Forwards Lead Project Manager Summary Re Multiplant Actions MPA B-91,MPA B-92 & MPA B-93 Concerning Salem Atws,Per 871030 Request.Closure of MPA B-91 Recommended.Mpa B-92 & MPA B-93 Almost Complete
ML18093B557
Person / Time
Issue date: 01/20/1988
From: Adensam E, Lasher D, Mozafari B, Newberry S
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
GL-83-28, TAC-53952, TAC-53953, TAC-53954, TAC-53955, TAC-53956, TAC-53957, TAC-53958, TAC-53959, TAC-54043, TAC-54044, TAC-54045, TAC-54046, TAC-54047, TAC-54048, TAC-54049, NUDOCS 8801260143
Download: ML18093B557 (9)


Text

"

_l.

January 20, 1988 C'

MEMORANDUM FOR:

Steven A. Varga, Director DISTRIBUTION Division of Reactor Projects I/II

'.Docket file

Elinor Adensam, Director PD21 r/f PAnderson JSneizek SICB

SUBJECT:

Project Directorate -

11~1 JThoma Division of Reactor Projects I/II SVarga EAdensam Scott Newberry, Chief BMozafari Instrument and Control Systems Branch Division of Engineering and System Technology MPA B-91 (SALEM AHJS ITEM 4.4) REACTOR TRIP SYSTEM RELIABILITY (IMPROVEMENTS IN MAINTENANCE AND TEST PROCEDURES FOR B&W PLANTS)

MPA B-92 (SALEM ATWS ITEM 4.5.1) REACTOR TRIP SYSTEM RELIABILITY (SYSTEM FUNCTIONAL TESTING) - DIVERSE TRIP FEATURES MPA B-93 (SALEM ATWS ITEMS 4.5.2 and 4.5.3) REACTOR TRIP SYSTEM RELIABILITY (SYSTEM FUNCTIONAL TESTING) - TEST ALTERNATIVES In response to the memo dated October 30, 1987 (T. Murley to F. Miraglia and R. Starostecki), the following items are being provided:

1. is the pen and ink corrected copy of the Lead PM Summary.

Salem ATWS Items 4.4, 4.5.1, 4.5.2, and 4.5.3, were initiated via Generic Letter 83-28, issued July 8, 1983, and were applicable to all operating plants, applicants for operating licenses, and plants with construction permits.

In regard to MPAs B-91 and B-93, the indicated corrections reflect input from the lead reviewer's tracking system that includes data from all concerned facilities.

However, all facilities are not represented in the SIMS database listing. For the most part, those not included are plants which do not yet have operating licenses.

In those cases, the review is being addressed in the Safety Evaluation in the course of the licensing process, and a separate TAC number was not obtained.

The status of MPA B-92 is unclear at this point.

The regional offices have lead review responsibility and all contacts have not been ascertained. It appears to be essentially complete, as indicated in Enclosure 2.

However, not all plants are shown on the SIMS printout.

2. should it I recommend closing MPA B-91, because the only outstanding actions are for Bellefonte I and II, which are as yet unlicensed. This Item could be pursued as a plant specific action.

MPA B-92 appears to be almost complete, (although the status of the "unlisted" plants has not been determined).

MPA B-93 addresses Salem ATWS Items 4.5.2 and 4.5.3. The review of Item 4.5.2, according to the lead reviewer~ is nearly complete.

However, Item 4.5.3 review has just been initiated. Both Items are included under one TAC which cannot be closed until both Items are complete.

The confusion created could be resolved if the SIMS output were modified to show separate dates for each part of the MPA.

As currently reported the single date does not indicate whether it applies to Item 4.5.2 or 4.5.3. Alternatively, a new MPA could be generated for Item 4.5.3, thereby allowing Item 4.5.2 to be closed on many dockets.

Generic priorities were not provided for these MPAs.

However, based on the docket priorities, medium generic priorities would be appropriate.

3.

Items for Senior Management Attention (Only list items which truly require senior management attention to resolve.)

