ML18093A557

From kanterella
Jump to navigation Jump to search
Forwards Operating Ltr for IAEA Surveillance Interval of 870922-1130
ML18093A557
Person / Time
Site: Salem 
Issue date: 12/24/1987
From: Corbin McNeil
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLR-N87238, NUDOCS 8801070450
Download: ML18093A557 (4)


Text

...

Public Service Electric and Gas Company Corbin A. McNeil!, Jr.

Senior Vice President -

Nuclear Public Service Electric and Gas Company P.O. Box 236, Han cocks Bridge, NJ 08038 609 339-4800 December 24, 1987 NLR-N87238 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

OPERATING LETTER SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 Attached is the operating letter for Salem Unit No. 1 for the IAEA surveillance interval of September 22, 1987 to November 30, 1987.

Should you have any questions, please feel free to contact us.

Sincerely, Attachment C

Mr. D. C. Fischer USNRC Licensing Project Manager Mr. T. J. Kenny USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. C. Emeigh Safeguards Material Licensing and International Activities Branch Off ice of Nuclear Material Safety and Safeguards

.Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 1 -;$8010:70450 871224 I

~

PDR ADOCK 05p~0272_

R... --*******.*::---:*-:**.* -****.-llll!f

Page 1 of 3 Pages DOE/NRC FORM 740M U.S. DEPARTMENT OF ENERGY Approved by OM,B ;*.

(12-81)

AND 038-R0477 MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY COMMISSION Approved by OMB AUTHORIZED BY 10 CFR 30, 40, 50, 3150-0057 70, 75, 150, Public Laws83-703, CONCISE NOTE 93-438, 95-91

1. NAME
2. ATTACHMENT TO

~* RIS

4. REPORTING PERIOD Public Service Electric & Gas Co~

a.0DOE/NRC 741 b.0DOE/NRC 742 c.0DOE/NRC 742c HF/UXHF FROM ITO STREET ADDRESS

5. TRANSACTION DATA 9/22/87 11/30/87 P.O. Box 236
a. SHIPPER'S
b. RECEIVER'S
c. TRANS. NO.
d. COAR
e. PC I.AC g

OAT*\\

6. REPORTING DATE RIS RIS NO.

CUOf-CITY I

STATE I ZIP CODE XHF/ XHF/

11/30/87 Hancocks Bridge NJ 27 M

6

7. LICENSE NUMBERS 08038 UXHF UXHF DPR 70 Ba. LINE NO.
b. ENTRY REFERENCE
c. TEXT OF CONCISE NOTE 1

General Operating Letter Salem Unit 1 2

II During the IAEA surveillance interval from 3

II Septeffiber 22nd to November 30th, several 4

II transactions were conducted in the Unit #1 5

II Fuel Handling Building and Unit #1 containment.

6 II Seventv ( 7 0) new fuel assemblies were trans-7 II ferred from the new fuel nit to the sn~nt: -F11~1 8

II pit between October 13th and October 16th.

9 II Prior to the transfer, spent fuel rack cells 10 II drao tested.

The reactor was unloaded were core 11 II

  • between October 22nd and October 25th.

Fuel 12 II inspection then resumed in the Fuel Handling 13 II Buildinq early on October 25th, with final 114 II completion on November 13th.

Fuel assembly

,II

.insert changeouts began November 13th and 15 To the best of my knowledge and belief, the information given above and in any attached schedules is true, complete, and correct.

~IGNATURE (See insrr~: p~si;n~

~onfidentiality.)

10. TITLE

~~°(zTf 81 General Manager -

Salem Operations 18 U.S.C. SECT JON 1001; ACT OF JJ'NE 25, 1948; 62 STAT. 749; MAKES IT A CRIMINAL OFFENSE TO MAKE A WILLFULLY FALSE STATEMENT OR flEPRESENTATION TO 1\\NY DEPARTMENT OR AGENCY OF THE UNITED STATES AS TO ANY MATTERS WITHIN ITS JURISDICTION,

Page 2 of 3 Pa~s,

4 DOE/NRC FOAM 740M U.S. DEPARTMENT OF ENERGY Approved by,OMB 112*81)

AND 038-R0477 MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY COMMISSION Approved by OMB AUTHORIZED BY 10 CFR JO, 40, 50, 3Hi0-0.0!i7 10, 75, 150, Publlc L*ws ll*70l, CONCISE NOTE 93-438,95-91

1. NAME
2. ATTACHMENT TO

~* RIS

4. REPORTING Pf: RIOI>

Public Service Electric & Gas Co.

