Public Service Electric and Gas Company Corbin A. McNeill, Jr.
Vice President -
Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 Nuclear August 6, 1985 U.S. Nuclear Regulatory Cormnission Off ice of Nuclear Reactor Regulation Division of Licensing Washington, D. c. 20555 Attention:
Mr. Steven A. Varga, Chief Operating Reactors Branch, No. 1 Gentlemen:
AUXILIARY FEEDWATER PUMP RELIABILITY FACILITY OPERATING LICENSE DPR-75 UNITS NO. 2 SALEM GENERATING STATION DOCKET NO. 50-311 Facility Operating License Condition 2.C(24)(c)(ii) required-the perfonnance of a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> endurance test for all auxiliary feedwater system pumps prior to initial operation at 100 percent power and submission of a report on the results within 60 days of completion.
This License Condition was previously satisfied.
Recently, PSE&G replaced a damaged auxiliary feedwater pump on Unit No. 2 with a pump of similar design capability; but, from a different manufacturer.
To meet the intent of the referenced license condition, the new pump was also tested for 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />s~ The pump tested satisfactorily and the results of the test are available for NRC review.
If you should have any questions regarding this matter, we will be pleased to discuss them with you.
Sincerely,
.**... 8508150437 850806