None Isl Lead Re'viewer D. Lasher Enclosures WV PE:PD21:DRPR BMozafari 113 'b /88 Isl

~DRPR EAdrnsam l/Jl/88 Its l Lead Project' Manager B. Mozafari Project Director E. Adensam DEST: SI_ce. /

DLashe~

l/VJ/88 DEST: SIC~

DNewberr,V¥/\\

l/;J.d/88

'11 I

~ 208808-001 if28.187 R E 0 U L A T 0 R Y I N F 0 R M A T I 0 N T R A C K I N 0 S Y S T E M PAGE_i 86 M U L T I - P L A N T

! B SALEM ATHS 4.4 B&H TEST PROCEDURES l~isl 53953

' 53954 53955 53956 53957 53958 53959

  • ~

penny RKANSAS 1 CRYSTAL RIVER 3 DAVIS-BESSE 1 OCONEE 1 OCONEE 2 OCONEE 3 RANCHO SECO 1 THREE MILE ISLAND 1 Belle~ I

/3ellef".JL L.

PM CONTACT G DICK H SILVER A DEAGAZIO H PASTIS H PASTIS H PASTIS R BEVAN 0

EDISON I S S U E S R E P 0 R T

~I,,_

i B. Moz.a.~~L-I INIT

.M.If 07/08/83 07/08.183 07.108/83 07/08/83 07/08/83 07/08/83 07/08/83 07/08/83 LICENSEE

RESPONSE

LEAD PROJECT MANAGER: 9. 'J'ISSitW-'~kM.

DL BRANCH CHIEF: J, ~TQLi E.f.'\\Q TECH REVIEH BRANCH:

PM TR ESTO/

LIC.ACT.

TARGET COMPLETE COMPLETE 01.130/87 10/22/86P 10/22/86 01/30/87X 01/09/87 07.130.185 07.130/85 07.130/85 111'19/86C 111'19/86C 111'19/86C 111'04/86C 12.116/86P 11.100.186 11.119/86 11.119/86 11.104/86 12.116/86 STATUS.

CO-Qlf) 0 3

3 4

4 4

4 4

J'

  • 12oaso8-001 R E 0 U l A T 0 R Y I N F 0 R M A T I 0 N T R A C K I N 0 S Y S T E M PAGE1 87

/28/87 M U l T I - P l A N T I S S U E S R E P 0 R T e,. t"'\\ 6 ~~*~

.!. B SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES LEAD PROJECT MANAGER1 d.

!HEtiEH~, ~l*

DL BRANCH CHI EE: oB. ¥0 11H9Btft88.

TECH REVIEW BRANCH:

INIT LICENSEE PM TR ESTO/

UC.ACT.

STATUS

'Wad EA~ILIIY fM CQHIACI J!Aif gi;;s~ousi;;

~AB!;Zt:I CQMr~Eit:

f;QMrLt;It; (0~~4 ARKANSAS 1 0

DICK 07108/83 1 /31186 02/03187P 02103187 54044 ARKANSAS 2 G DICK 07108/83 11/05/83 12/31/86 02/03/87P 02103187 54045 BEAVER VALLEY 1 p

TAM 07108/83 11/21/85C 11/21/85

4.

54046 BIG ROCK POINT 1 J

HALL 07108183 06/01/84 11/19/85P 11/19/85

4.

54047 BROWNS FERRY 1 J

GEARS 07108/83 04/14186C 04/14186

4.

54048 BROWNS FERRY 2 J

GEARS 07108/83 04114/86C 04/14/86

4.

54049 BROWNS FERRY 3 J

GEARS 07108/83 04/14186C 04114186

4.

54050 BRUNSWICK 1 E

SYLVESTER 07108183 11107183 06112/85C 07101/85

4.

54051 BRUNSWICK 2 E

SYLVESTER 07108/83 11107183 06112/85C 07101/85

4. e 56287 BYRON 1 L

OLSHAN 07108183 09126/85

4.

55205 CALLAWAY 1 T

ALEXION 07108/83 07112/85C 06125/85 4

54052 CALVERT CLIFFS 1 s

MCNEIL 07108/83 11/21/85P 11121/85 4*

54053 CALVERT CLIFFS 2 s

MCNEIL 07108/83 11/21/85P 11/21/85 i 57747 CATAWBA 1 K JABBOUR 07108/83 12131/86 07102/87C 07129/87 64168 CATAWBA 2 K JABBOUR 07108/83 07131/87 07102187C 07129/87 54054 COOK 1 D

WIGGINTON 07/08/83 06126/85C 06127/85 54055 COOK 2 D HIGGINTON 07108183 06/2618§C 06127185 4

54056 COOPER STATION w LONG 07108/83 12131/86 01131/87P 01/30/87 4 4 54057 CRYSTAL RIVER 3 H SILVER 07108183 07103/85C 09/09/85