  • .ODOE/NRC 741 b.0DOE/NRC 742 c.DDOE/NRC 742c HF /UXHF FROM9/22/87 ITOll/30/87 STREET ADDRESS
6. TRANSACTION DATA P.O. Box 236
  • --R'S b... EC£1VER'S c. TRANS. NO.
d. COAR *.PC

01\\TA 6. REPORTING DATE RIS RIS NO.

CtJOf-11/30/87 CITY I STATE I ZIP CODE XHF/ XHF/

Hancocks Bridge NJ 08038 27 M

6

7. LICENSE NUMBERS UXHF UXHF DPR 70 Ba. LINE NO.
b. ENTRY REFERENCE c, TEXT OF CONCISE NOTE 16 General Pl'.'Oceeded through Novembel:' 18th.

The reactor 17 II from containment vessel specimen was transferred II 18 to the Fue 1-Handling Building November 19th.

Core II until Problem was 19 reload beqan November 21st, a

20 II discovered which required offload.

The off load 21 II was r!nmn 1 <=>+-en Nn"lrember 25th.

Fuel insnections

??

II were again performed in the Fuel Handling Building 23 II November 27th.

During the interval, alternate 24 II lighting was placed in the Fuel Handling Building.

25 II Normal lighting was interrupted on November 7th 26 II at approximately 1955 hrs. and was restored at

? '7 II approximately 2010 hrs.

Again on November 9th 28 II between 0935 hrs. and 0952 hrs (approximately)

II alternate lighting.

~Q normal liqhtinq was replaced by 30 II Cycle 7 ended October 2 I 1987 with a cumulative To the best of mv knowledge 11nd beli11f, the information given 11bove 11nd in 11ny 11U11ched 1ehedules is true, complete, and correct.

&.'GNATURE (Su::ns ~ :pra:isfs~';'<:)-g.canfidentiality.J

10. TITLE Salem Operations 1;;1~E(8t-General Manager -
r,.,

18 U.S.C. c- -TION 1001; ACT OF JUNE 25, 1948; 62 STAT. 149; MAKES IT A CRIMINAL OF' DEPART' OR AGENCY OF THE UNITED STATES AS TO ANY MATTERS WITHIN ITS JU

'::TO MAKE A WILLFULLY FALSE STATEMENT OR REPRESENT Al ION TO Al

TION.

\\

Page 3 of 3: P~ges DOE/NRC FORM 7"40M U.S. DEPARTMENT OF ENERGY Approved by t:.MB (12-111)

AND 038-R047i' MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY CoMMISSION Approved by. OMB AUTHORIZED BV 10 CFR JO. 40 0 50, 31!10-00!'>7 10, 15, 150, Publlc L*wsll-103, CONCISE NOTE 93-4311, 95-91 1-NAME

2. ATTACHMENT TO
13. RIS 4_ REPORTING P[ AIOI>

Public Service Electric & Gas Co.

  • .ODOE/NRC 741 b.ODOE/NRC 742 c.DOOE/NRC 742c XHF/UXHF FROM ITO STREET ADDRESS
6. TRANSACTION DATA 9/22/87 11/30/87 P.O. Box 236 o.S>fll'l'ER'S
b. RECEIVER'S c. TRANs. NO.
d. CORA *.PC t, AC q

DATA 6. REPORTING DATE RIS RIS NO.

COOf.

11/30/87 CITY

'STATE I ZIP,CODE XHF/

XHF/

Hancocks Bridge NJ 08038 27 M

6

7. LICENSE NUMBERS UXHF UXHF DPR 70 BB. LINE NO.
b. ENTRY REFERENCE
c. TEXT OF CONCISE NOTE 31 General burn up of.16804. 51 MWD/MTM:

The cycle 8 core 32 II will contain 84 fresh assemblies with 109 spent 33 II assemblies.

After reload, the spent fuel" pit 34 II should contain 464 fuel assemblies.

  • ""i

To the best of mv knowledge and belief, the information given *bow *nd in *nY attached 1ehedules is true, complete, and correct_

I~ SIGNATURE (SH?;:; f°lr~vi;ons a'Cd ~onfid~ntialitv.J

10. TITLE General Manager -

Salem Operations 1;;_7~(81-I~ U.S.C. c--TION IOd'J; ACT OF JUNE 25 1948

  • 62 STAT. 149
  • MAKES IT A CRIMINAL OF*

'::TO MAKE A F

V FA SE TATEMENT OR REPRESENTATION TO Ar DEPART' OR AGENCY OF THE-UNITED STATES AS TO ANY MATTERS WITHIN ITS JU WILL ULL L

S

.:TION.