Forwards Response to NRC 850722 Request for Addl Info on Generic Ltr 83-28,Item 4.5.3 Re Intervals for Online Testing.Testing Frequencies in 851017 Application for Tech Spec Change Will Be Used
ML18092A847
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/16/1985
From: Corbin McNeil
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
References
GL-83-28, NUDOCS 8510220050
Download: ML18092A847 (2)


Text

.*

Public Service Electric and Gas Company Corbin A. McNeill, Jr.

Vice President -

Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 Nuclear U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. c.

20555 October 16, 1985 Attention:

Mr. Steven A. Varga, Chief Operating Reactors Branch, No. 1 Gentlemen:

REQUEST FOR ADDITIONAL INFORMATION FOLLOWING PRELIMINARY STAFF REVIEW OF LICENSEE RESPONSES TO GENERIC LETTER 83-28 SALEM UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Pursuant to the subject request for additional information dated July 22, 1985, PSE&G herewith submits its response to Item 4.5.3 in the attachment to this letter.

Should you have any questions we will be pleased to discuss them with you.

Attachment C

Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector

,/---

8510220050 851016 PDR

  • ADOCK 05000272

~p

PDR,
i Sincerely,

J./ l J

SALEM UNITS 1 AND 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ON GENERIC LETTER 83-28 Item 4.5.3 Licensee needs to provide results of review of existing or proposed iritervals for~n-line testing considering the concerns of 4.5.3.1 to 4.5.3.5 in the generic letter.

This information shall show how the selected intervals result in high reactor trip system availability and proposed T.S. changes resulting from this review shall be submitted for review.

Response

PSE&G is a member of the Westinghouse Owners Group (WOG) that initiated a program to review instrumentation technical specifications.

In February 1983 the WOG submitted WCAP-10271, "Evaluation of Surveillance Frequencies and Out of Service Times for the Reactor Protection Instrumentation System," to the NRC for review.

After WOG provided additional information, the NRC issued a Safety Evaluation Report in February 1985 which approved quarterly testing, 6-hour outage time, increased test time and testing in bypass for analog channels.

PSE&G concurs with this study and will request appropriate Technical Specification changes in accordance with guidance provided by the WOG.

The reactor trip breakers were deleted from the above study pending the results of other WOG sponsored testing programs.

These programs include Life Cycle Testing, Class lE Testing and an Aging Program.

PSE&G is supporting the issuance of WOG a contract to Westinghouse Inc. to complete an evaluation of surveillance frequencies for the reactor trip breakers.

In the interim, PSE&G will use the testing frequencies agreed upon between the NRC and PSE&G which have either been incorporated previously into our Technical Specifications or are included in our request for Technical Specifications amendment, LCR 84-13, dated October 17, 1985 *