Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department August 19, 1983 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Steven Varga, Chief Operations Reactors Branch 1 Division of Licensing Gentlemen:
SUPPLEMENT TO REQUEST FOR AMENDMENT FACILITY OPERATING LICENSE DPR-70 NO. 1 UNIT SALEM GENERATING STATION DOCKET NO. 50-272 Ref:
LCR 83-04 Our letter of July 22, 1983 transmitted a request for license amendment to extend the interval for the Integrated Leak Rate Test (ILRT) at the Salem Generating Station Unit 1.
This letter provides additional information in support of the July 22, 1983 application.
At the time of our original application, the Cycle 5 outage was scheduled for August 1984 for Unit 1, with Unit 2 scheduled in the Spring of 1984.
PSE&G has decided to interchange Unit 1 and Unit 2 outage schedules such that the Unit 1 outage will commence May 31, 1984.
This revised outage schedule will ensure that the ILRT will be performed well within the 5-year interval endorsed in the current industry standard, ANSI N56.8-1981.
In addition to rescheduling the Cycle 5 outage, we will imple-ment the following increased surveillance program.
Surveillance of containment isolation valves, which have exhibited high or moderately high leakage rates during the previous local leak rate tests will be increased for those valves which are testable during power operation.
This includes valves lVC-1, lVC-2, lVC-3, lVC-4, lVC-7, lVC-8, lVC-9 and lVC-10.
Surveillance will be increased by reducing the scheduled intervals from once every 8308240503 830819 PDR ADOC~ 05000272 p
PDR Ao111 t/o Tile Energy People 95-2168 (SOM) 11-82
Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 8/19/83 24 months for lVC-7 through 10 and from 6 months tor lVC-1 through 4 to once every three months.
Valves not testable during power operation will be tested when the earliest opportunity exists; e.g., unscheduled cold shutdown with affected portions of the systems drained.
This includes valves 12CS-2, llCA-330, 12CA-330, lCC-136, lCC-215, lCV-74, lFP-147 and lFP-148.
CC:
Mr. Donald C. Fischer Licensing Project Manager Mr. Leif Norrholm Senior Resident Inspector Very truly yours,
~ A- µ,_/'j<NY' E. A. Liden Manager -
Nuclear Licensing and Regulation Mr. Frank Cosolito, Acting Chief Bureau of Radiation Protection Department of Environmental Protection 380 Scotch Road Trenton, New Jersey 08628