nonconforming Molded Case Circuit Breakers.Encl Table Represents Preliminary List of Circuit Breakers Determined Not to Be Traceable to Circuit Breaker Mfg
ML18094A311
Person / Time
Site: Salem, Hope Creek, 05000000
Issue date: 04/03/1989
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-010, IEB-88-10, NLR-N89061, NUDOCS 8904110193
Download: ML18094A311 (4)


Text

,. ~*

  • .i Public Service Electric and Gas Company Stanley LaBru,na Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 NLR-N89061 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

RESPONSE TO NRC BULLETIN 88-10 SALEM GENERATING STATION UNIT NOS. 1 AND 2 HOPE CREEK GENERATING S~ATION DOCKET NOS. 50-272, 50-311, AND 50-354


Public*- service Electric--and-Gas=-company-(PSE.&G) _has -receivea--:J:he :---~- ~---

subject NRC Bulletin regarding potentially nonconforming molded-case circuit breakers. Reporting Requirement 1 of the bulletin requested operating licensees to submit a report outlining the progress achieved in responding to the bulletin Action Items.

In accordance with Action Item 1 of the bulletin, PSE&G has identified a total of 474 molded case circuit breakers in storage*

which were or may have been designated for use in safety-related applications. To date, 201 qf these circuit breakers have been traced to the circuit breaker manufacturer (CBM). The remaining circuit breakers have been tagged so that they may not be used in safety-related applications while the investigation into their traceability continues. The attached table presents a

  • preliminary list of those circuit breakers which have been determined not to be traceable to the CBM. The circuit breakers listed on this table represent those for which preliminary information received from the vendor has not enabled traceability to be determined. Inclusion in this table does not preclude a future possibility of traceability determination via subsequent vendor-supplied information.

The traceability investigations with regard to the remaining 248 circuit breakers are ongoing. Inquiries have been sent to associated vendors and PSE&G is awaiting their responses. PSE&G expects the information to be received and the traceability reviews to be completed by June 1, 1989. A complete information summary for those circuit breakers that could not be traced to the CBM will be supplied at that time.

In accordance with Action Item 3 of the bulletin, testing of those circuit breakers identified in the attached table will commence shortly. Test procedures have been completed and a test facility readied for circuit breaker testing in accordance with 8904110193 ~§868~72 PDR ADOCK PDC Q

Document Control Desk 2 NLR-N89061 NRC Bulletin 88-10, Attachment 1. Trial tests have indicated that the use of the test rig will enable a determination of compliance with the Bulletin test program requirements. Other circuit breakers which are later determined not to be traceable to the CBM will be scheduled for testing at that time.

Since the traceability determinations have yet to be completed and testing has yet to commence, PSE&G will not make a commitment to perform the five-year review identified in Action Item 4 of the bulletin at this time. The need to perform this review will be assessed upon completion of the traceability review and evaluation of the testing program results. Action Item 5 will be addressed if a commitment is made to implement Action Item 4.

In accordance with Action Item 6 of the bulletin, PSE&G will maintain the_ inLo_nnation genera1:,e_d__ in response to this bulletin for a period--of--5-years after completion of-the-requested~---~:_

actions.

If you have any questions with regard to this transmittal please do not hesitate to contact us.

Attachment c Mr. J. c. Stone, Licensing Project Manager - Salem Ms. K. Halvey Gibson, Senior Resident Inspector - Salem Mr. c. Y. Shiraki, Licensing Project Manager - Hope Creek Mr. G. w. Meyer, Senior Resident Inspector - Hope Creek Mr. w. T. Russell, Administrator Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625

REF: RESPONSE TO NRC BULLETIN 88-10 STATE OF NEW JERSEY )

) SS.

COUNTY OF SALEM )

Stanely LaBruna, being duly sworn according to law deposes and says:

__:_I am Vic~ Pres_l,_de_nt - Nuclear Operations of- Public Service


~- -

Electric and Gas Company, and as such, I find the matters set forth in our letter dated April 3, 1989 , concerning the Salem Unit Nos. 1 and 2 and Hope Creek Generating Stations, are true to the best of my knowledge, information and belief.

Subscrib~nd Sworn to before me this 3 day of ~~ff-~~~~' 1989 L

Notary PJ'blic of New Jersey LARAIME Y. Bi:ARD Notary Public of New Jersey My Commission Expires May 1, 1991 My Commission expires on

tl>LDED-CASE CIRDJlT BREAKERS NOT TRACEABLE TO CIRDJlT BREAKER MAllJFACTURER AS OF APRIL 1, 1989

    • e NlCHASE

~ QUANTITY MANUFACTURER I i MOOEL # ~ STATION  !!!f!

~IROJIT BREAKER DATA m.ll fQill 938177 2 GE TJB422Y400 ARROW ELECTRONICS HC 400 250AC 2 938177 5 GE TllQC2120WL ARROW ELECTRONICS HC 20 240AC 2 938177 GE TJ36Ftl> ARROW ELECTRONICS "HC 600 240AC 3 938177 GE THED136080 ARROW ELECTRONICS HC 80 600AC 3 938177 GE THJ426400WL ARROW ELECTRONICS HC 400 250 DC,600 AC 2 P1-164858 HEINEMANN I AM13-A GA TECHNOLOGIES HC 5 250 P1-194454 ITE

  • E21B015 CVI INC. HC 15 125 DC,120 AC 756344 1 GE . TEB122030 PCM:LL APPARATUS SVC. SALEM., 30 250 DC,240 AC 2 845110 2 GE TEB122030 PCM:LL APPARATUS SVC. SALEM 30 250 DC,240 AC 2 837048 2 GE TFKZ36FOOO fR(Jlil ELECTRIC SALEM 225 600 AC 3 575983 2 HEINEMANN AM2-B3-A HEINEMANN SALEM 1.5 65 DC 2

\-

729839 575983 912221 3

2 HEINEMANN HEINEMANN HEINEMANN i AM2-B3-A I AM2-B3

. AM33 HEINEMANN HEINEMANN BALLW SALE~

SALEM SALEM 0.5 7.5 2 50 DC 65 DC 50 2

2 2

i I

I i I

'