,f-54058 DAVIS-BESSE 1 A DEAGAZIO 07108/83 10/30/85C 10/30/85 54059 DIABLO CANYON 1 H

SCH I ERLING 07108/83 07108/85P 07108/85 4

54060 DRESDEN 2 M GROTENHUIS 07108/83 05116/85P 05/16185 4

54061 DRESDEN 3 M GROTENHUIS 07108183 05116/85P 05/16/85 4

54062 DUANE ARNOLD R GILBERT 07108183 08/06/85C 08/06185 4

54063 FARLEY 1 E

REEVES 07108/83 08/01/85C 09/10/85 4

54064 FARLEY 2 E

REEVES 07108/83 08101/85C 09/10/85 4

54065 FITZPATRICK H

ABELSON 07108183 07109/86C 08/06/86 4

54066 FORT CALHOUN 1 A

BOURN IA 07108183 11104/83 12131186 07110/86P 07110/86 4

54067 FORT ST VRAIN K

HEITNER 0710'8183 12131/86 10128/85C 03/03187 4

54068 GINNA c

STAHLE 01/08183 04/10186C 04/10/86

~~-j 54069 GRAND GULF 1 L

KINTNER 07108/83 07/0'i/g7e,

/~30/FJ!f' 54070 HADDAM NECK A

WANG 07108/83 02121/86P 0 /21/8 4 B-54071 HATCH 1 L

CROCKER 07108/83 10/29/85C 12/23/85 4

54072 HATCH 2 L

CROCKER 07108183 10/29/85C 12123/85 4

54073 INDIAN POINT 2 M SLOSSON 07108/83 04/26/85X 02/26186 4

54074 INDIAN POINT 3 M SLOSSON 07108/83 03/03/86P 03/03/86 4

54075 KEWAUNEE T

QUAY 07108183 08/12/85C 08/12185 2

54076 LA CROSSE p

ERICKSON 07108/83 05/17185P 05/17185 4

54077 LASALLE 1 p

SHEMANSKI 07108/83 11/25183 05/01/85C 05/01/85 4

54078 LASALLE 2 p

SHEMANSKI 07108/83 05/01185C 05/01/85 4

54079 MAINE YANKEE p

SEARS 07108/83 05J27186P 05127186 4

54080 MCGUIRE 1 D HOOD 07108/83 10/15/85C 10/31/85 4

54081 MCGUIRE 2 D

HOOD 07108/83 10115/85C 10/31 /85 4

54082 MILLSTONE 1 M BOYLE 07108/83 02/03/86P 02/03/86.

~1 54083 MILLSTONE 2 D JAFFE 07108183 03/18/86P 03/1 ~86

~

61400 MILLSTONE 3 R

FERGUSON 07108/83 06/26/87P 06~ 87 54084 MONTICELLO D DI IANNI 07108/83 03/21/86P 03121/86 54085 NINE MILE POINT 1 M HAUGHEY 07108183 03/03/86P 03/03/86

~

54086.

NORTH ANNA 1 L

ENGLE 07108183 05129/85C 09/00/85

1208808-001 R E 0 U L A T 0 R Y I N F 0 R M A T I 0 N T R A C K I N 0 S Y S T E M PAGE~ 88 1'281'87 H U L T I - P L A N T I S S U E S R E P 0 R T

~ B SALEH ATHS 4.5.1 DIVERSE TRIP FEATURES LEAD PROJECT MANAGER:~

DNTINUATION>

DL BRANCH CHIEF: B. Y U BLO 1i;CH B~Vl~~ DBAH~H=

INIT LICENSEE PH TR ESTD/

LIC.ACT.

STATUS*

.I.K...I EACILUl

~M ~QHIACI JlAll Bi;Sf QHS!;

!ABO!;!

