ML18092A809

From kanterella
Jump to navigation Jump to search
Forwards Dcrdr for Pse&G,Salem Station Units 1 & 2, Addendum & List of Proposed Changes Which Resulted from NRC Preimplementation Audit,In Response to 850417 Sser
ML18092A809
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/16/1985
From: Corbin McNeil
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18092A810 List:
References
NUDOCS 8509250177
Download: ML18092A809 (4)


Text

{

r~ .

I I

  • Public Service Electric and Gas Company Corbin A. McNeill, Jr. Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 Vice President -

Nuclear September 16, 1985 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch, No. 1 Division of Licensing

Dear Mr. Varga:

DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)

SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Your letter of April 17, 1985 transmitted your supplemental Safety Evaluation Report (SSER) with respect to our Detailed Control Room Design Review (DCRDR) report, which was submitted to you on December 29, 1983. In response to your SSER, PSE&G hereby submits three (3) copies of its addendum to the DCRDR report, dated September, 1985~ which completes our control room review.

Our letter of September 18, 1984 indicated that design changes to correct human engineering discrepancies (HEDs) identified in the DCRDR would be implemented during the 1986 refueling outages for the Salem units. However, as a result of your November 1984 pre-implementation audit, the scope of these design changes has increased substantially, as can be seen on the attached summary listing of additional changes. Inasmuch as it is our policy to implement major design changes in a coordinated fashion, our overall approach for implementation of HED corrections will be re-evaluated. We will provide our implementation schedule upon receipt of your written approval of our proposed HED corrections.

Should you have any questions, do not hesitate to contact us-~

Sincerely, J,o&

Attachment ffl ,,,

Mr. Steven A. Varga September 16, 1985 C Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector

SALEM GENERATING STATION DETAILED CONTROL ROOM DESIGN REVIEW Proposed Changes Which Resulted From the NRC Pre-implementation Audit HED NO. PAGE NO. DESCRIPTION OF CHANGE 2 5 Move the Dymac Probe Monitors on RPl to aoree with the human factor guidelines of 78.3 inches. The monitors are presently 90 inches above the ground.

14 22 Provide a stool to be used for reading these monitors.

55 161 Rod position indications will be provided on the SPDS.

57 163 Color code the indicators on the console base consistent with the color coding conventions for the various instrument buses such that a parti-cular bus failure could be associated with the indicators powered by that bus.

123 114 Provide modular label for the Pressurizer Over-pressure Protection Bezel.

141 437 Interchange the location of the 13 (23) Turbine Auxiliary pump indicator (IA-5392IB) and push-button module (PD-5391IB) such that the indicator will will be on the left of pushbutton module. They are located in the Turbine Auxiliary Cooling Water bezel.

247 143 Replace the reactor vessel vent valves key lock switches on RP2. The key should be in the vertical position when the switch is off.

251 245 Change procedures to indicate turbine oil reservoir level in percent instead of feet.

This will agree with the level recorder.

405 169 Provide nameplate with directions on how the recorder scale should be read.

432 334 Perform the necessary maintenance to ensure readable indications on the paper of the stator water system conductivity recorder.

HED NO. PAGE NO.

DESCRIPTION OF CHANGE 478 419 Nos. 11, 12 and 13 Control Room AVS Fan Controls are located in channels A, B and C respectively on the Hot Shutdown Panel (PL 213), However, the location of these controls are not consistent within the three channels. Relocate these controls such that they will be in correspond-ing locations for their respective channels.

512 342 Provide labels for channel and pen colors for the strip chart recorders located on the reactivity computer rack.

550 31 Provide low glare parabolic diffusers for light 625 27 grids in control room. Provide glare shields 626 28 for the CRTs as necessary.

562 195 Replace Texas Instrument recorders in the 563 335 control room with Leeds and Northrup recorders.

622 27 5 680 465 Identify the pushbuttons on the control console which require a push and hold mode of operation as such. Engrave an "H" for hold on the insert.

535 59 Correct these HEDs in conjunction with the over-717 64 head annunciator system updgrade.

541 65 716 67 543 69 502 82 492 75 530 55 711 49 715 50 722 Include the step in the procedures.

ac39 1/2