Public Service Electric and Gas Company Corbin A. McNeill, Jr.
Senior Vice President -
Nuclear Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 May 20, 1987 NLR-N87084 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
OPERATING LETTER SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 Attached is the operating letter for Salem Unit No. 1 for the IAEA surveillance interval of February 18, 1987 to April 16, 1987.
Attachment C
Mr. D. c. Fischer Licensing Project Manager Mr *. T. J. Kenny Senior* Resident Inspector Sincerely, Mr. w *. T. Russell, Administrator Region I Mr. Eugene Sparks Safeguards Material Licensing and International Activities Branch Office of Nuclear Material Safety & Safeguards Mr. D. M. Scott,. Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 8705280129 870520 PDR ADOCK 05000272
~
Page. 1 of,2 Pages DOE/NRC FORM 740M U.S. DEPARTMENT OF ENERGY Approved by OMB,
(12-81)
AND 038-R0477 MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY COMMISSION Approved byDMB AUTHORIZED BY 10 CFR 30, 40, 50, 3150-0057 70, 75, 150, Public Laws83-703, CONCISE NOTE 93-438,95-91
- 1. NAME
.2. ATTACHMENT TO
- 13. RIS
- 4. REPORTING PERIOD Public Service Electric and Gas Co.
a.OooE/NRC 741 b.0DOE/NRC742 c.DDOE/NRC 742c XEF/UXHF FROM ITO STREET ADDRESS
- 5. TRANSACTION DATA 2/18/87 4/16/87 P.O. Box 236 a, SHIPPER'S
- b. RECEIVER'S c, TRANS. NO.
- d. COAR
- e. PC t.AC g
O/\\TA 6. REPORTING DATE RIS RIS NO.
CODf-CITY I
STATE I ZIP CODE XHF/
XHF/
21 M
6
- 7. LICENSE NUMBERS Hancocks Bridge NJ 08038 UXHF UXHF DPR 70 Ba. LINE NO.
- b. ENTRY REFERENCE
- c. TEXT OF CONCISE NOTE 1
General Operating Letter Salem Unit #1 2
During the IAEA surveillance interval from 3
II February 18th to l\\.pril 16th, there were no L1 fuel transactions conducted in Unit #1 5
II Fuel Handling Building.
The Fuel Handling 6
II Buildinq liqhtinq panel breakers have been 7
II caution tagged requiring reactor engineering 8
II notification Prior to ooeration.
Reactor 9
II Engineering received no notification 10 II during this period.
Power reduced to 7::::. '*
..J 0 '*
11 II loss of transmission line - March 1st.
12 II Power reduced to 67%, transmission grid 13 II instability - March 5th.
Reactor shutdown, 14 II control rod drive vent fan repair -
15 II March 8th.
Reactor critical - March 15th.
To the best of my knowledge and belief, the information given above and in any attached schedules is true, complete, and correct.
- 9. SIGNATURE (See instruc~ov7:r~ard7 #lity.}
- 10. TITLE
- 11. DATE General Manager - Salem Operation~
4/22/87 18 U.S.C. SECTION 1001; AC-f OF JUNE 25, 1948; 62 STAT. 749; MAKES IT A CRIMINAL OFF.
E TO MAKE A WILLFULLY FALSE STATEMENT OR REPRESENTATION TO A DEPART.* OR AGENCY OF THE UNITED STATES AS TO ANY MATTERS WITHIN ITS J.CTION.
Page 2 of 2 Page5.
DOE/NRC FORM 740M U.S. DEPARTMENT OF ENERGY Approved by OMB,
(12-81)
AND 038-R0477 MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY COMMISSION Approved by.OMB AUTHORIZED BY 10 CFR 30, 40,.50, 3150-0057 70, 75, 150, Public Laws83-703, CONCISE NOTE 93-438. 95-91
- 1. NAME
- 2. ATTACHMENT TO
- 13. RIS
- 4. REPORTING PERIOD Public Service Electric and Gas Co.
a.0DOE/NRC 741 b.0DOE/NRC742 c.DDOE/NRC 742c XHF/UXHF' FROM lTO STREET ADDRESS
- 5. TRANSACTION DATA 2/18/87 9/16/87 P.O. Box 236
- a. SHIPPER'S
- b. RECEIVER'S c. TRANS. NO.
- d. CORR
- e. PC f,AC g
DATA
- 6. REPORTING DATE RIS RIS NO.
COOF-CITY ISTATE.
I ZIP CODE XHF/ XHF/
21 M
r 0
- 7. LICENSE NUMBERS Hancocks Bridge, NJ 08038 UXHF UXHF DPR 70 Ba. LINE NO.
- b. ENTRY REFERENCE
- c. TEXT OF CONCISE NOTE 16 General Power increase to 64%, limit due to 17 II transmission line instabilities -
March 17th.
18 II Power increased to 100%, transmission line 19 II limits modified - March 28th.
Power reduced 20 II to 80%, condensate pump work - April 5th.
') 1 II Power increased to 100% - April 6th.
22 II Power reduced to 70%, qenerator protection 23 II relay problems - April 15th.
The refuelincr 24 II outage is tentatively scheduled to begin 25 II October 2 I l987.
New fuel receipt is 26 tantat,ively schedule'd to be received on site 27 II July 9th, July 16th, July 23rd, July 30th, 28 August 6th, and August 13th, 1987.
29 H
Cumulative Cycle Bvrnup through *April 9' 1987 30 II 10773.41 MWDf"MTM 961238.79 MWD.
To the best of my knowledge and belief, the information given above and in any attached schedules is true, complete, and correct.
- 9. SIGNATURE (See instruction~;::.s regarding confidential~
- 10. TITLE 11, DATE
?, AA
}
General Manager *- Salem Opera;tions 4/22/87
~- r-r I
.v.
18 U.S.C. SECTION 1001; ACT OF JUNE 25, 1948; 62 STAT. 749; MAKES IT A CRIMINAL OFF.TO MAKE A WILLFULLY FALSE STATEMENT OR REPRESENTATION TO AN.
DEPARTM.R AGENCY OF THE UNITED STATES AS TO ANY MATT.ERS WITHIN ITS JUR
- T'ION.
.