ML18092A742
| ML18092A742 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/19/1985 |
| From: | Corbin McNeil Public Service Enterprise Group |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML18092A743 | List: |
| References | |
| NUDOCS 8508280277 | |
| Download: ML18092A742 (2) | |
Text
Public Service Electric and Gas Company Corbin A. McNeill, Jr.
Vice President -
Public Service Electric and Gas Company P.O. Box236, Hancocks Bridge, NJ 08038 609 339-4800 Nuclear August 19, 1985 Dr. Thomas E. Murley; Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
Dear Dr. Murley:
QUALITY ASSURANCE PROGRAM DESCRIPTION SALEM GENERATING STATION NO. 1 AND 2 UNITS DOCKET NOS. 50-272 AND 50-311 The revised Operational Quality Assurance Program description (Attachment 1) is hereby submitted in accordance with the requirements of 10CFR50.54.
The document incorporates those changes identified in our letter dated December 6, 1984 as well as editorial changes to correct typographical errors and enhance readability.
Justifications for the significant changes are provided in Attachment 2.
The changes do not involve a reduction in commitments made to the Operational Quality Assurance Program previously accepted by the NRC.
The Quality Assurance Program continues to satisfy the criteria of 10CFR50 Appendix B.
Additionally, PSE&G is currently reorganizing its Nuclear Department.
Appropriate changes to the Operational Quality Assurance Program description will be submitted in the near future.
Sincerely, Attachments
'\\'
Dr. Thomas c Mr. Donald C. Fischer Licensing Project Manager w/att.
Mr. Thomas Kenny w/att.
Senior Resident Inspector USNRC -
Document Control Room w/att.
USNRC -
Region IV w/att.
Vendor Program Branch 8-19-85