ML18092A685

From kanterella
Jump to navigation Jump to search
Forwards Corrected Tech Spec 3/4 3-21,incorporating Actions 17 & 18,inadvertently Deleted from Amend 60 to License DPR-70,per NRC
ML18092A685
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/30/1985
From: Corbin McNeil
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18092A686 List:
References
NUDOCS 8508080519
Download: ML18092A685 (1)


Text

Public Service Electric and Gas Company Corbin A. McNeil!, Jr.

Vice President -

Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 Nuclear July 30, 1985 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Mr. Steven A. Varga, Chief Operating Reactors Branch 1 Division of Licensing Gentlemen:

REQUEST FOR CORRECTION OF AMENDMENT FACILITY OEERATING LICENSE DPR-70 UNIT NO. 1 SALEM GENERATING STATION DOCKET NO. 50-272 Your letter dated March 8, 1985 transmitted Amendment 60 to the Salem Generating Station Unit No. 1 operating license.

One of the changes made by the Amendment was to provide for two hours in bypass for surveillance testing in ACTION 13 on page 3/4 3-21.

Inadvertently, ACTION 17 and ACTION 18 on the same page were deleted.

we are requesting that the enclosed page which incorporates both the original requested change and the deleted ACTION STATEMENTS, be issued as a correction.

Enclosure C

Mr. Donald C. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector

-ssosoaos19 aso730 i

.pPDR ADOCK 05000272 PDR Sincerely,