0 Public Service Electric and Gas Company Corbin A. McNeil!, Jr.
Senior Vice President -
Nuclear Public Service Electric and Gas Company P.O. Box236, Hancocks Bridge, NJ 08038 609 339-4800 October 15, 1987 NLR-N87191 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
- 0 c::o
...J C::>
c:
(""') -
U')
TESTING OF SPECIMEN CAPSULES SALEM GENERATING STATION UNIT NO. 2 N
z
.....J
- .:o 0
I DOCKET NO. 50-311
)> o 9
en 0
Per the requirements of 10CFR50, Appendix H, Section III.A, ae>
report providing summary results of surveillance specimen capsule testing is to be submitted to the Director, Office of Nuclear Reactor Regulation within one year of withdrawal from the reactor vessel.
During Salem Unit 2's last refueling outage, a surveillance capsule was withdrawn from the reactor vessel on October 21, 1986.
As such a report is due on October 21, 1987.
Because of difficulties at the laboratory performing the surveillance testing, PSE&G is unable to provide the test report by the required date and therefore requests extension of the submittal date to November 30, 1987.
Should you have any questions, please feel free to contact us.
Sincerely,
~..
.\\*
\\}
- r
Document Control Desk 2
C Mr. D. C. Fischer USNRC Licensin~ Project Manager Mr. T. J. Kenny USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 10-15-87