ML18092B289
| ML18092B289 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 09/12/1986 |
| From: | Corbin McNeil Public Service Enterprise Group |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| NLR-N86121, NUDOCS 8609220037 | |
| Download: ML18092B289 (2) | |
Text
-: )
Public Service Electric and Gas Company Corbin A. McNeill, Jr.
Vice President -
Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 Nuclear September 12, 1986 NLR-N86121 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:
Mr. Steven A. Varga, Director Project Directorate #3 Division of PWR Licensing Gentlemen:
OPERATING LETTER SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 Attached is the operating letter for Salem Unit No. 1 for the IAEA surveillance interval of June 18, 1986 to August 26, 1986.
Sincerely, Attachment C
Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector Mr. Eugene Sparks Safeguards Material Licensing and International Activities Branch Office of Nuclear Material Safety
~~
= 912
.~20003cZ ~i8oo272 1,
and Safeguards
~
Page f of I P:iges DOE/NRC FORM 740M U.S. DEPARTMENT OF ENERGY Approved by *0 MB (12-81)
AND 038-R0477 MANDATORY DATA COLLECTION U.S. NUCLEAR REGULATORY COMMISSION Approved by OMS AUTHORIZED BY 10 CFR 30, 40, SO, 3150-0057 10, 75, 150, Public Laws83-703, CONCISE NOTE 93-438. 95-91
- 1. NAME
- 2. ATTACHMENT TO
- 13. RIS
- 4. REPORTING PERIOD Public Service Electric and Gas Co.
a.0DOE/NRC 741 b.0DOE/NRC742 c.0DOE/NRC 742c I ~UXHF- _, ~ -~
FROM
!TO STREET ADDRESS 5, TRANSACTION DATA 6/18/86 8/26/86 P.O. Box 236
- a. SHIPPER'S
- b. RECEIVER'S c. TRANS. NO.
- d. coRn o, PC I, AC Ui\\li\\
- 6. REPORTING DATE RIS RIS NO.
CUD!
CITY I
STATE I ZIP CODE
- 7. LICENSE NUMBERS Hancocks Bridge New Jersey 08038 DPR70 Ba. LINE NO.
b, ENTRY REFERENCE
- c. TEXT OF CONCISE NOTE 1
Whole Report Operating letter -
Salem Unit 1 -
I.A.E.A.
2 II During the I.A.E.A. surveillance interval 3
II from June 18 to August 26, there were no 4
II fuel transactions conducted in Unit 1 Fuel 5
II Handling Building.
A skimmer filter hose 6
II assembly was repaired usinq a underwater 7
II diver on July 17 at 1500 to 1600.
No new 8
II fuel receipt or fuel shipment was conducted.
9 II The Fuel Handlina Bnilnina 1 icrht-incr n::inpl
- 10.
II breakers have been caution tagged requiring 11 II Engineering e
Rx.
notification prior to 12 II operation.
No notification was received 13 II by Rx *. Engineering during this period.
To the best of my knowledge and belief, the information given above and in any attached schedules is true, complete, and correct.
- 9. SIGNATURE (See inst~orzvisions;!Jar~nfidentiality.)
- 10. TITLE
- 11. DATE
,J
)
General Manager - Salem Operations 8/26/86 f
r, u
\\
E
,v FJ NE s A
I '.
I B J. S. C. S CT ION I O O I, l\\C T 0 U
7, I J4 8, 6 2 ST T.
4 ~, MAI-I.ES IT A Cf11MINAL OFFENSE TO MAKE A WILLFULLY FALSE s TATLMl:Nl' OH H~Pl!l*Sl NU\\f'ION 101\\NY DIY/\\nTMrNT 011 /\\COFNCY OF Tl 11-lJNI 11 I> s T /\\l r*s /\\S Tn /\\NY M/\\Tl I ns Wll 1 llN ITS.llllllSlllC r ION,