ML18093B385

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Supporting Util New Excore/Incore Calibr Process at Plant.Region I Had Requested Assistance in Evaluating Technical Adequacy of One Point Calibr Process & Provided Licensee Rept NFU-053
ML18093B385
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/30/1988
From: Boger B
Office of Nuclear Reactor Regulation
To: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18093B386 List:
References
TAC-65358, NUDOCS 8901110148
Download: ML18093B385 (2)


Text

,

December 30, 1988 Docket No.:

50-311 MEMORANDUM FOR:

William F. Kane, Director Division of Reactor Projects, Region I FROM:

Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Projects I/II

SUBJECT:

SAFETY EVALUATION FOR TIA; EXCORE/INCORE CALIBRATION AT SALEM UNIT 2 (TAC NO. 65358)

Enclosed is the SE approving Public Service Electric and Gas Company's new excore/incore calibration process. Region I had requested assistance in evaluating the technical adequacy of the licensee's 1-point" calibration process and provided the licensee's report NFU-053, entitled, "The Calibration of Excore Power Range Detectors".

The staff has reviewed the report and concluded the method is satisfactory. This completes our effort on the TIA.

Enclosure:

Excore/Incore Safety Evaluation cc w/encl:

M. Chatterton

Contact:

D. Fischer, NRR 49-21419 DISTRIBUTION w/encl.

Docket Fffe PDI-2 Reading WButler/MO'Brien MThadani

~JHodges rwFKANE MEMOJq4,V POJ'Js.~

PDI-~/PM

!Jfi'lcffW~:mr llStone f!2j_/_88-- --- \\~/~/8~-----

(

8901.110148 881230 PDR ADOCK 05000311 p

PNU IS/

Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Prbjects I/II NRC PDR & Local PDR SVarga/BBoger DFi scher I l1Stone MChatterton A. Mef1diolo-PDI-2/D~~a-~r WButler 8~=~R

\\ )../ij,.'l/--08 11/1()/88 vrol r)i

  • \\.~p.R REGu(

~.;;,"

"'>o.,,

UNITED STATES f

g.

NUCLEAR REGULATORY COMMISSION_

WASHINGTON, D. C. 20555

~

~

~~?

~o~

December 30, 1988

        • ~

Docket No.:

50-311 MEMORANDUM FOR:

FROM:

SUBJECT:

William F. Kane, Director Division of Reactor Projects, Region I Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Projects I/II SAFETY EVALUATION FOR TIA; EXCORE/INCORE CALIBRATION AT SALEM UNIT 2 (TAC NO. 65358)

Enclosed is the SE approving Public Service Electric and Gas Company's new excore/incore calibration process.

Region I had requested assistance in evaluating the technical adequacy of the licensee's "I-point" calibration process and provided the licensee's report NFU-053, entitled, "The Calibration of Excore Power Range Detectors". The staff has reviewed the report and concluded the method is satisfactory. This completes our effort on the TIA.

Enclosure:

Excore/Incore Safety Evaluation cc w/encl:

M. Chatterton

Contact:

D. Fischer, NRR 49-21419 Bruce A. Boger, Assistant Director for Region I Reactors Division of Reactor Projects I/II