Letter Submittal of Impingement of Aquatic Organisms Reportable Occurrence on December 23, 1976, in Accordance with Technical Specification 5.6.2.a.2 to Provide 30-Day Notification
ML18088B249
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/20/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Moseley N
Office of Nuclear Reactor Regulation
References
L-77-25
Download: ML18088B249 (6)


Text

NRC FORM 196 I2.76)

U.S. NUCLEAR REGULATOR MMISSION

)

DOCKET NUMBER 50-335 NRQDISTRIBUTION FoR PART 50 DOCKET MATERIAL FILE NUMBER TO:

'-Mr;" Norman C..Moseley FROM:

Florida Power

& Light Company Miami, Florida Mr. Robert E. Uhrig DATE OF DOCUMENT 1 20 77 DATE RECEIVED 2

2 77 QJLETTE R g6R IGINAL

~QCOPY

'CINOTO R IZ E D SUNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED

'. One si'ed;.

DESCRIPTION Ltr. trans the following:

ENCLOSURE

'i

~.

yl

'I

~ ~

Environmental Repor a

e Occurrence No~

'335-B-76-05.On 12/23/76 -concerning~a special

. surveillance scheduled,'egarding impingement of.aquatic organisms~.nat.being taken...

~ ~. ~ ~

. PLANT NAME:

St. Lucie <tl (1-P)

~

)

j (1-P) ACKNOWMDGED

.DO NOT REMOVE SAFETY ASSIGNED.AD:

FOR ACTION/INFO RMATION 2 4 77 RJL R

C GUIANA L C ASST

-.::Ziemann-

.-. Silver-..

Di s.

T Re an PROJECT MANAGER L

ch LIC ASST 0

Duncan REG FIL NRC PDR I-& E OELD GOSSICK.&. STAFF

MIPC<<

CASE.

HANAUER HARLESS

.PROJECT MANAGEMENT BOYD PE COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT INTERNALD SYSTEMS SAFETY HEINEMAN

- 'SCHROEDER

-.-ENGINEERING

>>MACARRY-

- -.-.KNIGHT-'"

'-'-SDWEIL PAWL CK

REACTOR-SAFE ROSS NOVAK ROSZTOCZY CHECK AT& I

SALTZMAN, RUTBFRG EXTERNAL DISTRIBUTION ISTRI BUTION PLANT SYSTEMS TEDESCO IPPOLITO--'..-

~

0 ' I'Q 'i

~

OPERATING-.REACTORS STELLO OPERATING TECH EISENHUT S

TE SAFE ERNST BALLARD SPANGLER SITE TECH GAMIIILL STEPP HULMAN SITE ANALYSIS

'OLLMER BUNCII J0 COLLINS KREGER CONTROL NUIVIBER LPDR0 TIC:

r Fla NAT LAB'QlL REG V IE B 0 ULRIKSON OR NSIC:"

ASLB:

ACRS CYS EiQRBR4C/

NRC FORM 155 I2-76)

LA PDR CONSULTANTS:

/4 ZD

0

~ 040

~ Ot

~

H

P.O. BOX 013100, MIAMI, FL 33101 gkl Ih~

FLORIDAPOWER & LIGHTCOMPANY January 20, 1977 L-77-25 Norman C. Moseley, Director Office of Inspection and Enforcement, Region I U. S. Nuclear Regulatory Commission 230 Peachtree

Street, N. W., Suite 1217

'ggg

]gP@

Atlanta, Georgia 30303 Mgg REPORTABLE OCCURRENCE No. 335-B-76-05 ST.

LUCIE PLANT UNIT 1 DATE OF OCCURRENCE:

December 23, 1976 IMPINGEMENT OF AQUATIC ORGANISMS The attached Non-Routine Environmental Operating Report is being submitted in accordance with Technical Specification

5. 6. 2. a. 2 to provide 30-day notification of the subject occurrence.

Very truly yours, Robert E. Uhrig Vice President REU/JPF/hlc Attachment cc:

John G. Davis, Office'of, Inspection 6 Enforcement',

NRC Robert Lowenstein=,

.Esq.

tgeguiatory Docket File gg80 PEOPLE... SERVING PEOPLE

FLORIDA POWER

& LIGHT COMPANY ST.

LUCIE UNIT NO.

1 REPORTABLE OCCURRENCE NO. 335-B-76'-05

Title:

IMPINGEMENT OF AQUATIC ORGANISMS A.

Descri tion, Anal sis and Evaluation On December 23,

1976, a special surveillance scheduled for that day was not taken, and there-fore was missed.

Specification 4.2, Impingement of Aquatic Organisms, requires that intake screens washings be examined for a consecutive twenty-four hour period, twice a week.

The first surveillance for that week was done on December 20, but the second

one, on December 23, was missed.

December 23, 1976 was observed by Florida Power Light Company as a holiday, along with December 24.

Maintenance personnel were not scheduled to work on the holiday to dump the Basket with the washings.

When personnel responsible for the surveillance arrived at the site and found no maintenance personnel, they assumed that, the surveillance had been rescheduled for the following week, unaware of what the frequency requirements were.

Even though procedures exist that tell personnel how often this surveillance must be met, the surveillance was missed.

The above reasons coupled with some communications break-

downs, caused us to miss a Technical Specification Surveillance.

One group failed to schedule the required maintenance personnel, and a second group failed to inform the first group that there were no maintenance personnel at the site.

Because of this communication breakdown, the missed surveillance was not recognized until Monday, December 27, 1976.

B.

Corrective-."Act,ion Personnel involved in this program have been instructed to familiarize themselves with the required procedures to insure that any time a surveillance is not performed as scheduled, that the proper personnel be contacted as per procedure in order to initiate corrective action as soon as possible.

Scheduling mechanisms have been implemented to provide follow-up, as an added(insurance in case a similar situation develops,"and it, can be avoided.

ll,yp~

~5Z pp 8

+op.9 g~ ~"~yg,,

-pg

'0 -. Aho~ k"/q~

~'n

)