COMfL~If COMfL!;Ii; C0-04>

54037 NORTH ANNA 2 L

ENGLE 07/08/83 05/29/85C 09/00/85

.r4 54088 OCONEE 1 H PASTIS 07/08/83 09/16/85C 10/11/85 4

54089 OCONEE 2 H PASTIS 07/08/83 091'16/85C 10/11/85 4

54090 OCONEE 3 H PASTIS 07/08/83 091'16/85C 10/11/85 4

54091 OYSTER CREEK 1 A

DR OMER I CK 07/08/83 081'091'85 2

54092 PALISADES T

WAMBACH 07/08/83 04/05/85X 08/15/85 4

59172 PALO VERDE 1 E

LICITRA 07/08/83 01/28/86X 07/09/86 4 e 54093 PEACH BOTTOM 2 R

MARTIN 07/08/83 07/24/86P 07/24/86 4

54094 PEACH BOTTOM 3 R MARTIN 07/08/83\\

071'24/86P 07/24/86 4

54095 PILGRIM 1 R

WESSMAN 07/08/.83 04/25/86 071'14/86C 08/12/86 4

54096 POINT BEACH 1 D WAGNER 07/08/83 10/24/85P 10/24/85 4

54097 POINT BEACH 2 D WAGNER 07/08/83 10/24/85P 10/24/85 4

54098 PRAIRIE ISLAND 1 D DIIANNl 07/08/83 06/01/84P 05/13/85 4

54099 PRAIRIE ISLAND 2 D DIIANNI 07/081'83 06/01/84P 05/13/85 4

54100 QUAD CITIES 1 T

ROSS 07/08/83 05/31/85P 05/ 31/85 4

54101 QUAD CITIES 2 T

ROSS 07/08/83 05/31/85P 05/31/85 4

54102 RANCHO SECO 1 R

BEVAN 07/08/83 081'19/85P 08/19/85

~

61065 RIVER BEND 1 w PAULSON 07/08/83 12/30/86 2

54103 ROBINSON 2 K ECCLESTON 07/08/83 03/20/84C 03/20/86

~

54104 SALEM 1 D FISCHER 07/08/83 03/17/86P 03/17/86 4

54105 SALEM 2 D FISCHER 07/08/83 03/17/86P 03/17/86 4

54106 SAN ONOFRE 1 D HICKMAN 07/08/83 11/08/85C 11/04/85 4

54107 SAN ONOFRE 2 H

ROOD 07/08/83 05/23/86P 05/23/86 4

54108 SAN ONOFRE 3 H

ROOD 07/08/83 05/23/86P 05/23/86 4

63421 SEABROOK 1 v NERSES 07/08/83 01/301'87 03/10/87X 54109 SEQUOYAH 1 T

ROTELLA 07/08/83 12/18/86P 12/18/86 4

54110 SEQUOYAH 2 T

ROTELLA 07/08/83 12/18/86P 12/18/86 4

61154 SHOREHAM x MCKENNA 07/00/83 12/30/86 2

54111 ST LUCIE 1 E

TOURIGNY 071(08/83 08/29/85C 12/17/85 4

54112 ST LUCIE 2 E

TOURIGNY 07/08/83 08/29/85C 04/16/87 4

54113 SUMMER 1 J

HAYES 07/08/83 10/16/85C 11/04/85 4

54114 SURRY 1 c

PATEL 07/081'83 12/13/85P 12/13/85 4

54115 SURRY 2 c

PATEL 07/08/83 12/13/85P 12/13/85 4

54116 SUSQUEHANNA 1 H THADANI 07/08/83 05/09/86X 06/10/86 4

59875 SUSQUEHANNA 2 M THADANI 07/08/83 05/09/86X 06/10/86 4

54117 THREE MILE ISLAND 1 G

EDISON 07/08/83 11/15/85X 10/28/85 4

54118 TROJAN T

CHAN 07/08/83 07/11/85P 07/11/85 4

54119 TURKEY POINT 3 D MCDONAL.,

07/08/83 11/08/83 01/01/86C 05/01/86 4

54120 TURKEY POINT 4 D MCDONALD 07/08/83 11/08/83 05/J)1/86C 05/01/86 4

54121 VERMONT YANKEE 1 v

ROONEY 07/08/83 03/23/84 12/02/85P 12/02/85 4

65371 VOGTLE 1 J

HOPKINS 07/08/83 07/15/87 07/17/87X 07/07/87 4

54123 WASHINGTON NUCLEAR 2 R

SAMWORTH 07/08/83 07/03/85C 07/03/85 4

57709 WATERFORD 3 J

WILSON 07/08/83 2

57374 WOLF CREEK 1 p

OCONNOR 07/08/83 12/30/86 05/03/85X 1 0/07/86 1

54122 YANKEE-ROHE 1 M FAIRTILE 07/08/83 11/05/83 05/07/86P 05/07/86 54124 ZION 1 J

NORRIS 07/08/83 07/05/85C 07/05/85 54125 ZION 2 J

NORRIS 07/08/83 07/05/85C 07/05/85 4

r

  • r 1

'208808-001

'281'87

_ B ~

53960 53961 53962

. 62958 53963 1 64032

'53964 53965 53966

53967 53968 56288 63254 55206 53969 53970 57744 64171 63076 53971 53972 53973 53974 53975 53976 53977 53978 53979 53980 53981 64104

