ML18089A612
| ML18089A612 | |
| Person / Time | |
|---|---|
| Site: | 05200046 |
| Issue date: | 03/30/2018 |
| From: | Kim H Korea Hydro & Nuclear Power Co, Ltd |
| To: | William Ward Document Control Desk, Office of New Reactors |
| Shared Package | |
| ML18089A611 | List: |
| References | |
| MKD/NW-18-0048L | |
| Download: ML18089A612 (2) | |
Text
70-1312-gil, Yuseong-daero, Yuseong-gu, Daejeon, 305-343, KOREA Tel: +82-42-870-5400 / Fax: +82-42-870-5449 http://www.khnp.co.kr March 30, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attention: Mr. William Ward Docket No.52-046 Division of New Reactor Licensing MKD/NW-18-0048L
Subject:
Submittal of Markup of the APR1400 DCA - Safety Evaluation with No Open Items for Chapter 3
Reference:
ADVANCED POWER REACTOR 1400 DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH NO OPEN ITEMS FOR CHAPTER 3 DESIGN OF STRUCTURES, SYSTEMS, COMPONENTS, AND EQUIPMENT, dated March 19, 2018 The purpose of this letter is to provide a markup of the safety evaluation report for Chapter 3 Design of Structures, Systems, Components, and Equipment. The safety evaluation report for Chapter 3 does not contain any proprietary information.
Enclosure provides a markup of the Safety Evaluation with No Open Items for Chapter 3 (Non-Proprietary).
If additional information or clarification is required, please contact Daegeun Ahn, Director of KHNP Washington DC Center at ahn.daegeun@khnp.co.kr or 703-388-0592.
Sincerely, Han-gon Kim Project Manager Advanced Reactors Development Laboratory Korea Hydro and Nuclear Power Co., Ltd
Enclosure:
Markup of the Safety Evaluation with No Open Items for Chapter 3 (Non-Proprietary)
Enclosure Markup of the Safety Evaluation with No Open Items for Chapter 3 (Non-Proprietary)
March 30, 2018