ML18088B249

From kanterella
Jump to navigation Jump to search
01/20/1977 Letter Submittal of Impingement of Aquatic Organisms Reportable Occurrence on December 23, 1976, in Accordance with Technical Specification 5.6.2.a.2 to Provide 30-Day Notification
ML18088B249
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/20/1977
From: Robert E. Uhrig
Florida Power & Light Co
To: Moseley N
Office of Nuclear Reactor Regulation
References
L-77-25
Download: ML18088B249 (6)


Text

U.S. NUCLEAR REGULATOR MMISS ION DOCKET NUMBER NRC FORM 196 )

I2.76) 50-335 FILE NUMBER NRQDISTRIBUTION FoR PART 50 DOCKET MATERIAL TO: FROM: DATE OF DOCUMENT Florida Power & Light Company 1 20 77

'-Mr;" Norman C..Moseley Miami, Florida DATE RECEIVED Mr. Robert E. Uhrig 2 2 77 QJLETTE R 'CI NOTO R I Z E D PROP INPUT FORM NUMBER OF COPIES RECEIVED g6R IGINAL SUNCLASSIFIED

~QCOPY '. One si'ed;.

DESCRIPTION ENCLOSURE 'i ' ~. yl

'I ~ ~

Ltr. trans the following: Environmental Repor a e Occurrence No~

'335-B-76-05 .On 12/23/76 -concerning~a special

. surveillance scheduled,'egarding impingement of .aquatic organisms~ .nat.being taken... ~ ~ . ~ ~

~

)

j (1-P) (1-P) ACKNOWMDGED

. PLANT NAME:

St. Lucie <tl .DO NOT REMOVE GUIANA SAFETY FOR ACTION/INFO RMATION 2 4 77 RJL ASSIGNED.AD:

-.:: Ziemann- T Re an R C .-. Silver- .. PROJECT MANAGER L ch L C ASST Di s. LIC ASST 0 Duncan INTERNAL D IST RI BUTION REG FIL SYSTEMS SAFETY PLANT SYSTEMS S TE SAFE NRC PDR HEINEMAN TEDESCO I-& E  : - 'SCHROEDER OELD GOSSICK.&. STAFF -.-ENGINEERING IPPOLITO--'..-

MIPC<< >>MACARRY- ERNST CASE. - -.-.KNIGHT-'" ~ 0 ' I'Q 'i ~

BALLARD HANAUER '-'-SDWEIL OPERATING-.REACTORS SPANGLER HARLESS PAWL CK STELLO SITE TECH

.PROJECT MANAGEMENT REACTOR- SAFE OPERATING TECH GAMIIILL BOYD ROSS EISENHUT STEPP PE COLLINS NOVAK HULMAN HOUSTON ROSZTOCZY PETERSON CHECK SITE ANALYSIS MELTZ 'OLLMER HELTEMES AT& I BUNCII SKOVHOLT SALTZMAN, J0 COLLINS RUTBFRG KREGER EXTERNAL DISTRIBUTION CONTROL NUIVIBER LPDR0 r Fla NAT LAB 'QlL B 0 TIC: REG V IE ULRIKSON OR NSIC:"

ASLB:

LA PDR CONSULTANTS:

/4 ZD ACRS CYS EiQRBR4C/

NRC FORM 155 I2-76)

0 ~ 040 ~ Ot ~ H P.O. BOX 013100, MIAMI, FL 33101 gkl Ih~

FLORIDA POWER & LIGHT COMPANY January 20, 1977 L-77-25 Norman C. Moseley, Director Office of Inspection and Enforcement, Region I U. S. Nuclear Regulatory Commission 230 Peachtree Street, N. W., Suite 1217 Atlanta, Georgia 30303

'ggg Mgg

]gP@

REPORTABLE OCCURRENCE No. 335-B-76-05 ST. LUCIE PLANT UNIT 1 DATE OF OCCURRENCE: December 23, 1976 IMPINGEMENT OF AQUATIC ORGANISMS The attached Non-Routine Environmental Operating Report is being submitted in accordance with Technical Specification

5. 6. 2. a. 2 to provide 30-day notification of the subject occurrence.

Very truly yours, Robert E. Uhrig Vice President REU/JPF/hlc Attachment cc: John G. Davis, Office'of, Inspection 6 Enforcement', NRC Robert Lowenstein=, .Esq.

tgeguiatory Docket File gg80 PEOPLE... SERVING PEOPLE

FLORIDA POWER & LIGHT COMPANY ST. LUCIE UNIT NO. 1 REPORTABLE OCCURRENCE NO. 335-B-76'-05

Title:

IMPINGEMENT OF AQUATIC ORGANISMS A. Descri tion, Anal sis and Evaluation On December 23, 1976, a special surveillance scheduled for that day was not taken, and there-fore was missed. Specification 4.2, Impingement of Aquatic Organisms, requires that intake screens washings be examined for a consecutive twenty-four hour period, twice a week. The first surveillance for that week was done on December 20, but the second one, on December 23, was missed.

December 23, 1976 was observed by Florida Power &

Light Company as a holiday, along with December 24.

Maintenance personnel were not scheduled to work on the holiday to dump the Basket with the washings.

When personnel responsible for the surveillance arrived at the site and found no maintenance personnel, they assumed that, the surveillance had been rescheduled for the following week, unaware of what the frequency requirements were. Even though procedures exist that tell personnel how often this surveillance must be met, the surveillance was missed. '

The above reasons coupled with some communications break-downs, caused us to miss a Technical Specification Surveillance.

One group failed to schedule the required maintenance personnel, and a second group failed to inform the first group that there were no maintenance personnel at the site.

Because of this communication breakdown, the missed surveillance was not recognized until Monday, December 27, 1976.

B. Corrective-."Act,ion Personnel involved in this program have been instructed to familiarize themselves with the required procedures to insure that any time a surveillance is not performed as scheduled, that the proper personnel be contacted as per procedure in order to initiate corrective action as soon as possible.

Scheduling mechanisms have been implemented to provide follow-up, as an added(insurance in case a similar situation develops,"and it, can be avoided.

ll,yp~

+op

~

.9 5Z 8

~"~yg,,

pp

-pg g~

'0 -. Aho~

~'n k"/q~

)