. 53982

' 53983 53984 53985 53986 53987 53988 53989 61479 53990 53991 53992 53993 53994 53995 53996 53997 53998 FACILITY ARKANSAS 1 ARKANSAS 2 BEAVER VALLEY 1 BEAVER VALLEY 2 BIG ROCK POINT 1 BRAIDWOOD 1 BROWNS FERRY 1 BROWNS FERRY 2 BROWNS FERRY 3 BRUNSWICK 1 BRUNSWICK 2 BYRON 1 BYRON 2 CALLAWAY 1 CALVERT CLIFFS 1 CALVERT CLIFFS 2 CATAWBA 1 CATAWBA 2 CLINTON 1 COOK 1 COOK 2 COOPER STATION CRYSTAL RIVER 3 DAVIS-BESSE 1 DIABLO CANYON 1 DRESDEN 2 DRESDEN 3 DUANE ARNOLD FARLEY 1 FARLEY 2 FERMI 2 FITZPATRICK FORT CALHOUN 1 FORT ST VRAIN GINNA GRAND GULF 1 HADDAM NECK HATCH 1 HATCH 2 HOPE CREEK 1 INDIAN POINT 2 INDIAN POINT 3 KEWAUNEE LA CROSSE LASALLE 1 LASALLE 2 MAINE YANKEE MCGUIRE 1 MCGUIRE 2

~o~d~~

R E G U A T 0 R Y I N F 0 R M A T I 0 N T R A C K I N G S Y S T E M PAGE:

89 M U L T I - P L A N T I S S U E S R E P 0 R T B. Hoz.o-~

EST ALTERNATIVES LEAD PROJECT MANAGER: -:ta:-

~Tl!vl!lfS-

... \\

DL BRANCH CHIEF: Ir. ¥8tH4"BLOOD E'°*.p,c:i~

TECH REVIEW BRANCH:

PM CONTACT G DICK G DICK P

TAM P

TAM J

HALL S

SANDS J

GEARS J

GEARS J

GEARS E SYLVESTER E SYLVESTER L

OLSHAN L

OLSHAN T ALEXION S

MCNEIL S

MCNEIL K JABBOUR K JABBOUR R STEVENS D

WIGGINTON D WIGGINTON W LONG H SILVER A DEAGAZIO H SCHIERLING M GROTENHUIS M GROTENHUIS..

LICENSEE

RESPONSE

07/26/85 051'311'85 PM TARGET 04/30/87 12/311'87 R GILBERT 07/26/85 09/30/85 TR ESTD/

COMPLETE

~5>'831'85)(

881'26.'B7X 031' 311'87P 09/30/88 QE:_

E REEVES

-1 7/081'83 09/30/85 06.IO_U85X.

~ ~~~rn~~

  • -f!{_, g~~Si)i:~--
    • ----=~-~=---*-*------- -------

~ ~~~~~~~


3~~~t;z g~?H~:1--~2Jn~I~---- 3~7~-g~:~----mHmt**

C S

L ----1;;.itl1-ll'7JQ-87"6-:r-*----- -----------** *--*--*-----****-*

  • TAH E

_______ J_y1 __ _ _ 11_

L KINTNER 07/08/83 A WANG

>-JP.:U.07/08/83 L c*ROCKER L.1:tfH10.Z.L0.=8L'--'_a.~3"-_-_-_-_-_-_-_*=---:-_-

L CRO.CKER

/ 2..:Lff:.f11l1Lo.BLa..__ _____ _

G RIVENBARK ll'*.l.i*fi'?071Q8L8.3

~12=-L3~.1*z3z **==--=:.--_-_...._. :* :*.

