Responds to NRC Re Violations Noted in Insp Repts 50-272/86-02 & 50-311/86-02.Corrective Actions:Elements for Improvements of Radiochemical Measurements Program Listed
ML18092B139
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/14/1986
From: Corbin McNeil
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NLR-N86034, NUDOCS 8605060065
Download: ML18092B139 (2)


Text

),.

Public Service Electric and Gas Company Corbin A. McNeill, Jr.

Vice President -

Public Service Electric and Gas Company P.O. Box236, Hancocks Bridge, NJ 08038 609 339-4800 Nuclear April 14, 1986 NLR-N86034

u. s. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406 Attention:

Dr. Thomas E. Murley, Regional Administrator Gentlemen:

RADIOCHEMICAL MEASUREMENT IMPROVEMENT ACTION PLAN SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSE DPR-70 AND DPR-75 In response to follow-up item 86-02-02 in NRC combined Inspection Report 50-272/86-02 and 50-311/86-02 date March 17, 1986 and as the result of our own review efforts, we have developed an action plan for the improvement of our radio-chemical measurement program.

The proposed improvement action plan includes the following elements:

0 0

0 Counting Room Quality Control Procedures will be upgraded to enhance the formatting of collected data and include peak resolution by July 1, 1986.

Means of upgrading the quality of the electrical power provided to the Counting Room will be investigated with the intention of having equipment on line by January 1, 1987.

The Interlaboratory Comparison Program will be reviewed with the necessary changes expected to be in effect by October 1, 1986.

Actions already taken to improve the quality of our radiochemical measurements include the following:

0 0

Window air conditioners have been purchased and installed to assist in providing temperature regulation in the Counting Room.

Multi-Channel Analyzer detector vibration problems have been investigated; identified problems were corrected.

  • /o

\\o 0

,~;

~ }' '1.... '

      • .... ~,

I r

\\

Dr. Thomas E. Murley 2 -

0 A tentative revision to the Counting Room Quality Control Procedure has been drafted.

4/14/86 0

Electrical power line-conditioning has been used to reduce noise to the multi-channel analyzer with some improvement in results.

Should you have any questions, we will be pleased to discuss them with you.

C Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector Sincerely,