ML18092B289

From kanterella
Jump to navigation Jump to search
Forwards Operating Ltr Re IAEA Surveillance Interval for 860618-0826
ML18092B289
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/12/1986
From: Corbin McNeil
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
References
NLR-N86121, NUDOCS 8609220037
Download: ML18092B289 (2)


Text

-: )

Public Service Electric and Gas Company Corbin A. McNeill, Jr.

Vice President -

Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 Nuclear September 12, 1986 NLR-N86121 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:

Mr. Steven A. Varga, Director Project Directorate #3 Division of PWR Licensing Gentlemen:

OPERATING LETTER SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 Attached is the operating letter for Salem Unit No. 1 for the IAEA surveillance interval of June 18, 1986 to August 26, 1986.

Sincerely, Attachment C

Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector Mr. Eugene Sparks Safeguards Material Licensing and International Activities Branch Office of Nuclear Material Safety


~~


= 912

.~20003cZ ~i8oo272 1,

PPR AD PDR p

and Safeguards

~

Page f of I P:iges DOE/NRC FORM 740M U.S. DEPARTMENT OF ENERGY Approved by *0 MB (12-81)

AND 038-R0477 MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY COMMISSION Approved by OMS AUTHORIZED BY 10 CFR 30, 40, SO, 3150-0057 10, 75, 150, Public Laws83-703, CONCISE NOTE 93-438. 95-91

1. NAME
2. ATTACHMENT TO
13. RIS
4. REPORTING PERIOD Public Service Electric and Gas Co.

a.0DOE/NRC 741 b.0DOE/NRC742 c.0DOE/NRC 742c I ~UXHF- _, ~ -~

FROM

!TO STREET ADDRESS 5, TRANSACTION DATA 6/18/86 8/26/86 P.O. Box 236

a. SHIPPER'S
b. RECEIVER'S c. TRANS. NO.
d. coRn o, PC I, AC Ui\\li\\
6. REPORTING DATE RIS RIS NO.

CUD!

CITY I

STATE I ZIP CODE

7. LICENSE NUMBERS Hancocks Bridge New Jersey 08038 DPR70 Ba. LINE NO.

b, ENTRY REFERENCE

c. TEXT OF CONCISE NOTE 1

Whole Report Operating letter -

Salem Unit 1 -

I.A.E.A.

2 II During the I.A.E.A. surveillance interval 3

II from June 18 to August 26, there were no 4

II fuel transactions conducted in Unit 1 Fuel 5

II Handling Building.

A skimmer filter hose 6

II assembly was repaired usinq a underwater 7

II diver on July 17 at 1500 to 1600.

No new 8

II fuel receipt or fuel shipment was conducted.

9 II The Fuel Handlina Bnilnina 1 icrht-incr n::inpl

10.

II breakers have been caution tagged requiring 11 II Engineering e

Rx.

notification prior to 12 II operation.

No notification was received 13 II by Rx *. Engineering during this period.

To the best of my knowledge and belief, the information given above and in any attached schedules is true, complete, and correct.

9. SIGNATURE (See inst~orzvisions;!Jar~nfidentiality.)
10. TITLE
11. DATE

,J

)

General Manager - Salem Operations 8/26/86 f

r, u

\\

E

,v FJ NE s A

I '.

I B J. S. C. S CT ION I O O I, l\\C T 0 U

7, I J4 8, 6 2 ST T.

4 ~, MAI-I.ES IT A Cf11MINAL OFFENSE TO MAKE A WILLFULLY FALSE s TATLMl:Nl' OH H~Pl!l*Sl NU\\f'ION 101\\NY DIY/\\nTMrNT 011 /\\COFNCY OF Tl 11-lJNI 11 I> s T /\\l r*s /\\S Tn /\\NY M/\\Tl I ns Wll 1 llN ITS.llllllSlllC r ION,