| Site: | Salem |
| Issue date: | 04/08/1983 |
| From: | Uderitz R Public Service Enterprise Group |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18087A817 | List: |
| References | |
| NUDOCS 8304110762 | |
| Download: ML18087A816 (2) | |
Text
Richard A. Uderitz Public S~rvice Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 935-6010 Vice President -
Nuclear April 8, 1983 Mr. Darrell G. Eisenhut, Director Division of Licensing Off ice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Eisenhut:
SUPPLEMENT TO CORRECTIVE ACTION PROGRAM REACTOR TRIP BREAKER FAILURES NO. 1 AND 2 UNIT SALEM GENERATING STATION DOCKET NO.
50-27~ AND 50-311 Transmitted herewith is PSE&G's supplemental report dated April 8, 1983 covering its investigation and corrective action program related to the February 22 and 25, 1983 reactor trip breaker failure events which occurred at Unit 1 of the Salem Generating Station.
The report addresses the issues identified in the NRC staff's Salem Restart Status Report, dated March 29, 1983.
All issues that have been raised as a result of the reactor trip breaker failure events have been addressed in this report.
Those action items which have not been completed include scheduled completion dates.
All short term action items will be completed prior to startup of the unit.
PSE&G considers the circumstances associated with the reactor trip breaker failures an isolated event.
Our management systems and QA program are basically sound.
This position is based on extensive studies and reviews of procedures, practices and past activities in procurement, maintenance and operations.
Some shortcomings have been identified and specific corrective actions have been undertaken to preclude
--~--~
r*-0304-110762 030400 PDR ADOCK 05000272 5
Mr. Darrell G. Eisenhut, Director U.S. Nuclear Regulatory Commission 2 -
4/8/83 recurrence.
This report describes PSE&G's corrective action program in detail and provides the basis for our confidence that Salem Unit 1 can be safely returned to power operation.
This corrective action program will also be applied to Salem Unit 2, which is currently scheduled to return to service in May, 1983.
The short term items to be completed prior to startup of Unit 1 will similarly be completed prior to startup of Unit 2.
Sincerely, cc:
Mr. Richard w. Starostecki, Director Division of Project and Resident Program Region 1