__l!l_SLilSS_O_N 1--2}~7/ Q_aL.8

___________ 04/'!6_/ 85X..

M SI OSSQN 1-22;

.DJ.LD8L&3 T

QUAY t-218_

j.Jl8L&.L_ _________... 09/30.188.*. -

_-J>--EJUCKSON t>EC.&M!ll\\0710.8L8.3

__ 07/01/87P P

SHEMANSKI___

07/0~/8_3 __

Q~_/1_6~_85______________ _06/Q5/87X P

SHEMANSKI 07/08/83

_D&!06(85 _________________ 061'05/87X

~

~~~~s --

~l)bf~_0_8~a-~-~;-o~g-}--*-_-. _______

--'Lt/./~:1JlL_0_8._8_l_O _J! ________ _

D HOOD t/t'l/8(07/08/83 051'241'85


*---**.:ff(\\7f"Y85-..

UC.ACT.

COMPLETE 03/31/87 07/011'87 STATUS

( 0-04').

2 2

4 2

2 2

2 2

2 2

2 2

2 1

2 2~

~

3 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 1

2 4

2 2

2 2

2

-1208808-001 2/28/87 R E 0 U L A T 0 R Y I N F 0 R M A T I 0 N T R A C K I N 0 S Y S T E M M U L T I - P L A N T I S S U E S R E P 0 R T

' PAGE1 90

~ B SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES CONTINUA TI ON>

LEAD PROJECT MANAGER1 J. STEVENS DL BRANCH CHIEF= B. YOUNGBLOOQ

------==T~EC

..... H.._._R...,E..... V_.I..,.E.......

W_.B""'R_..._A...,_N.... C;.uH_1 IAk....I 53999 54000 60401 54001 54002 54003 54004 54005 54006 54007 54008 54009 59173 61840 64254 54010 54011 61707 54012 54013 54014 54015 54016 54017 54018 54019 61035 54020 54021 54022 54023 54024 54025 63417 54026 54027 A ji0968

't..~0969 54028 54029 54030 54031 54032 54033 59513 54034 54035 54036 FACILITY MILLSTONE 1 MILLSTONE 2 MILLSTONE 3 MONTICELLO NINE MILE POINT 1 NORTH ANNA 1 NORTH ANNA 2 OCONEE 1 OCONEE 2 OCONEE 3 OYSTER CREEK 1 PALISADES PALO VERDE 1 PALO VERDE 2 PALO VERDE 3 PEACH BOTTOM 2 PEACH BOTTOM 3 PERRY 1 PILGRIM 1 POINT BEACH 1 POINT BEACH 2 PRAIRIE ISLAND 1 PRAIRIE ISLAND 2 QUAD CITIES 1 QUAD CITIES Z RANCHO SECO 1 RIVER BEND 1 ROBINSON 2 SALEM 1 SALEM 2 SAN ONOFRE 1 SAN ONOFRE 2 SAN ONOFRE 3 SEABROOK 1 SEQUOYAH 1 SEQUOYAH 2 SHOREHAM SHOREHAM ST LUCIE 1 ST LUCIE 2 SUMMER 1 SURRY 1 SURRY Z SUSQUEHANNA 1 SUSQUEHANNA 2 THREE MILE ISLAND 1 TROJAN TURKEY POINT 3 INIT Mlf LICENSEE PM TR ESTO/

LIC.ACT.

STATUS PM CONTACT

RESPONSE

TARGET COMPLETE COMPLETE

<0~04)

M BOYLE 07/08183 03/13/87 0 91 3 O_L8__8_

D JAFFE 07108.(83 111~11:.ll~----------

~

