Forwards Revs to Salem Generating Station Inservice Testing Program (Pumps & Valves), for Units 1 & 2.Revs Result of Extensive Review of Sys Components Required to Place & Maintain Reactors in Shutdown Condition
ML18092B297
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/24/1986
From: Corbin McNeil
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18092B298 List:
References
NLR-N86130, NUDOCS 8610060172
Download: ML18092B297 (2)


Text

Public Service Electric and Gas Company Corbin A. McNeill, Jr. Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 Vice President -

Nuclear September 24, 1986 NLR-N86130 United States Nuclear Regulatory Commission Of ftce of Nuclear Reactor Regulation Division of Licensing Washington, DC 20555 Attention: Mr. Steven A. Varga, Director PWR Project Directorate #3 Division of PWR Licensing A Gentlemen:

INSERVICE TESTING PROGRAM REVISIONS (RE: LER 86-002-00)

SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-311 AND 50-272 In accordance with the commitments made in LER 86-002-00, PSE&G hereby transmits Revision 4 to the Salem Unit No. 1 Inservice Testing (pump and valve) Program and Revision 3 to the Salem Unit No. 2 Inservice Testing Program. These documents supersede those previously transmitted on December 31, 1985 and January 28, 1986, respectively. These programs will be. in effect within 30 days; at which time procedures will be approved and in place.

These submittals are the result of an extensive review of systems and components required to place and maintain the reactors in a safe shutdown condition. The following is a summary of the types of changes made to the programs as a result of the reviews:

1. No changes were made to the pump testing programs.
2. Valves were added and deleted as appropriate.
3. Relief requests for valves were deleted, modified or added based on the guidance provided by the NRC SER on this subject dated April 12, 1983.
4. We have maintained the relief requests to incorporate 90 day frequency for pump testing, deletion of all Category E valves and incorporation of the passive valve concept as described in later NRC approved editions of ASME
'/'--

Section XI.

8610060172 860924 pPDR ADOCK 05000272 PDR__ _

Mr. Steven A. Varga 2 9/24/86 Also, in accordance with the LER commitments, initial training was completed for personnel in our Operations Staff, ISI Staff and QA Staff.

Sincerely, Attachments C Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector