Responds to NRC Re Violations Noted in Insp Repts 50-272/84-46 & 50-311/84-46.Corrective Actions:Future Design Control Audits Will Address Fire protection-unique Controls & Fire Protection Procedures Will Be Examined Annually
ML18092A629
Person / Time
Site: Salem  
Issue date: 05/28/1985
From: Corbin McNeil
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8506070335
Download: ML18092A629 (2)


Text

--.,,-

I.-

\\.

~.

Public Service Electric and Gas Company Corbin A. McNeill, Jr.

Vice President -

Public Service Electric and Gas Company P.O. Box236, Hancocks Bridge, NJ 08038 609 339-4800 Nuclear May 28, 1985 Dr. Thomas E. Murley, Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Dr. Murley:

UNRESOLVED ITEMS -

COMBINED INSPECTION REPORT_ NOS~ 50-272/84-46 AND 50-311/84-46 SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Your letter dated April 2, 1985 on the subject inspection identified two unresolved items, namely:

1).

Inadequate fire drill participation by fire brigade members, and 2).

Incomplete Biennial audit of the facility fire protection program.

Information concerning these items was provided to the NRC inspector (Mr. A. Krasopoulos) during his supplemental site visit (April 1-4, 1985) and in a subsequent meeting with him in your office on April 25, 1985.

It is our understanding that the first item is closed. provides the information to close the second item.

Should you have any questions, please contact us.

Sincerely, r---------

~BR6o7o33saso528- -----.

G ADOCK 05000272 PDR Attachment C

Mr. Donald c. Fischer Licensing Project Manager Mr. Thomas J. Kenny Senior Resident Inspector 1

I

~

A

~

ATTACHMENT l Unresolved Item - Additional Information.

Incomplete Biennial Audit (50-272/84-46-02 & 50-311/84-46-02)

)

Technical Specification 6.5.2.8.h requires that the facility fire protection program and implementing procedures be audited at least once per 24 months.

QA Programmatic controls associated with fire protection are audited as a part of the two-year audit cycle required by ANS 3.2/ ANSI Nl8.7.

In addition, fire protection -

unique administrative controls, such as fire brigade training, control of combustibles and ignition sources, and inspection/test of fire protection equipment are audited annually.

As a result of discussions with Mr. A. Krasopoulos, it is our understanding that the following additional measures will close this item:

1.

Future programmatic audits of Design Control will address fire protection-unique controls.

2.

Annual fire protection audits will include examination of document controls associated with fire protection procedures.

These measures will be implemented by November 30, 1985 *