~~~~~~~N -=::1Jl4/B 1 W.:'-'-~.u.g.oL~-------------0-8_/_3_0/_8_5_X_

M HAUGHEY 07/08783 09/30/88 t ~~gt~

u:~J s~~g:~g~------------......;g;...;;~;c-~-=gm~--

H PASTIS 7 ~ 07/08/83 1273178/

H PASTIS 07/0818~

12/31/87 H PASTIS 07/08/83 12/31187 05100/87 02/27187 A DROMERICK

-/-IL8~_0_L2_3~8_5

---~u-9~7~30~7~g~g~-

T WAMBACH 07/08/83 07101/85

~1'(fS1'8SX E LICITRA

~l}__!l___/8~ __

Q_4/o_J._t~~ -----u373oiar--o:1~28 tl6X- -

E LICITRA I

07/08/83

--ll3l30787 E LICITRA

~~_)Jt~_!l8"'.8_3-_::_~_~J~~/l)3/86--06i-01/87 R MARTIN 07/08/83 05/29185 ----

-llrllJl178~X-R MARTIN 07/087!3 05/291~5 10709787~

T COLBURN 07108/83 07/31186 R WESSMAN 07/08/83 0~/23185 i ~~,~~~I

~~g~~g=~=~

03131/87W_

it61'01>'MP

o&,c Q 1.<841

0 DIIANNI

~07/08/83 T

ROSS 07/08/8~3 ______

~0~9~0La_6 ____ _

T ROSS 0 71____1l_8_t_8__3 l9.£3 018 6~---

R BEVAN 07108/83 05/23185 04/22/~I~

H PAULSON

..]7/08/83 1 U_3JlL8_6 _____.

K ECCLESTON

~"1i°f071.lJ8/__,8,__,_,3~-----------0.3_LZ:9+/-8_5)1(

g ~rn~~~: _

~-~-

_2f:i 1

'W/1U5-_gg_~t~'------------------ -~-----------

D HICKMAN 07/08/83 ____ _

H ROOD 01!.J)--82.8:-.._-____ _

H ROOD 07/08/83 V

NERSES 07/08/if3_____

09!___,30/_8L ___ Q6/30/IHS~.

T T

ROTELLA

-~-rQ_?_L_Qf>_t__f.}1

____ -______ :1)81'l!1_t87Jt_

ROTELLA

~-*

-~-~-f-h' 07/0.8L8_3

-8_8*'2V87X X MCKENNA QJ__!OQ_;l'Jt3 tZl3JV86c--~--=---=-=-""""

X MCKENNA 07/08/83 12t_3_0l.86_jJ)l02L81X~

E TOURIGNY

__ ?ll~fB

_9I!08/83 1?*'_39~8S*L

~

~2~~~GNY

J,p~ !1-gt;gg~-:~----------------*----------------*-i!r39_1'_8__~~---

. *tl "!-'-- ---. -

c PATEL Q_l~Q~/8_3 C

PATEL

~

OliJl&L.83

__________ 12>"3J1-'86_

M THADANI 07108/83 M THADANI 07 / 08/8""'3 ________ --------------*

0 EDI SON 07768/ 8r--------- -- - -- -- --

~

T CHAN 07708/83 06/14185,

--:-fJJ,.25J'.'86X D MCDONALD

_f!7/08/8_~-

(f~_Q_8Z°83_:_-=:::=-~-----()-~(30~86W 06101184 06/01/84 09/30187 0

2 2

2 2

4 4

2 2

2 2

2 2

2 2

2 2

2 2

2 2

4 4

1 1

4 2

2 0

0 1

2 2

3 3

2 2

2 2

2 2

2 2

2 2

2

I

(~1 ~oaaoa-001

'21'28/87 R E 0 U L A T 0 R Y I N F 0 R M A T I 0 N T R A C K I N 0 S Y S T E M M U L T I - P L A N T I S S U E S R E P 0 R T PAG~s

'D!. B SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES CONTINUATION>

I*

IALI 54037 54038 54040 57710 57373 54039 54041 54042 FACILITY TURKEY POINT 4 VERMONT YANKEE 1 WASHINGTON NUCLEAR 2 WATERFORD 3 WOLF CREEK 1 YANKEE-ROHE 1 ZION 1 ZION 2

~P1a)ej</~

~/ft..

~~

~/efL

,~~

~7~11i..

. (o~ /~v.

)\\J~f 1~3 PM CONTACT D MCDONALD V ROONEY R SAMWORTH J

HI1LSON P

OCONNOR M FAIRTILE J

NORRIS J

NORRIS INIT

~

LEAD PROJECT MANAGER1 J. STEVENS DL BRANCH CHIEF: B. YOUNGBLOOD,

~JECH REVIEW BRANCH:

LICENSEE PM

."TR ESTO/

UC.ACT.

STATUS

RESPONSE

TARGET COMPLETE COMPLETE C0-04>

2 1

2 4

2 1

1

STATUS

SUMMARY

OF MPA NOS.B-91, B-92, and B-93 PERCENT MPA ATWS ITEM COMPLETED COMPLETE B-91 4.4 9

82%

B-92 4.51 89*

94%*

B-93 4.5.2 78 62%

4.5.3 0

0

  • Information from the SIMS database which excludes plants which do have not current operating licenses, or did not have at the time the MPA was created.