ML18093A217
| ML18093A217 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/06/1987 |
| From: | Corbin McNeil Public Service Enterprise Group |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NLR-N87126, NUDOCS 8707140400 | |
| Download: ML18093A217 (3) | |
Text
- - -
L
,J
- e.
Public Service Electric and Gas Company Corbin A. McNeil!, Jr.
Senior Vice President -
Nuclear Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 July 6, 1987 NLR-N87126 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
OPERATING LETTER SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 Attached is the operating letter for Salem Unit No. 1 for the IAEA surveillance interval of April 17, 1987 to June 11, 1987.
Attachment C
Mr. D. C. Fischer Licensing Project Manager Mr. T. J. Kenny Senior Resident Inspector Sincerely, Mr. w. T. Russell, Administrator Region I Mr. Eugene Sparks Safeguards Material Licensing and International Activities Branch Office of Nuclear. Material Safety & Safeguards Mr. D. M. Scott, Chief.
Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 8707140400 870706 PDR ADOCK 05000272
~
I Page 1 of 2 Pages DOE/NRC FORM 740M U.S. DEPARTMENT OF ENERGY Approved bv OMB (12-81)
AND 038-R0477 MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY COMMISSION Approved by OMB AUTHORIZED BY 10 CFR JO, 40, 50, 31 !i0-00!i7 70, 75, 150, Public L*ws 9J-70l, CONCISE NOTE 93-439,95-91
- 1. NAME
- 2. ATTACHMENT TO
- 13. RIS
- 4. REPORTING Pl: ntOI>
Public Service Ele*ctric & Gas
- .0~/NRC 741 b.0DQE/NRC742 c.DDOE/NRC 742c XHF/UXHF FROM Jrn STREET ADDRESS 5.. TRANSACTION OATA 4/17/87 6/11/87 P. o. Box 236
- SHIPP£R'S
- b. RECEIVER'S c. TRANS. NO.
rt.CORR *PC
'*AC 11 Oil\\JI\\
- 6. REPORTING DATE RIS RIS NO.
COOi-CITY IST~T~J I ZIP CODE XHF/ ~HF/
Hancocks Bridge 08038 22 M
6
- 1. LICENSE NUMBERS UXHF lJXHF DPR 70 Ba. LINE NO.
- b. ENTRY REFERENCE
- c. TEXT OF CONCISE NOTE 1
GENERAL Operating Letter Salem Un:i:t #1 II 2
During the IAEA surveillance interval from II 3
April 17th to June 12th, there were no II fuel transactions conducted in Uhit #1 4
5 II Fuel Handling Building.
The Fuel Handling 6
II Building liqhting panel breakers have been 7
II caution tagged requiring reactor engineering 8
II notification prior to operation.
Reactor
- 9 II Engineering r.eceived no notification 10 II during this period.
Power reduced to 70%,
11 II inclement weather - May 12th.
Power II 12 increased to 100% - May 13th.
Power 13 II reduced to 58%, feed pump strainer cleaning -
14 II May 24th.
Power increased to 100% -
15 II May 25th.
To 1he best of my knowledge end belief, the infor1T11tion given 1bove and in any 1tt1chl!d 1ehedules is true, complete, and correct.
- 9. SIGNATURE (Sttt1 in(Ji:ii ';;::or:;.~~onfidentialirv.J
- 10. TITLE
- 11. DATE Operations
~/t9/t/
rr-I General Manager -
Salem 18 U.S.C. c--TION I Odi; ACT* OF JUNE 2 5 1949
- 6 STAT. 749
- MAKES IT A CRIMINAL OF*
'::TO MAKE AW F
y l'A E TATEMENT OR REPRESENTATION TO l\\r DEPART' 2
OR AGENCY OF THE UNITED STATES AS TO ANY MATTERS WITHIN ITS JU ILL Ul L LS S
- TION.
/
(
Page 2 of 2 PaYf!s *.
OOE/NRC FORM 740M U.S. DEPARTMENT OF ENERGY Approved by OMB (12*81)
AND 038-R0477 MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY COMMISSION Approved by OMB
- AUTHORIZED BY 10 CFR JO, 40, SO, 31 !'10.00!'17 10, IS, 150, Publlc L*WI 8l*70l, CONCISE NOTE 93-438, 9S-9 I
- 1. NAME
- 2. ATTACHMENT TO 1~~
1
- /UXHF
- 4. REPORT! NG P,[ AIOI>
Public service Electric & Gas
- .0~/NRC 741 b.0DOE/NRC742 c.0DOE/NRC 742c FROM ITG/11/87 STREET ADDRESS
- 6. TRANSACTION DATA 4/17/87 P. o. Box 236
- . SHIPPeR'S
- b. RECUVEA'S c. TRANS. NO.
rt. CORO P. PC t, AC
'1 01\\TI\\
- 6. REPORTING DATE AIS
"'s NO.
CllOJ.
CITY I
STATE I ZIP CODE XHF/ *XHF/
Hancocks Bridge,
. NJ 08038 22 M
6
- 7. LICENSE NUMBERS UXHF UXHF DPR 70 811. LINE NO.
- b. ENTRY REFERENCE
- c. TEXT OF CONCISE NOTE 16 General Power reduced to 29%, aux+/-liary power 17 II transformer energized -
May 29th.
Power II 18 increased to 100% -
June 1st.
Reactor 19 II trio. transmission fault sensed -
June 2nd.
20 II Reactor critical -
June 3rd.
Power II 21 reduced to 85%. condensate pump seal 22 II replacement -
June 6th.
Power increased 23 II to iOO% -
June 7th.
Cumulative Cycle 24 II Burn up through June 12, 1987 25 II 13,035.85 MWD/MTM 1163100.41 MWD.
e To the best of my knowledge 1nd belief, the lnfor1n1tion given above end In any attached 1ehedules Is true, complete, and c:Orrect.
- 9. SIGNATURE (Sn ~s
)pra~siaLii(J:confidentiatitv.I
- 10. TITLE
- 11. DATE General Manager Salem Oper.ations
~fr/t7
/f.. I r"U 18 u.s.c.c--TIONI06.f; ACT*OFJUNE2S 1948* 62 STAT.749; MAKESITACRIMINALOFr
'::TO MAKE A WIL F LLY F'ALSE STATEMENT OR REPRESENTATION TO Ar DEPART' OR AGENCY OF THE UNITED STATES AS TO ANY MATTERS WITHIN ITS JU L U
- TION.
i::
t~
\\*
I
'I